Skip to main content
Skip to content
Case File
efta-efta00584443DOJ Data Set 9Other

WESTERN SYSTEMS

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00584443
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
WESTERN SYSTEMS PO Box 10495 Albu uerque NM 87184 Ofc Toll Free I Cell August 21, 2013 ZORRO DEVELOPMENT CORP 49 Zorro Ranch Road Stanley NM 87056 Attn: Bryce Gordon MAIN HOUSE - HOME THEATRE UPGRADE HOME THEATRE COMPONENTS (I J Sony VPLVW1000ES 4K Cinema Projector (I ) MinuteMan Battery Backup UPS (for the Projector) (I J Denon AVR4520O Surround Receiver w/4K Up scaling (I J Denon DBTI7I3UD 3D Ready Blu-Ray DVD Player with WiFi and IPad App (I J Minuteman Proll00LCD I I00VA Battery Backup UPS (For DVD and AirPort) (I J Apple TV (Provided by Owner) (2J Sunfire Amplifiers (Existing) (I J Stewart ABB20014FHLSB-12-3-8.25 no- Diagonal Filmscreen (Pending) (I) HDMI Cable Surround Receiver -> Projector (Existing) (I) HDMI Cable DVD Player -> Surround Receiver Monster Cable 2m (I) HDMI Cable Apple TV -Surround Receiver Monster Cable 2m (I) TosLink Cable AirPort -> Surround Receiver (Existing) (3) Line Level Cables Surround Receiver -> Powered Subwoofers (Existing) Cost Breakdown Materials, Components, direct Shipping 29,513.00 Installation, Setup and Custom Programming 2,510.00 Total Investment 32,023.00 Terms and Conditions This Proposal represents a firm bid price for new materials and components. Changes in design or conditions beyond the control of Western Systems may Adjust the installed cost. Required permits, fees and taxes additional. Travel Time and Mileage cost additional on a direct cost only basis Warranty Standard Limited Warranty, one full year, parts and labor, for new Materials, components, installation and programming. Existing Components, Cables and Wiring Circuits are not included in the Standard Limited Warranty EFTA00584443 MAIN HOUSE - HOME THEATRE UPGRADE -2- Acceptance This Proposal is subject to acceptance within 30 days By By Zorro Development Corp Western Systems EFTA00584444

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.