Skip to main content
Skip to content
Case File
efta-efta00584498DOJ Data Set 9Other

JE Punch List — October 30, 2012

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00584498
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List — October 30, 2012 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved - Red Polaris Bike - Power Steering Module Installation - COMPLETE - Lull — replacement parts — due at Tropical 11/1, unable to sail until 11/7 due to value over $2,500 3. Five Palms - Picture frame — on site, 86 x 70 - to forward selected picture, will frame locally - Mirrored siding — will continue to reglue as sections fall off - 17 new sections/glue — ETA on LSJ 11/2 4. Grotto - Mattress cover — completion delayed due to owner travelling to northeast — family issues, will update ASAP 5. Berm/Too of Hill - Hydroseed all top of hill/berm — COMPLETE — Brice investigating a different material 6. Triangle - Must design triangle - awaiting JE direction - Palms will be relocated once Lull is repaired 7. Flagpole Pool Cabana - Furniture — desk left Paris, awaiting ETA to STT - Pace clock — ordered 2 new units -1 for backup — due on site 11/8 - Auto closer on toilet door — David (carpenter) - COMPLETE - Add some lights near steps — COMPLETE — JE to review when on site 8. Floating Dock - Jet ski bumpers — COMPLETE — this installation has not resolved the issues of protecting the jet skis - Sea-Do Jet Ski — will need to review how this unit will be secured at dock - Dock box top & seat — one final attempt to refinish — David (carpenter) — COMPLETE will reinstall 11/2 - Dock boxes — struts to be replaced — David (carpenter) — box lids keep breaking down/rotten wood when struts installed — will review when JE on site - Dock & Floating Jet Ski Dock Carpet - due to leave Tropical 11/31 — David (carpenter) will install 9. Chillax Room — Requires furniture piece for electrical/media equipment - forwarded a selection 9/28, 10/1 & 10/30 —awaiting direction 10. Chillax Bathroom - walls in vanity area to be painted — JE to select color 11. Mechanical Building Transformer — changed out - COMPLETE 12. Boats - Lady G — sell — will remain at Nanny Cay until sold - Big N — repair at AYH dock in progress —hydraulic hoses due Tropical 10/31, boxes to be installed 10/30, painting to be begin 10/29, electrical refurbishment 80% complete. Cylinders to be installed on LSJ — will discuss timing when JE 13. AC - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection —Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's Garden — require deer protection —Electric Fencing due at Tropical 11/31 - Shade cloth — reviewing propagation of seeds which were planted 10/16. Suggest raised planter beds, using tables from nursery - Peter to clean the sides of the road — work in progress - Black Heli Under Pads — install at top of bike path at MC — ETA on LSJ 11/2 - Review growth of sea grape - engineering area — transplanting has not worked — review purchasing small plants EFTA00584498 - Take down the ropes at the end of the month on the trees — COMPLETE 16. Roads - General re-grading of roads — ongoing — Peter - Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 17. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - David (carpenter) — old unit removed awaiting direction from JE - New front & back doors installation — David (carpenter) — COMPLETE 20. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood — David (carpenter) — will begin 10/28 21. LSJ Mooring — Darren spoke with Army Corp 10/17 — still working on environmental report, will forward ASAP 22. Hangar - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equipment Purchased - (3) Terex RL-4000 6kW Light Tower systems — due to arrive at Tropical 10/31 - (1) Skid steer forks — due to arrive at Tropical 10/31 - (1) 2012 John Deere 5101E tractor with 553 loader and 8' blade — delivered to Tropical 10/25 — will sail as soon as space is available - (1) 2003 Genie Z60/34 Boom lift — ETA Tropical 11/9 - (2) 2013 S4-Express electric golf cars — ETA on LSJ 11/2 - (1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — at Tropical. Awaiting bucket from UK, expected ETA STT 11/10 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as time permits 28. Part Time Employees — focus on finding housekeepers — have a potential candidate, working the next week. Employment Company Anna found was unable to provide anyone. Advertising 29. Heli Pad - wind sock for Heli pad on site. New wind sock assembly ordered by Larry awaiting ETA 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 11/1 31. Solar - installation COMPLETE - JE does not like the white light", prefers soft white light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via email 10/22 32. Master Bedroom — door sliders require waxing and alignment — David (carpenter) - COMPLETE EFTA00584499

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.