Skip to main content
Skip to content
Case File
efta-efta00585901DOJ Data Set 9Other

Memorandum

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00585901
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Memorandum To: Jeffrey Epstein From: Emad Hanna Re: Zorro Ranch Project # 5 - Water Well # 1 Date: 06-10-05 I have attached an updated budget and cost analysis for the above project. At this point in time we need approval for the following items: a) Item # 5 — Pluming at $ 59,886.75 for pumps and controllers for connection to existing water distribution system. b) Item # 6 — Electrical at $ 6,300 to connect power to well, pumps and controllers, although this cost increased by $ 1,000 from the original budget. Even with the increased $ 1,000 for item # 6 and the additional testing costs not originally budgeted for this project will still finish below the original budget by about $ 4,500. Sincerely Emad Hanna EFTA00585901

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.