Memorandum
To: Jeffrey Epstein
From: Emad Hanna
Re: Zorro Ranch Project # 5 - Water Well # 1
Date: 06-10-05
I have attached an updated budget and cost analysis for the above project.
At this point in time we need approval for the following items:
a) Item # 5 — Pluming at $ 59,886.75 for pumps and controllers for
connection to existing water distribution system.
b) Item # 6 — Electrical at $ 6,300 to connect power to well, pumps and
controllers, although this cost increased by $ 1,000 from the original
budget.
Even with the increased $ 1,000 for item # 6 and the additional testing costs
not originally budgeted for this project will still finish below the original
budget by about $ 4,500.
Sincerely
Emad Hanna
EFTA00585901
Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01832471
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01810749
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01828504
0p
DOJ Data Set 10OtherUnknown
EFTA01831066
2p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01830186
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01793910
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.