Skip to main content
Skip to content
Case File
efta-efta00585946DOJ Data Set 9Other

DARREN K. INDYKE

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00585946
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
DARREN K. INDYKE DARREN K. INDYKE, PLLC 301 East 66th Street, 10B New York, New York 10065 Telephone: (212) 517-2052 Telecopier: (212) 517-7779 email: June 30, 2011 VIA EMAIL Paul J. Livigni, Project Site Manager Merrick Real Estate Group, Inc. 2005 Merrick Road, Suite #183 Merrick, NY 11566 Re: Construction at 12-14 East 72nd Street. New York NY Dear Mr. Livigni: I represent the owner (the "Owner") of the premises located at 9 East 71st Street, New York, New York (the "Affected Property") and write in regard to the construction activities taking place under your management at 12-14 East 72nd Street, New York, New York (the "Construction Site"). Please be advised that the incessant jack-hammering taking place at the Construction Site continues to generate excessive levels of noise and vibration and other disturbances at the Affected Property. These excessive levels and disturbances threaten to create extensive physical damage to the structure, improvements and personalty at the Affected Property and are substantially interfering with both the Owner's quality of life and the conduct of his business and personal affairs. In order that you may continue with construction activities at the Construction Site in a manner that will limit any resulting damages that the Owner may incur, the Owner is granting you permission to proceed, at your sole cost and expense, with the preconstruction survey and installation of monitoring systems at the Affected Property, as outlined in your June 29, 2011 email to Mr. Richard Barnett, the building manager at the Affected Property. Please coordinate with Mr. Barnett to schedule the survey and installation. Finally, although the Owner has no wish to impede the progress of permitted and lawful construction activities at the Construction Site, I am sure you are aware that you and all other responsible parties shall be held fully liable for any and all damages the Owner incurs as a result of such activities. We sincerely hope that the EFTA00585946 information obtained through the installed monitoring systems will assist you in avoiding any activity that may create such damages. We look forward to a mutually cooperative and respectful relationship as you move forward with construction at the Construction Site. Sincerely, Darren K Indyke 2 EFTA00585947

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone(212) 517-2052
Phone(212) 517-7779

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.