Memorandum
To: Jeffrey Epstein
From: Emad Hanna
Date: 07-18-05
Re: LSJ Project # 27 Landscape Lights
Paul Gandy mentioned the original survey called for a little over 1 mile of
pathway lighting only would be around $ 100,000, which he admitted that he
made a mistake on and it is his fault. He stated in an e-mail dated 7-14 (see
attached copy) that his estimate is about $ 200,000 higher than originally
anticipated.
Upon receiving the new site plan based on the specs given to Miles, which
included the following:
1) Increase the total pathway length to nearly 4 miles
2) Utility conduits and duct banks for future facilities
3) Irrigation water
4) Communication lines
It was determined to have all utilities in a common trench.
Gandy estimates the lighting project only to take about 4 months at a cost of
$ 430,000 and the lighting and duct bank to take about 9 months at a cost of
$ 1,000,000.
Thank you,
Emad
EFTA00586313
Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01832471
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01810749
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01828504
0p
DOJ Data Set 10OtherUnknown
EFTA01831066
2p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01830186
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01793910
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.