Skip to main content
Skip to content
Case File
efta-efta00589587DOJ Data Set 9Other

DS9 Document EFTA00589587

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00589587
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Teach =ACTING SER \RES, INC CONTACT INFORMATION: NAME: Janusz PROPERTY ADDRESS: El BRILLO CITY: PALM BEACH PHONE: EMAIL: SCOPE OF W OPTION 1 PROPOSAL PROPOSAL DATE: 4-8-15 DRIVEWAY OPTIONS 1) Demo ENTIRE driveway of 4' x 4' concrete pads approximately 4,756 sq. ft. driveway both EAST and WEST and haul to dump. 2) Form and you mesh 4" to 6" r approximately 4,756 sq. ft. of 4' x 4' concrete pads with fiber in depth with same layout as existing driveway. 3) After 10 days of curing time we will then install a 1/4" of color of customers choice and texture as desired. 4) All gates and gate tracks will be re-installed and set as before. 5) All 2" joints in between pads will receive a small pebble of choice and have an epoxy mixed with it to help keep pebbles in joints. OPTION 2 1) Demo ENTIRE driveway of all the 4' x 4' concrete pads approximately 4,756 sq. ft. @ both east and west and haul to dump. 2) Supply and sand set install approximately 4,756 sq. ft. of Red brick of choice with coral design inlays as desired. 3) All joints will be sand swept and all edging will receive a hidden concrete edging. EFTA00589587 TERMS: 1) All sub-grade surfaces will be prepped to Palm Beach Code and compacted to specs. 2) All gate tracks will be re-installed back to original after the install 3) The gate sensor may have to be re-connected with the gate after installation, if we can not connect it. 4) All permits will be included in price TOTAL: OPTION 1 Concrete/ rice - $61,047.60 OPTION 2 Brick and coral - $57 325.45 50% deposit is due upon signing and a draw is set upon concrete removal and delivery of brick and final due upon 100% completion Job will take 2 to 3 weeks for permit And another 10 to 12 business days to complete entire job if no unforeseen issues arise. PALM BEACH CONTRACTING SERVICES INC. hereby proposes to furnish materials as shown as. tated above. All work is guaranteed to be completed in a workmanlike manner according to standard practice. Any changes inn,lring extra costs or extension of time will be executed upon written order and will become an extra change order over and above this proposal. Customer acknowledges and agrees that he or she will pay all collection fees, court casts. attorner's fees. and or any other expense ;vaulted to enforce the terms and conditions of this comma ACCEPTANCE OF PROPOSAL, THE ABOVE PRICE, SPECIFICATIONS AND CONDITIONS ARE SATISFACTORY AND ARE HEREBY ACCEPTED, PALM BEACH CONTRACTING SERVICES, INC IS AUTHORIZED TO DO WORK AS OUTLINED ABOVE. I AGREE TO FORWARD DEPOSIT BEFORE START OF PRODUCTION ACCEPTED BY: DATE: 50% DEPOSIT TO COMMENCE WORK, REMAINDING BALANCE DUE UPON COMPLETION EFTA00589588

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.