Skip to main content
Skip to content
Case File
efta-efta00589766DOJ Data Set 9Other

LES FILE DRYWALL, INC.

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00589766
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
LES FILE DRYWALL, INC. 116 INDUSTRIAL NE ALBUQUERQUE, NEW MEXICO 87107 (505) 345-8283 FAX (505) 345-7528 Price Quote To: Zorro Ranch Job: ATTN: Date: 6/13/2012 From: Ramon Sandoval Description of work: 1: Patch and repair all block wall on site $12,594 2: @ Mech Building, Patch and Repair stucco where needed, install control joint @ +- 7-0" also refinish north wall of Mech. Building $9,040 2A: Scaffolding And Claen Up $2,500 3:@ Cottage, Patch and repair stucco where needed, also refinish East wall $10,397 3A: Scaffolding and Clean up $2,550 4: @ Main House Upper level, Patch and repair where needed, refinish East wall $1 1,247 4A: Scaffolding and Clean up $1,529 5: @ Deck, Patch and repair where needed, also repair coulmns $4,200 6: @ Main House Lower Level, Patch and repair where needed $7,530 6A: Scaffolding and claen up $2,550 7: Patch nad repair East Proch dur to roof leak Mural by others $4,500 8: @ Court Yard, patch and repait coulnms and Mis. Items $4,200 NM Gross Recipt Tax-Santa Fe Cointy $5,063 Price: Total Price $77,900 EFTA00589766 The pricing of this change order is good for thirty days. after which a review will be required. We reserve the right to determine and request the cost of impact and/or delay caused by this change until approvals and proceed instructions can be established. My contract modification resulting from this proposal shall contain the following language: The extension of time for procurement of equipment and material is 00 working days. The extension of time because of labor hours added by this change is 00 working days. The General Contractor may also request that this work be preformed on a overtime basis as not to impact original contract work and this request will constitute extra cost beyond this change of work. EFTA00589767

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

FaxFAX (505) 345-7528
Phone(505) 345-7528
Phone(505) 345-8283

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.