Skip to main content
Skip to content
Case File
efta-efta00593417DOJ Data Set 9Other

LSJ Cistern Repair Estimate

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00593417
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
LSJ Cistern Repair Estimate Description of Operation OW Unit Cost! Unit Material Cost Crew Labor Hours Average Crew Rate Labor Cost Subcontractor!E quipment Rental Total Cistern # 1 1 ea S1,080 62 $35 $2,170 $150 $3,400 Cistern # 2 1 ea S900 62 $35 $2.170 $150 $3,220 Cistern # 3 1 ea $480 42 $35 $1,470 $150 $2,100 Cistern # 1 outside wall coating & repair 1 ea $350 24 S35 5840 _S1.190 Allowance for crack repair after cisterns are drained & inspected: # 1 Is leaking and will be repaired with hydraulic cement before coating 1 L g $350 24 $35 $840 $840 Material delivery to Red Hook 1 ton $250 $250 $250 SUBTOTAL $11,000 20% OVERHEAD AND PROFIT 2.200 TOTAL 13,200 (1) Assumes all cisterns are fully d ained by onsite crew (2) Assumes onsite trash disposal (3) Assumes all transportation supplied by LSJ (4) This quote is good for 30 days (5) Upon Notice to Proceed, 100% material & 50% labor deposit required. (6) Balance due upon completion. EFTA00593417

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.