Skip to main content
Skip to content
Case File
efta-efta00593657DOJ Data Set 9Other

St. Thomas, VI 00803

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00593657
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
St. Thomas, VI 00803 Tel: To: WE LLC Attn: Rich Kahn Dear Mr. Kahn, Please see the project cancellation costs below; • Work Performed Date: May 27, 2016 Re: Project Cancellation Costs Project: Asphalt Paving Little Si James Island o o o 45 trucks materials hauling @ $400.00 per 884 tons agg. base loading and spreading 884 tons agg. base structural compaction Subtotal Overhead 15% $18,000.00 2,652.00 4 420.00 $25,072.00 $3,760.80 Total $28,832.80 Mobilization Costs (3 times) o Personnel — 96 man hours @ $45.00 per $4,320.00 o Equipment Transportation — 21 @ $350.00 per 7,350.00 o Specialty Equipment shipping, taxes, clearing 4 120.00 Total $15,790.00 De-mobilization Costs (3 times) o Personnel — 96 man hours @ $45.00 per $4,320.00 o Equipment Transportation — 21 @ $350.00 per 7.350.00 Total $11,670.00 Cancellation Costs 15% $512,500.00 $76,875.00 Total Costs $133,167.80 1 Project Cancellation Costs LSJE LLC EFTA00593657

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.