Global Investment Opportunities Group (GIO)compressor and use the electronic crossover and Audyssy Room
Case File
efta-efta00595567DOJ Data Set 9OtherDS9 Document EFTA00595567
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00595567
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
1
E
C
B
2
EXISTING STOREROOM
AND CISTERN IN THE
BACKGROUND
3
5
O
0
O
0
L
1
1
SOUTH ELEVATION
A2.O I A2.O
NEW PRE-FINISHED METAL
ROOFING SYSTEM WITH
VINYL INSULATION
PRE-FINSHF.O
METAL SIDING
HEAVY DUTY
ROLL UP
DOOR ASSEMBLY
0
SCALE: 1/8"=t.- 0-
T 1
0
1
it
ii
I
0
NEW PRE-FINISHED METAL
ROOFING SYSTEM WITH
VINYL INSULATION
PRE.FINSHED
'METAL SIDING
HEAVY DUTY
ROLL UP
DOOR ASSEMBLY
6
EXISTING STOREROOM
AND CISTERN IN THE
BACKGROUND
2
NORTH ELEVATION
SCALE: 1/8'=t'
n.o I A2.O
E
C
B
REASIOND
NO
DATE
/IMAM
0-17-15 SHEET REVISED
faredian Design Group
NO33 OrOnneVen 0000 - CARKen,a Quarter
Post Moo Boson!,
SI. Thomas. US. Vrgin wanes 001104
lielaphona: 340 TT7 1600 1 • 340 777 1601
o-malt
int Kimi
0.1,4 cannel KM mt
sax /..1•011,
.alt.P. INA (40.• Mid RA I KA
e =mina
wmaxor
ennui isstee
a/ MAW Wel MY ~inns OW rat wore •
CWT.:an:" me La l •
11•SS.
V
t..
mar nonce lit hot m tar am
LITTLE ST. JAMES
MAINTENANCE
AND WORKSHOP
BUILDING PROJECT
PARCEL$ ARC
LITTLE ST *WS u S
5-20-15
CRASTart
K.R.B.
EMCEEDBY:
APPROVED BY.
K.R.B.
..W.
PROJECTS °.
15.001
COKIRACT /104
SKEEN:11
A2.0
BUILDING
ELEVATIONS
EFTA00595567
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
340 777 1601Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.