Skip to main content
Skip to content
Case File
efta-efta00596324DOJ Data Set 9Other

MECHANICAL

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00596324
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
MECHANICAL Scheduled Maintenance Inspections Gulfstream G550 and G500 AIRCRAFT APPLICABLE - Gulfstream G550 - Gulfstream G500 NOTES - Inspections are based on the Aircraft Maintenance Manual Chapter 5-20-00 inspection program. • Estimates do NOT include chapter 5-10-00 (Time Limits) items or completion ICA required inspections. - Discrepancies found during inspections, can vary significantly due to the age of the aircraft, mission requirements, operating environment and past maintenance practices. - Downtime is based on accomplishing that specific task or inspection and does not include correction of discrepancies. - The estimated Budgetary out- the- Door price includes the inspection, estimated interior access and minor discrepancies. It does not include replacement repair or overhaul of any Serialized parts, LRU's, avionics/electrical "black boxes", indicators / gauges, probes, transmitters, sensors, life-limited or time-controlled parts. GULFSTREAM FEATURES & BENEFITS - Factory trained service technicians, engineers and specialists at 11 Gulfstream facilities strategically located around the world provide AOG and warranty support your aircraft. - OEM sign-off of larger inspections helps to maintain the long term value and integrity of the maintenance history of the aircraft. - Extensive back-shop capabilities for the overhaul and major repair of landing gear, APUs, wheels, brakes,thrust reversers, batteries, fuel pumps, avionics and other components. - On-site FAA designated engineering representatives for rapid coordination and approval of repairs or installations. - Experienced technicians and quality assurance personnel utilize radio-graphic X-ray, non-destructive testing (NDT) and handheld test equipment. - Extensive parts inventory for efficient operations and minimal downtime. ESTIMATED INSTALLATION PRICE* & DOWNTIME Inspection: 1A Inspection / 500 Hour Est Price: $19,500 Est Out-the-Door $22,500 Est Downtime: 2.3 Days 2A Inspection / 1000 Hour $23,000 528,500 3.4 Days 4A Inspection / 2000 Hour $4,000 54,500 1 Day 1C Inspection / 12 Month $8,500 $10,000 2 Days 1C Inspection / 12 Month W/ ( i A/500 Hour) $27,500 $32,000 3 -4 Days 2C Inspection / 24 Month $31,000 $37,500 5-7 Days 3C Inspection / 36 Month $9,500 $11,000 2 Days 4C Inspection / 48 Month $53,500 $68,000 7 Days 6C Inspection / 72 Month $41,000 $41,000 5 Days 8C Inspection / 96 Month $110,800 $150,000 15 - 20 Days 144 Month Inspection $57,250 5187,000 8 Days 192 Month Inspection $115,500 $236,500 20-25 Days 5000 LDG Inspection (Includes Exchange Landing Gear - Budgetary) $290,000 $310,000 7 - 10 Days 'Estimated pricing is to be used for planning purposes only. Gulfstreant A GENERAL DYNAMICS COMPANY Rev. 03302015-RS-DH Expires:1/31/2017 The data and informatoon contained heten is propnetay data of Gulfstream Aerospace Ccepotation Nei. Cher this document nor the data contained herein that bezel:educed used or disclosed to others without the express written authonration of Gulfstream Aerospace Ccepotatico EFTA00596324

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone3302015

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.