Skip to main content
Skip to content
Case File
efta-efta00597269DOJ Data Set 9Other

ty.s •

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00597269
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
ty.s • D filTAMICIAIII r OSOMmendildelltl; 1. Through logic the following conditions all apply at SSC Vista Pad Mount Synchour when on generator power When way 21$ closed, way 1 Is open open transition) to prevent energlution of TX-MV1. 1 tree a IL Mae ela nag SO OW • I it L ALI APPROVED'AS NOTED O RIMSED AND RES:JEW VMS NMI Check is Only for Conformation with the Design Concept of the Project and Compliance it niti• with the Information Given In the Contract Docut:nts. Contractor is Responsible for 0imsr ne to be CorArmed and Corrected Job a, for Inforilstla that pertains solely i tt• Fabrication riocess or to Techniques of s I I atiift".••• ruction; and for Coordtrration of the of All Tra r 'RON ISLANDS WATER MD _ _ AUTHORITY" Cef a -a-- t SwertAter, ONE UNE DIAGRAM - la; RIMY S I MN dt aflame Ffinahzed a Wait IMO Si 0. 00 .417 flew Ccfain; CoOte pen 11121/Al 04114£ 0IACIAVA EFTA00597269

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.