Skip to main content
Skip to content
Case File
efta-efta00597769DOJ Data Set 9Other

Generator/Mechanical

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00597769
Pages
6
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Generator/Mechanical & R.O. Buildings Construction Proposa ssvi 0.4 eE cavation ieit ti Builders March 10, 2017 Prepared for: Great St. James & Little St. James Red Hook Quarters, St. Thomas, VI Contact: 1340-201-1044 Prepared by: SSVI-Expert Builders 6501 Red Hook Plaza, Ste 201 St. Thomas VI 00802 (340) 776-4000 Contact: Alex EFTA00597769 1. INTRODUCTION 2. ABOUT SSVI 3. SCOPE OF WORK 4. SCHEDULE 5. PRICING & PAYMENT TERMS 6. GENERAL TERMS & CONDITIONS 7. ASSUMPTIONS SSVI is pleased to submit this construction proposal to LSJ c/o to be performed at the property located at Little St. James,USVI. By the signature of SSVI's authorized representative set forth below, SSVI agrees to be bound by the representations made herein. This construction proposal and the pricing provided herein shall remain valid for a period of 60 days following the date shown on page 1. 1. INTRODUCTION Little St. James desires to have the existing Generator/Mechanical & R.O buildings removed and replaced with new structures and has provided a general specification and has communicated a set of requirements, which are summarized as follows: • Site Excavation & Earthwork • New Storage Building Construction • R.O Building (A) • Generator Building (B) SSVI / Expert is confident that it will present the best value forLittle St James. First, our past performance record to meet schedules and deliver a high-quality product, at a relatively low cost as compared with the competition. Second, our extensive expertise in this area allows us to tackle tough projects on a fixed-price basis, thereby alleviating any concern that the price may increase. Third, the talent level of our team is unparalleled and our project management practices ensure labor efficiencies that drive costs down. Finally, our access to the highest quality materials at highly competitive prices ensures the lowest possible cost of goods. EFTA00597770 2. ABOUT SSVI SSVI is an established and well-respected local contractor that has been serving customers in The Virgin Islands since 2009. SSVI has completed a broad range of construction projects over the years, and many of them have been of comparable scope and magnitude as compared with this construction project. SSVI is supported by an extraordinary team of professionals who are highly skilled in their trade. For this project, the team will be lead by Reynolds Clement. Reynolds Clement has a proven track record of successfully leading projects such as this. 3. SCOPE OF WORK SSVI will perform all construction activities associated withthe new buildings on Little St James. Such work will be carried out in accordance with requirements communicated to SSVI by Little St James in this proposal and the architectural plans provided by the Jaredian Design Group. In addition to the responsibilities of SSVI outlined in such document, SSVI will be responsible for the following: • Site Excavation & Earthwork • New Storage Building Construction • Construction of the R.O Building and the Generator Building • Site Cleanup EFTA00597771 4. SCHEDULE The entire project described in this proposal will be completed in approximately 6 months, weather permitting, following execution of a contract between the parties. 5. PRICING & PAYMENT TERMS The project will be undertaken at a price of $492,865.00 for labor and materials with the exception of the sheds and roll-up doors, which will be purchased by Little St James directly from Buck Steel who will also Day for all shimina costs from factory to job site. Scope Of Work / Labor Price GENERAL REQUIREMENTS $ 64,285 a. General Conditions b. Shipping, Port Fees & Handling of Buck Steel order paid by LSJ SITE EXCAVATION & EARTHWORK apx 4 weeks a. Earth change protection barricades/silt fencing b. Site hand clearing and excavation c. Site and foundation footing pads excavation d. Backfilling and compaction e. Subterranean termite treatment f. Site retaining walls (two areas) g. Extended exterior walkway along R.O building A h. Seeding / restoration of disturbed areas i. Trucking & disposal of spoils $ 63,000 NEW STORAGE BUILDING CONSTRUCTION apx. 9 weeks $ 183,430 a. First floor fittings & foundation walls b. Enkadrain drainage matt & bituminous coating c. New gravel encased 4" - PVC drain pipes d. First floor concrete bottom slab and entry landing e. First floor exterior & interior concrete walls f. First floor concrete column pads and columns g. First floor concrete beams h. Concrete roof slab i. Concrete parapet wall w/ cap flashing j. Single-ply membrane at parapet and roof $ 64,285 $ 2,500 $ 1,500 $ 1,500 $ 3,500 $ 1,200 $ 40,000 $ 8,500 $ 1.800 $ 2,500 $ 23,400 $ 4,500 $ 2,000 $ 18,750 $ 32,000 $ 7,500 $ 15,500 $ 31,000 $ 5,250 $ 2,500 EFTA00597772 NEW STORAGE BUILDING CONSTRUCTION, cont. k. 6" compacted earth fill topping on roof I. Doors package complete m. Electrical complete (fixtures, wiring, installation) n. Mecahnical exhaust fans and louvers complete o. Painting of first floor walls R.O. BUILDING A apx. 9 weeks $ 137,950 a. First floor excavation for pier footings $ 3,500 b. First floor spread footings and foundations $ 9,000 c. First floor concrete columns and piers $ 6,500 d. Second floor perimeter grade beams under new slab $ 8,750 e. Second floor building extended elevated concrete slab $ 28,000 f. Second floor pre-engineered building package complete Purchsed by LSJ g. Second floor pre-engineered building erection complete $ 30,000 h. Second floor roll-up doors package complete $ 15,000 i. Second floor electrical complete (Fixtures, panels and installation) $ 9,000 j. Second floor mechanical (exhaust fans and louvers) $ 26,200 k. Second floor miscellaneous wall painting $ 2,000 $ 7,500 $ 3,500 $ 20,000 $ 8,530 $ 1,500 GENERATOR BUILDING B apx. 5 weeks $ 44,200 a. Second floor pre-engineered building package complete Purchased by LSJ b. Second floor pre-engineered building erection complete $ 12,000 c. Second floor roll-up doors package complete $ 12,500 d. Second floor electrical complete (Fixtures, panels and instalattion) $ 5,000 e. Seconf floor mechanical (exhaust fans and louvers) $ 13,800 f. Second floor miscellaneous wall painting $ 900 TOTAL OF ALL CATEGORIES OF WORK ABOVE CONTINGENCY (15%) GRAND TOTAL $ 492,865 $ 73,930 $ 566,795 Payment 1 at contract signing 50% of stage 1Site Work $ 31,500 Payment 2 at completion of Site Work 40 °A of stage 1 Site Work $ 25,200 50% of stage 2 New Building $ 91,715 Payment 3 at completion of New Building 40 % of stage 2 New Building $ 73,372 50% of stage 3 R.O. Building $ 68,975 Payment 4 at completion of R.O. Building 40 °A of stage 3 R.O. Building $ 55,180 50% of stage 4 Generator Building $ 22,100 Payment 5 at completion of Generator Building 40 °A of stage 4 Generator Building $ 17,680 Payment 6 2 weeks after completion of entire job Balance of contract $107,143 Contingency if/as required and agreed upon by both parties. EFTA00597773 6. GENERAL TERMS & CONDITIONS 1. The above estimate is based upon standard local construction industry standards; 2. Quantities for this estimate are based upon the Owner's approved Final Design Plans; 3. Electrical and Plumbing cost estimates are based upon the standard unit cost of $125.00 per point. A point is defined as each source location where either and electrical or plumbing fixture/device provides its intended service; 4. Quantities of concrete are based upon measured amounts from the Plans; 5. The estimate includes a line item for General Requirements and Conditions which can encompass a variety of expenses which may arise during the period of construction; 6. All work will be done between the hours of 7:00 M. and 5:00 •. 7. ASSUMPTIONS This construction proposal and the pricing and schedule data provided herein assumes the following: 1. All obligations of Little St James described herein will be carried out in a timely manner, including the obligation to make timely payment in accordance with the payment terms and schedule provided herein. 2. Mutually acceptable terms and conditions will be negotiated between Little St James and will supplement the terms and conditions contained herein 3. Little St James will provide prompt feedback/answers on any questions SSVI may have and be reasonably available to SSVI in furtherance of the project 4. SSVI will be provided access to Little St James premises as reasonably required to perform the work during the working hours set forth above EFTA00597774

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone(340) 776-4000
Phone1340-201-1044

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.