Manager's Cottage

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00600167
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Manager's Cottage Revised Conceptual Budget Gary : Date: JEE: Date: $220,190.00 18 July 2011 Group Phase Description gti afti aim Shipping ' Clearance Total, 01 Direct Expenses 01-045 Cut & Patch 80 hrs 25.00 0.00 0.00 2,000.00 01-410 Testing 1 tot 0.00 0.00 0.00 0.00 01-420 Special Inspections 1 tot 0.00 0.00 0.00 0.00 01-512 Temporary Lighting 1 tot 500.00 0.00 0.00 500.00 01-522 Temporary Enclosures/Safety 1 tot 1,000.00 0.00 0.00 1,000.00 01-610 Material Handling 60 hrs 20.00 0.00 0.00 1,200.00 01-624 Construction Cleaning 40 hrs 20.00 0.00 0.00 800.00 01-636 Punch List 24 hrs 25.00 0.00 0.00 600.00 01-645 Expendables 1 tot 3,500.00 0.00 0.001 3,500.00 01-654 Equipment Rental 1 tot 3,000.00 0.00 0.00 3,000.00 01-665 Equipment Operation 40 hrs 25.00 0.00 0.00 1,000.00 01-900 Misc. Expenses 1 tot 1,500.00 0.00 0.00 1,500.00 Division Total 16,100.00 02 Sitework 02-050 Demolition 170 hrs 20.00 0.00 0.00 3,400.00 02-071 Disposal 42 hrs 20.00 0.00 0.00 840.00 02-281 I Pest Control 1 tot 2,000.00 0.00 0.00 2,000.00 Division Total 6,240.00 03 Concrete 03-055 Drill & Dowel 1 tot $1,500.00 $0.001 $0.00 $1,500.00 03-130 4000# Concrete 10 cyd $165.00 $0.001 $0.00 $1,650.00 03-170 Misc. Concrete 1 tot $2,500.00 $0.00 $0.00 $2,500.00 03-210 Rebar 500 lbs $3.50 $0.00 $0.00 $1,750.00 Division Total $7,400.00 EFTA00600167 06 Wood 06-050 Fasteners 1 tot $3,000.00 $0.00 $0.00 $3,000.00 06-100 Rou h Ca nt 1 tot $30,000.00 $2,500.001 $0.00 $32,500.00 06-200 06-400 Finish Carpentry Architectural Millwork 1 1 tot tot $15,000.00 $0.00 $0.00 $0.00 $0.00 $15,000.00 $0.00 Division Total $50,500.00 07 Moisture / Thermal 07-100 Waterproofing 1 tot $3,500.00 $0.00 $0.00 $3,500.00 07-623 Copper Flashings 200 Ift $40.00 $500.00 $0.00 $8,500.00, $1,200.00 07-900 Sealants 1 tot $1,200.00 $0.00 $0.00 Division Total $13,200.00 08 Doors / Windows 08-210 Exterior Wood Doors & Frames 2 ea $450.00 $0.00 $0.00 $900.00 08-211 Interior Wood Doors & Frames 6 tot $300.00 $0.00 $0.00 $1,800.00 08-500 Metal Windows 6 ea $900.00 $450.00 $0.00 $5,850.00, $2,400.00 08-710 Finish Hardware 8 ea $300.00 $0.00 $0.00 08-810 Mirror Glass 1 allow $300.00 $0.00 $0.00 $300.00 Division Total $11,250.00 09 Finishes 09-200 Plaster 3000 sft $6.00 $1,000.00 $0.00 $19,000.00 09-300 Tile Flooring 700 sft $10.00 $2,000.00 $0.00 $9,000.00 09-920 Interior Paintin. 1 tot $3,000.00 $0.00 $0.00 $3,000.00 Division Total $31,000.00 10 Specialties 10-700 Hurricane Shutters 1 tot $21,000.00 $0.00 $0.00 $21,000.00 10-800 Toilet & Bath Accy's 1 tot $2,500.00 $0.00 $0.00 $2,500.00 Division Total $23,500.00 EFTA00600168 11 Specialties 11-451 Kitchen Equipment 1 tot $4,000.00 $0.00 $0.00 $4,000.00 Division Total ;4,000.00 12 Furnishings 12-300 Cabinets 1 tot $4,000.00 $0.00 $0.00 $4,000.00 12-310 Countertops 1 tot $1,000.00 $0.001 $0.00 $1,000.00 Division Total $5,000.00 15 Mechanical 15-400 Plumbing 1 sub $15,000.00 $0.001 $0.001 $15,000.00 15-450 Fixture Allowance 1 allow $5,000.00 $0.00 $0.00 $5,000.00 15-600 NC Systems 1 sub $15,000.00 $0.00 $0.00 $15,000.00 Division Total $35,000.00 16 Electrical 16-000 Electrical Complete 1 sub $13,000.00 $0.00 $0.00 $13,000.00 16-510 Fixture Allowance 1 allow $5,000.00 $0.00 $0.00 $5,000.00 Division Total $18,000.00 Total I $220,190.00 EFTA00600169

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.