Purchase Order
925 W. Kenyon Ave, Suite 6, Englewood, Colorado 80110
Tel:
IRO
Page 1 of 5
5-Jan-16
Quote Number:
z60105
Job Number:
z60105
This purchase Is subject to the terms and conditions as set forth in the Limited Warranty and Purchase Order.
Customer Name:
KZW SERVICES
Ship to:
Garage / Maintenance Bldg
Contact:
RON CAREY
Contact:
Address:
. BOX 1082 APT 204 GOLDEN ROCK Address:
City / State / Zip
CHRISTIANSTED,VIRGIN iSt 821
City / State / Zip:
Little St James, U.S.V.I.
0
Tel
,
Tel.:
Fax:
Width (ft.)
80'-0"
Length (ft.)
801-0"
Height (ft )
Front SW
18'4"
Peak Offset
Roof Pitch
Back SW
45.-0"
1.0:12
18c0"
Girt Tpo
.
Left EW _ Right EW . Front—SW
..
Rush
•
Flush
• Bypass
Deflection Criteria
Additional Loads
bad( SW
Bypass
Frame Horizontal
60
._
Frame Verticalii
180
Purtin (Live)
180
Snow Buildup
Height Difference (ft) __
Mezzanine (Dead)
NO
N/A
N/A
•
N/A
N/A
N/A
Bracing Type
Left EW
Cible Diagonal Bracing
_____
-
Purlin (Wind)
120
Mazzanina(Lya)
__._
Crane Type
Right EliV7 Catili Diagonal Bracing
Front SW
Cable Diagonal Bracing
..
Girt (Wind)
90
Roof Panel Live). _____
180
Wall Panel
90
Crane Capacity (kips)
Other
.
Back SW
Cable Diagonal Bracing
Column Base Elevations
Primary Framing
Left EW
0
Right EW
0
Front SW
0
Back SW
0
interior Col.
0.0000
Primer Color
Left EW
Right EW
Frame Column
Frame Rafter
Rigid Frames
RED frames, RED secondary
Post and Beam . _
_
_
.
.—
_
29.0000
Column Spacing
Post and Beam
tapered depth
tapered depth
Left EW
14.0000
14.0000
12.0000
12.000
Right EW_ 16.7600
11.2500
.0.11001)
12.000
Front SW 4 at 20
i
3 rigid frames
with interior columns at:
Exterior Panels
Gauge
Profile
Finish
Fasteners
SS Clip
Roof Sheeting . Wall Sheeting
26
26
PBR
PBR
Galvalume
Signature 200
Long-Life ,
Standard
0
Trim Colors
Insulation
Gutters and Downspouts
Eave/Gable Signature 200
Roof
Not Included • By Others
Gutters
Color
Downspouts
Front SW
Back SW
80
80
Sianataie 200
... .
•-• •
3
3
Signature 200
Base
:
200
Left EW
Not Included - By Others
_ _Signature
_
Corner
Signature 200
Righ EW
Fron SW
Back SW
Not Included - By Others
Openings
Signature 200
Not included - By Others
Other
WA
Not Included - By Others
Color
De ' n Loads and Code Information
Ground (')
0.00
Live_. ._
20.00
Reduced?
YES.
Wind mph_
175
Wind Exp.
C
Wiry:limp.
i
Code
113C 12
Collateral
0.50
Roof Snow
0.00
Sett. Cortik
0.44
Sles. Zone
D
pais. Imp_
f
State Code
TOCT4
Interior Liner Locations
Roof
Ga ge
Profile
n/a
0
Finish
Location
none
LEW
nla
0
none
REW
n/a
0
none
FSW
n/a
0
none
SSW
n/a
0
none
EFTA00602321
Braemar Building Systems Purchase Order
Job No.:
5-Jan-16
z60105
Quote No.:
Page 2 of 5
z60105
Factory Located Framed Openings
Open Wall Areas
Left EW
(2)12
Wx 16
H
16 ft high and 28 ft long
"
"
" common wall with Add-A-Bay
Right EW
(2)12
Wx 16
H
none
Front SW
none
none
Back SW
none
none
Special Notes and Qualifications
3
Sets of engineered stamped anchor bolt plan and approval drawings
3
Sets of erection drawings
Is calculation required? _X _Yes .
Base condition: Base angle with trim & closures.
9
Louver framed openings with j- trim, field located.
Sery 32.6667' W x 47.5' L x 14.1' H - PBR roof & wall sheeting,trtms, gutts/ downs,fasteners,closures,ridge caps
" - zee with closures and trim for stem walls, transition trim mastic & sealant, included.
Add Bat 32.6667' W x 25' L x 14.1' H - Same conf. as Garage / Maint. Complete building shell between other sections.
Note
All sections approx. weight for dunnage to barge by others = 42,639 pounds, 2 flat racks trailers.
Due to volatility in the North American steel market, this price is valid for 15 days.
NOTE EXCLUSIONS ON PAGE 3!
Color Selection:
Ultra-Dek, Double-Lok, and PBR panels are available in Signature 200 colors only. Additional charges
will apply if Signature 300, Kynar, or other colors are selected.
-
color selections are subject to availability and lead-time.
EFTA00602322
WARRANTY, TERMS AND CONDITIONS OF SALE
Page 4 of 5
SJan-113
Job No.:
z60105
Quote No.:
z60105
I.
LIMITED WARRANTY BRAEMAR BUILDING SYSTEMS INC. (hereinafter refined to as the Manufacturer) makes the following Limited
Express Warranty to the Buyer if the materials are constructed or installed in compliance with the Manufacturer's erection drawings and manual and in n good
workmanlike manner. That Limited Express Warranty shall be invalidated by any procedural or other changes in construction, installation. anothficauon or
engineering additions not approved by the Manufacturer. by improper site selection. site preparation errors or failure to comply with Manufacurees
instructions or warnings regarding payment. delivery. storage or handling. The Limited Express Waranty applies only to products manufactured by this
Manufeetwer. THIS LIMITED EXPRESS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED. AND THERE
ARE NO WARRANTIES, REPRESENTATIONS OR CONDITIONS, OF ANY KIND, EXPRESSED OR IMPLIED, INCLUDING WARRANTY OF
MERCHANTABILITY OR OF FITNESS FOR ANY PARTICULAR PURPOSE BEYOND THE WARRANTY STATED HEREIN. IN NO EVENT
SHALL. MANUFACTURER BE LIABILE FOR LOSS OF PROFITS OR OTHER INCIDENTAL CONSEQUENTIAL OR SPECIAL DAMAGES.
MANUFACTURER HAS NOT AUTHORIZED AND SHALL NOT AUTHORIZE ANY PERSON OR COMPANY TO ASSUME, ON BEHALF OF
THE MANUFACTURER, ANY LIABILITY IN CONNECTION WITH THE MATERIAL SUPPLIED, NOR TO INCREASE TILE SCOPE OF
THIS LIMITED EXPRESS WARRANTY. The Limited Express Waeranty is limited to the followtog:
A.
The materials. when properly constructed or installed shall meet the Manufacturer's specifications
B.
All Manufacturers materials are free of material defects in workmanship or materials. and shall be warranted as such for a period of twelve (12) months
from the date ef delivery by. or pickup Siam the Manufacturer.
C.
Quality of materials shall conferee to the gnu memoir and specifications of the Manufacturer as stated hater The Manufacturer will replace ray
defective material furnished within twelve (12) months upon presentation by Buyer of evidence satisfactory to Manufacturer of such defect The shop
painting is a prime coat and the Manufacturer shall not be responsible for the condition of die paint after it has been delivered to the common carrier• job site or
owner. Manufacturer's sole responsibility under this Limited Express Warranty shall be to replace the defective material.
Warranty claims must be submitted in writing to the Manufacturer at the Manufacturer's address stated harem Satisfactory evidence of such defect shall
include accurate photos and any inspection or expert reports. Manufacturer shall have a period of *him (301days after receipt of such Satisfactory Evidence to
reasonably determine if a defect exists to which this Iterated Express Warranty applies. Manufacturer shall have the right, bra not the duty, to conduct such
inspections of the materials in place, aid Buyer or Contractor agree to provide reasonable access to same. In the event Manufacturer has not notified Buyer of
its acceptance of respenentlity for the claim within the herein referenced thirty (30)days. it shall be presumed that the claim of warranty is denied.
2.
TERMS AND CONDITIONS
A.
Unless specifically noted. the Manufacturer has excluded all matter. except damn. fabrication an delivery of the materials which exclusion Mclean. but
is not limited to. the following; erection, insulation, foundatico denim. concrete, imbeds. overhead doors, windows. unleadthg. storage, field painting, tax.
B.
Approval Drawings prepared by the Manufacturer and duly approved by the representative of the Buyer shall be deemed the correct interpretation of the
contract and work to be performed.
C.
The place of fabricanon, the routing and the method of shipment, the place of price of purchase, or all or any part of the materials to be included
hereunder shall be at the sole discretion of the M anu Enterer.
D.
The Marnefinnurer shall not be liable nor held liable fir delays m the perfonnance in whole or in put of this Agreement resulting in whole or In pert hone
any cause beyond the control of the Manufacturer• including tut not limited to acre defined as Force Majeure. Acts of God, fee, earthquake. flood. windstorm.
or strikes. lockouts, or other differences with employees: or war. riot. or tannin activity: or embargoes. delays. lesson or damages m transportation; or
tthortage of cars. trucks. heel, labor. or the material In case of the happening of any such cause of delay, the time of completion shall be extended accordingly.
E.
The Manufacturer shall not be responsible for any field work et any kind under any circumstances performed on any material furnished under this
Agreement without prior authorization in writing from the Manufacturer.
F.
Owner or Buyer is responsible fee ordering and erecting a structure that when complete. complies with provincial, state and kcal building codes and
zoning, and which will he sufficient to withstand local environmental conditions. Manufacturer makes no representations as to the adequacy of the loads
ordered.
G.
Deposit received by Manufacturer is offered as security for good faith perfonnance of contractual obligations and for expenses. In the event of any
breech of dirt *Veteran' by Buyer
1.
Buya shall forfeit the full amass of the deposit to be applied to the manufacturer's lost profits and expenses Manufacturer may demand. and Buyer
agrees to pay an addmonal amount of up to )3.3%of the total contract balance for standard buildings, or up to 50% on custom designed structures. as
liquidated damages, plus storage. special material cost. lost profits. any and all attomey and collection Res. Buyer acknowledges that it is difficult to
determine the full extent of damages that may be encurred by Manufacturer resulting from Buyer's breach of this Agreement and the liquidated damages
provided far herein are a reasonable approximation and Buyer agrees to sane.
2.
In addition to liquidated damages. Manufacturer reserves the right to pursue any other remedies available to it in law or in equity.
EFTA00602323
WARRANTY, TERMS AND CONDITIONS OF SALE
Page 5 of 5
E-Janilft
Job No.:
z60105
Quote No:
z60105
H.
Buyer agrees that failure to accept delivery or pick-up when scheduled shall constitute breach of this Agreement and shall pay a reenact, 325000
charge. plus freight and monthly storage charges equal to 3% of the contract price. accruing until the material is resold or the Buyer accepts delivery.
I.
The TERMS OF PAYMENT, unless otherwise need shall be as follows:
la) 20% at time of contact acceptance or SIS00.00, whichever is Meer
(b) Balance ofcontract paid with certified haidS. including ell appbcable Saks Taxes• nt time of delivery.
.1.
Under no circumstances is any retention allowed.
K.
Shipments and delivery shall be subject to approval of Manufacturer's credit deptinMenti and Manufacturer reserves the right previous to making any
shipment to require from Buyer satisfactory security for performance of Buyer's obligations. If Buyer fails to fulfill the terms of the payment. Manufacturer
may defer additional shipments or at Menthe:tuner's option caret the uncompleted balance. All deferral shipments shall bear interest fern the time they are
due until paid at the rate of I 8% per annum_ No failure of the Manufacturer to exercise any right occurring from default of the Buyer shall impair the
Manufacturer's rights in case of any subsequent default
L.
'This proposal is not a binding bilateral contract until signed by Buyer and accepted by the Manufacturer, and when accepted. it together with the general
conditions of connate constitute the entire contract between Buyer and Manufacturer. This Agreement sum, rel-s all prior agreements. understandings,
conditions or inducements whether in writing or oral. and die Manuecturer is not bound by any other agreements. understandings. continuant or inducement,
otherwise than are expressly set forth and stipulated herein. No change. thermion, amendment. modification or waiver of any of the terms or provisions hereof
shall be valid unless the same be in %retinae and signed by the Manufacturer.
M. In the event any date called for heroin falls on a Saturday. Sunday. or federal or state holiday. said date shall be extended to the next business day
following such Saturday. Sunday. or federal or state holiday.
N.
the parties hereto expressly agree that the tams and conditions hereof and the subsequent perfonnanee hereunder Call be conamsed and connoted by
the laws of the state of Colorado. Claims. disputes or other caters m question between the parties arising out of or relating to this Agreement « breach
thereof, shall, m the sole and absolute discretion of the Manufacturer• be subject to and deeded by tub:maim. Such arbitration shall be conducted in
accordance with the Construction Industry Mediation or Arbitration Rules of the American Arbitration Association. currently in effect. Manufacturer shall
have the right to select any mooned arbitration services company. Such arbitration shall be conducted in the Denver, Colorado Metropolitan Area as
determined by the arbitration provider. Nothing herein shall preclude Maenifactarer tom electing to pursue legal remedies through a court ofcompetent
jurisdiction which the parties agree shall be limited to the federal or state district coons in the thee of Colorado. A demand for arbitration shall be made by tlw
Manufacturer within a reasonable tune after the claim. dispute or other matter in question has ansen. Any award rendered by the arbitrator or arbitrators shall
be final. and judgment may he entered upon it in accordance with applicable larceny court having jurisdiction thereof
O.
To the fullest extent pertained by law. Buyer shall indemnify and held harmless the Manufacturer. Manufacturer's consultants. employees. officers.
directors and shareholders from and spinal claims. damages. tomes. and expenses, indudirg but not limited to, attorneys' fees. SJ ismg out of or resulting from
Buyer's constriction or installation of the materials provided by ManuresBret
P.
Nothing herein shall be construed to bind Manufacturer to any construction or other cootraft batmen the Buyer and the owner of the property upon
which the materials an Installed or concerted.
Q.
In the event the fabrication of the subject building cannot proceed within forty-five Hal days from the date of rworpeantre of the Manufacturer's building
order, the building will be subject to repricmg to include increased material or Libor costs. if applicable. which the Buyer agrees to pay.
It
Mendicant, reserves the right to change or codify the design and construction of Manufacturer's standard buildings from time to tune and to substitute
material equal to or superior to that originally specified.
S.
Any claims for shortages by Buyer must be made to Manufacturer within Inv (5) days after delivery, or such claims will be considered to have been
waived by dw Buyer act &tailored
T.
Buyer represents and warrants that tlw matenals to be provided by Manufetuter am commercial goods and are not being punhased by Buyer parnenly
for personal. faintly or household purposes.
The undersigned has read the above Warman. Terms and Conditions of Sale sod accepts them as part of this Agreement
BUYER
PLEASE SIGN BELOW
Ma RPM Moen
GATE
BRAEMAR BUILDING SYSTEMS INC.
ACTING AT ITS HOME OFFICE IN DENVER.
COLORADO. HEREBY ACCEPTS THE PURCHASER'S
FOREGOING OFFER TO PURCHASE
Sinented
—
(R
—'I
Mit
EFTA00602324
EFTA00602325
StXt P.M& ICU TALE
Or
rq
QV ea
r
tw
al
Mr
4
4
0 MS
a'
21W
4
I
0
Ans
111'
a
4
0
0
a25
W
21W
TM
III
Mt
if
V
Ha
W
YAW
W
NOR
Olt
el
TO
al
tfire
4
kW
lif
IMP
X 7 RAWOR.CatliONSCIESWESSMREDI
1110MVX00 0,44
A.
010
Sn
MMUS
0.11W
0 Warty.
l'AMOOJTWOBEI.
Mt FRAME ELEVATION: FRAME UNE 2 3 4
Main
ft W
Ut
U
al
ISSUED FOR asPPROv.V.
V 916
B
NCO
FM
BRAEMAR -^"1""3,00
was.01041110Mitilte
Building Syl in
COMA%
law SERVE SS
man
COMM MSSIIPCO RMO
Lira.
tags St Janes US.V.I.
04.M
Gastear
p
I""
Et
isms
soles
EFTA00602326
v,
EFTA00602327
EFTA00602328
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
GPS
14.0000
14.0000GPS
16.7600
11.2500Wire Ref
referencedForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.