a
BETTEROADS
ASPHALT CORP.
Construction Proposal
Betteroads Asphalt Corp.
March 13, 2015
Little St. James Island Asphalt Pathways Paving
Little St. James Island
St. Thomas, VI
Betteroads As halt Corp.
link St. James Island Asphalt Pathways Paring
Starch 13. 20Th
1 of 4
EFTA00608338
A
11141111ROADS
•SPHALT co...
Proposal
March 13, 2015
Between the Owner:
LSJ
Little St. James Island
St. Thomas, VI
And the Contractor:
Betteroads Asphalt Corp.
For the Project:
Little St. James Island Asphalt Pathways Paving
Little St. James Island
St. Thomas, VI
SCOPE OF WORK:
•
Prepare and level existing sub base
•
Eradicate and remove weeds and organic material from existing sub base.
•
Compact sub base to insure stability
•
Apply Tack Coat prior to asphalt concrete placement
•
Place new 2 inch asphalt concrete overlay
SPECIAL CONDITIONS:
•
LSJ will and remove, secure, and replace all stone and other border edges.
•
LSJ will provide all ferry services and vehicular and equipment barging services to and from
Little St. James Island.
•
Care will be taken by Betteroads Asphalt Corp. throughout this project to minimally impact
all existing areas on Little St. James Island that is not a part of this project. However, it is
understood that some damage will occur to existing landscaped areas and Betteroads Asphalt
Corp. will not be responsible for replacement of these damaged areas while implementing
normal construction procedures.
PROJECT DIMENSIONS:
Asphalt Pathways
13000.00 S.Y.
TOTAL BASE PRICE:
$512,500.00
Link* Si. James Island Asphalt Paihways Paving
March 13. 2015
2 of 4
EFTA00608339
A
IISTTIMOACIS
ASMALT COOP.
Project Totals:
Name
Basic Site Materials & Methods
Asphalt Concrete Paving
Quantity
Unit Cost
Unit
Ton
Gal.
Total Coat
Plant mixed bituminous concrete
15(X)
5287.00
5430.500.00
Tack Coat
1950
516.00
531.20000
Asphalt Concrete Paving Subtotal:
5461.700.00
Basic Site Materials & Methods Subtotal:
5461.700.00
Earthwork
Grading
Fine grade for slab on grade
$37.000.00
LS
537.000.(()
Grading Suhtotal:
537.000.00
Earthwork Subtotal:
537.000.110
Company Overhead & Margin
Company Overhead
Overhead Costs
St :.X(11)
LS
513.800.00
Company Overhead Subtotal:
Company Overhead & Margin Subtotal:
513.800.00
513.800.00
Grand Total
$512,500.00
Little St. James Island Asphalt Pathways Paving
March 13. 2015
3of 4
EFTA00608340
A
SETTOROS
ASNIN.T CORP.
OPTIONS (NOT INCLUDED IN BASE PRICE):
•
Additional Asphalt Concrete Paving will be done at a cost of $300.00 per ton when the quantity
of asphalt concrete delivery and placement has exceeded 1,500 tons.
•
A Change Order is any change to the original plans and/or specifications. All change orders need
to be agreed upon in writing, including cost, additional time considerations, approximate dates
when the work will begin and be completed, a legal description of the location where the work
will be done and signed by both parties. 50% of the cost of each change order will be paid prior
to the change, with the final 50% paid upon completion of the change order. Additional time
needed to complete change orders shall be taken into consideration in the project completion date.
Acceptance of Agreement
Witness our hand and seal on this
day of
20 .
Signed in the presence of:
Witness
Witness
Eason Jeffers, USVI General Manager, BAC
Owner Signature
Little St. James Island Asphalt Pathways Paving
March 13. 2015
4 of 4
EFTA00608341
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.