Skip to main content
Skip to content
Case File
efta-efta00608342DOJ Data Set 9Other

Construction Proposal

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00608342
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Construction Proposal August 7, 2O15 By the Contractor: Betteroads Asphalt Corporation For the Project: LSJ_Added Aggregate Base Little St. James Island VI SCOPE OF WORK: Place and compact 3 inches aggregates base as per plan TOTAL BASE PRICE: Project Totals: $90,712.00 Name Aggregate Quantity Unit Cost Unit Total Cost Crushed stone Aggregate Base 1360 530.00 Ton 540.800.00 Materials Transport Trucking and Hauling 68 $400.00 Each $27.200.00 Excavation and Fill Loading and/or Spreading Base Structural Compaction 1360 $3.00 $5.00 Ton Ton 54.080AX) S6.800.00 1360 Company Overhead Company Overhead Percentage 15.00% I $0.00 Percent of Costs SI 1.832.00 Grand Total $90,712.00 Page 1 of 2 L.1.1 Added Aggregate Proposal EFTA00608342

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.