Skip to main content
Skip to content
Case File
efta-efta00616397DOJ Data Set 9Other

Subbase Drydock

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00616397
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Subbase Drydock Parcel #162, Subbase S 0803 T F Name / Address Steve Rampino/Sun Bowt Ocean Services Estimate Date Estimate # 6/13/2007 118 fr MottlAitt ,6 0 Terms Project Proposal Bertha Landing C... Description Qty Cost Total Drydock Haul Out: 70' (reserved for Thursday, July 5th 2007 through Wednesitduly 11th, 2007.) ti ta5 TALI° Laydays 4 1144 apt 1,O" .-tutY g Pressure wash bottom, scrape and sand off marine growth, apply two coats of primer over entire bottom, paint two coats of bottom paint with a third coat at the water line. LABOR: Materials: includes epoxy 235 primer, bottom paint, and all miscellaneous materials.** **Does not include tines. **Steve, usually we require a $500 deposit to reserve your drydock date, but because you are valued customer, we are waiving the deposit. 1-lowever, if for any reason you decide to cancel your drydock haul out, please contact me as soon as possible. Thank you! 70 4 1 1 21.00 250.00 5,300.00 4,100.00 1,470.00 1,000.00 5,300.00 4,100.00 Total $11,870.00 Signature EFTA00616397

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.