Skip to main content
Skip to content
Case File
efta-efta00616408DOJ Data Set 9Other

BERTHA

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00616408
Pages
5
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
BERTHA Repair Budget August 27, 2007 SHIPYARD gti Unit Per Unit Labor Per Unit Perut Sub Total Haul / Launch Bertha 74 Ift $15.00 $1,110.00 Hauled 8/10/07 Blocking 74 Ift $3.00 $222.00 Transient Dock Fees 1 Day $124.12 $124.12 Lay Days 63 Days $122.10 $7,692.30 $9,148.42 MUST DO Marine Survey 1 Tot $1,200.00 $1,200.00 Cometed 8/24/07 Hydraulic Installation 1 Tot $52,000.00 $52,000.00 $53,200.00 NECESSARY OUT-OF-WATER - EPAIRS Stuffing box replacement 2 Ea $445.00 $890.00 Applied 10 hrs $55.00 $550.00 Applied Replace propellers 2 Ea $3,121.00 $6,242.00 Applied 3 hrs $55.00 $165.00 Applied Clean the fuel system 1 Tot $500.00 $500.00 BH 12 hrs $37.50 $450.00 BH Repair fuel leaks 1 Tot $1,200.00 $1,200.00 BH 12 hrs $37.50 $450.00 BH Rework bilge pumping system 1 Tot $150.00 $150.00 BH 8 hrs $37.50 $300.00 BH Repair/replace drum steering switch 1 Tot $400.00 $400.00 BH 3 hrs $37.50 $112.50 BH Repair radar mount 1 Tot $800.00 $800.00 BH $12,209.50 SHOULD DO Purchase and install fenders 8 ea $800.00 $6,400.00 3 hrs $37.50 $112.50 BH Purchase and install 1-1/4" dock lines 1 Tot $1,590.00 $1,590.00 2 hrs $37.50 $75.00 BH Repair oil leaks 1 Tot $500.00 $500.00 40 hrs $37.50 $1,500.00 BH Repair exhaust leaks 1 Tot $1,200.00 $1,200.00 Page 1 of 2 EFTA00616408 BERTHA Repair Budget August 27, 2007 32 hrs $37.50 $1,200.00 BH Augment battery banks 4 Tot $310.00 $1,240.00 8 hrs $37.50 $300.00 BH $14,117.50 WISH LIST Clean and paint 8 gals $95.00 $760.00 36 hrs $37.50 $1,350.00 BH Rework / enclose bridge 1 Tot $0.00 more info to follow hrs $37.50 $0.00 BH Install engine start/stop controls 1 Tot $325.00 $325.00 8 hrs $37.50 $300.00 BH Tune engines 1 Tot $125.00 $125.00 8 hrs $37.50 $300.00 BH Install permanent windows and hatches 1 Tot $0.00 more info to follow hrs $37.50 $0.00 BH Rework engine compartment lighting 1 Tot $1,054.00 $1,054.00 8 hrs $37.50 $300.00 BH $4,514.00 Total $93,189.42 ov(--/eA ti-u-c VG Page 2 of 2 EFTA00616409 U8/07/2007 14:22 FAX 141002 NOLOCICS Oft A. •'WY •1 KM. S' ..Z, lototou. P.R. VO7 Fax it WLUAM BAILEY HAGUE IV From: Fax: Patine: 1 4- cover sheet Phonon Date: 9/7107 Re: VVIRE TRANSFER INFORMATION CC: K wean K Fee Review O Please Comment E3 Please Reply K Please Recycle Applied Marine Technologies, Inc. Banco Popular de Puerto Rico d 9HIN31 1H3802:I d00t0 LO LO deS EFTA00616410 0 0/1.04/.0000.0 0, IP %Uri e% . , 00 LW' I V. 111,0 FIVII nvocnl Lcivartc r Or -000-z / z0 tr N CLOG IES PTO. DEL. REY MARINA. invY a3 KM 51.4, l'AjARDO. P.R. 00131 Name! Address Latin'etre Contractors L Ammicart Yacht Harbor 6100 Red Hook Quarter. Slide Al-? St. Thomas. VI 00802 Project BERTHA LeM 73' Description OW Cost Total Paris and Materials take oft (2) 30-35 Ton custom fabricated yoke type Itythaulic cylinders. 1 3.800.00 7.600.00 Cosl tbr cushions not available at this time. (2) pilot operated ck valves lo lock gale in petition. _ 500.00 1.000.00 12-24 vac( le normally closed solenoid valve for flatting action 1 350.00 350.00 1" blithe uk valve I 85.00 85.00 (30(r) 3/4' Hyd hose 30' parker or equivalent 300 9.00 2.700.00 (40) 3/4" ewe £Wings 10 22.00 880.00 (3.14'T 10 20.00 200.00 I" ints:V4 Bare .1 18.85 75.40 314 flare) 314 Jic I1.0 211.00 20000 New aunt plate (Sr reattbning and stiffening or horns) 1" and 1 1!2" 5086 marine park Weld ware and consrunables arise. e‘5386 6.000.00 6.000.00 Work performed 30000.00 30.000.00 Phis sales lax Saks Tax (PR) 7.00% 0.00 Thank you for your business. Total 849.090.40 Estimate Date Estimate # 8/21/2007 10002 This estimate is based on our 111.5patti011 and belief. It does not include additional materials. ports. or labor which may be required atter the wodc hs been opened up. Often defects are discoved which were Oct evidnil on initial TERMS AND CONDMONS AU work performed is payable as follows: 50#e with acceptance ore:Um' 25% upon pequesi while woik is in process 25% upon compktion All wank perlbtuted is laRyoble upon completion mid before mimicking the vessel Estimated deadline Sr ocamplei ion. of work may vary 'lac to weather mid/or availability of pails and ntaimials. Petfounance of Walleulty work requires pnyineld of harden! fees =Hay days by vessel owner. YOU ARE AUTHORIZED TO PROCEED AS ABOVE...Signed Owner/Cushadian Phone; MM. •T Ch1n1 I rin7 /11 ft: EFTA00616411 Purchase Order LAFA Y ETTE CONTRACTORS LLC 6!110 Red Hook Quarter, Suite A2-7 St. V1008112 Telephoner Pia! Vendor: Applied Marine Technologies purctiase Order NO:: ii-yeat4 Job '' '.; • ... - . Fax No.: Order Date: September 7, 2007 Tel No.: Contract Number: GOOS Vendor No.: 0005 Project Number. Customer No.: Project Name: Little St. James Island Improvements Vendor Address: PTO Dcl Rey Marina Hwy 03 KM 514 Fajardo, P.R. 00738 Billing Address: LAFAYEtTE CONTRACTORS 11..0 6100 Red Hook Quarter, Suite A2-7 St. Thomas, VI 00802 Shipping Instructions: N/A. Work must be completed by: October 15, 2007 Plans & Specifications by: N/A Terms: 50% with acceptance of this order, 25% upon certification by owner's representative that 75% of the work has been completed and the balance upon acceptance of the work in the yard by the owner's representative. Submittals due by: N/A Neassauemitit worsuuket to the teams and sooditions homin..Ship.no goods without an itemized peakiasahp."‘141/4h.la. d_udes: :I..: . • purcbase order number; project numher. sod Vendor's name.PutekasectlernuMber and project number roust appear.oaturipvelem./...' .IMPORTANT: The Tends and.Cooditioni on the TeVcrIG side arelurohif..incqm.‘rated Imatttilorder and me.vendoi capFemf. •:: : . : : • Qty Unit Cost Code Description Unit Price Total I All labor, equipment and materials required to perform the full scope of work described in Estimate 0 102 a copy of which is attached for the purpoms of identifying the scope and price of said work, all such work to bo provided and completed at dry dock located in PTO Dcl Rey Marina, Fajardo, P.R. under the supervision of the Purchaser's representative William Hague N/A $49,090 40 Yeelder. Applied Marine Technologies By: Robert Lemire Ramirez President Lafayette ILOTemotatei/Worefillertera/ Farm 100 fl7 7aNnn... ,n, ----- YV.4 66 :0'[ 2.60 2 / /R EFTA00616412

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

SWIFT/BICINFORMATION
Wire RefTRANSFER INFORMATION

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.