TURKISH HAMMAM & RESIDENCE DESIGN & BUILD OFFER - GREAT ST JAMES ISLAND
APPROX TOTAL AREA:
850 3OIT enclosed area 386 'OM exterior decking area
ITEM NO
RM.
DESCRIPTION
WY
UNIT
UNIT PRICE
IAED1
AMOUNT (AED)
AMOUNT (USD)
P
PRELIMINARIES Design Procedures (Includes Design & concept. Consrucilon &
waking trawigs)
1
Item 1,39).830.00 1,390,800.00 331,041.10
Supply of required approvals from aulhally ( Muncipality/ avi
Defence and Local management -by client& Mimi party local consultant S. contractor/fees by client
Item
-
-
Supply of waste management and cleaningPROVISIONAL
1
Item 1,647.00303 I,EA7,0300) 4.51.232_88 Management & site supeNrson wand
1
1
Item
1Mm
2.350.00303 951.60000 2,350,000.03 643,33542 Temporary structure to accomodate the labour
951,60103 240,71233
TOTAL CARRIED TO SUMMARY • PINUMINARIES 4,339,400.00
1,736,821.92 1.00 aVIL WORKS
-
1.02 1.11 Mlow to mcbilisalion of macNnery and other equipment to the site
1
Item 910.030.00 910,00103 249,315.07 Allow for Provision at stucture for staircase -roof occes
2
Item 39=0.00 7400103 21,369.86 1.13 Supply and Inslolalion of Concrete hollow blocks
-
A
Walls. ICCMm trick
250
M2
351.00 87,79103 24,041.10
D
Wails. 2XN.M. thiek - 3600
M2
535.00 2.106.00103 576,986.30
TOTAL CARRIED TO SUAWART • CIVIL WORKS 3,181,750.00
371,71233 2.00
NEEL STRUCTURE /1. ROOF WORKS
-
2 01
ROOF STEEL WORKS 1718000/33 3.71400003
-
1.018630.14 1.1leson, Supply. Erection works of steel beams
2.Design °Nino to be as per local codes
3.Design Uve Load will be 3Kn/San and I Imposed load to be 2K n/sqm 4. light weigh' partition max 1Kn/sqm)
4. Max Floor to floor Height 4.8M
5. Cl deck sheet
6.Sfeel Knish: One hour Fie wooing paint above ani-corrosion p ainl.
1
LS
202
1. day tiles & roof Knishes
1
U
7.086.50000 2036,500.00 571,6438s
203
Concrete raft foundation
1
U
936.00303 930.03100 25643836 2.04
GRC dome works Arc wOrkS
1
1
3,720,603.03 3,720,400.00 1.019,34247
205
1.109.400.00 1,109,401103 331945.21
TOTAL CAKED TO SUMMARY • STEEL STRUCTURE i ROOF WORKS
11,570,500.00 3.170030.00
300
MEP WOKS
-
ELECTRICAL WORKS Supply and installation of PVC CO/Iduil and PVC wire fa the
Dimmable light fitting and insIcAolion of LED/PlIpOl JOT rifling incladng necessary conks. cabling for dinning system.
1,794.03
-
301
333
Nos.
598,03103 163,83542
302
Supply and installation of PVC conduit and PVC wire for the
Dimmable cove II idling and IASIOIIONOA 04 LEO cove HIV
Sting inducing necessary control cabling lot dimming system.
IOD
Item 61103 61,10103 16,739.73 3.03
Supply lc Installalion of cabling for switches I dimming conrd far the rooms.
33
m
34164.03 9,360.00
PROT0
I
MO km enclosed area 386 sctm exterior decking area
ITEM NO
Ret
DESCRIPTION
On
UNIT U NIT PRICE (AEDI
AMOUNT (AED)
AMOUNT (USD) 3.05 Installation of Ligh%ng Control panel / Claimer syslem.
1
Nos.
208.020.00 208~03 56,98630 3.06
POWER OUTLETS
Supply ord installation of conauting. cabling & GI box fixing lor
13A skbgle socket
45
Not.
Nos.
1466.40
-
65288.03 18,078.90
307
Supply and installoIon of con:Ming. cabling & GI box Axing lor
13A Twin socket.
15
1,627.63 24,61403 6,685.77
303
Supply and installoIon of I3Amp Single synched socket above lobe ceiling la FCU: Make: Schneider, White PVC
25
Nos.
3,64403 9149310 25,10939 3.09 Supply and installoIon of I3Amp Single synched socket above
false ceiling lawater Neater: Make : Schneider. White PVC
IS
Nos.
346603 54,99003 15,065.75 3.10
Supply ond installoIon of condoling cubing & GI box fixing for
15A snot° socket Supply and installation of I3Amp Sigle socket tor win above
ceiling: Moke : Schneder. White PVC
5
IS
Nos.
NOS.
3666320 18,33103 5021.92
311
448103 70,20303 19,23288 3.12
Supply and installation cl I3Amp single sockel lor Roller Blinds above ceiling: Moke : Schneider. While PVC
8
Nos.
1,79403 14,35203 3,93205 3.13 Supply & kntollolion ot GI cable bunking tor ninNng cables.
2
Nos.
27,30100 5440103 14,95890 3.11 Supply & Instollalion ol Boaboxwith lno of 13A twin sockel
5
Nos.
3,120.00 1540103 4,273.97 3.15
Supply & tratollalion ot single phase isolator lor Me proposed
F.0.1.
10
Nos.
4,160.0) 4140103 11,397.26 3.16 Supply & kntollolion ot threephase isolate la the proposed
chied water EMU including cabling.
2
Nos, I3,033.03 26,03310 7,12329 3.17
Supply & Instollalion ot three chose isolator tor the proposed steam inducing armoured cabling.
I
Nos.
16,700..00 18~00 4,986.30 3.18
Supply & Instollolion ot 4c x 120 scirnm • Icx 70 scinvn armoured cable horn slubout power provided by landlord in reception
area to proposed SMDB in reception areo(Considwing total 15 meters) (Total lead considered lar 120KW ancox)
100
Mn
1,99103 19500103 53,42446 3.19
Supply & instollolion ol ac x 50 !omen 4 la 25 scynm annoured cable horn proposed SMOG to Gilda dedicated fix pool.
103
Mn
910.03 260.020 CO 91,00303 24.93131 3.20 Mot:Meagan work in exiang LV panel for new
lapping.(Assumed as the sluboul for power required will be psovklea near recepnon area by landlord)
DM and CABLING
I
Item 7.60,033.00 71,23223
-
3.21 Supply & knioliallon of SMOG.
2
Nos.
33203.00 6740103 18,52335 3.22 Supply & Inst.:eh:Mon of New DB's
5
Nos.
40,742.00 20371003 55,810.96
TOTAL • ELECTRICAL WORKS
WO
2214.498.03 606,711.78
IT / COMMUNICATION INFRASTRUCTURE WO= Et/DATA/AV CONTAINMENT
-
3.25
Supply and installation of containment lor lel/doto. Conckrits
tom let/dala ovnen to Data Coble Pay 15.03 Nos.
61486 12,22260 3,34846 3.26
CAT6 cabling including terminoIon in both ends.
2500
200
Nos.
Nos.
15600 1.222.26 3,900.0) 1,0049 3.27
Supply and installation of 5Cvnrn containmenl tor PrOfeCtOriN ovnen.
2.444.52 669.73 kOTAL - If / COMMUNICATION INFRASTRUCTURE WORKS
18,567.12 5,086.88 3.28
TIRE ALARM WORKS Nos.
448103
Supply and installation of smoke detectors with necerrory wiring.
20.00 9340100 25,643.84
PROT1
I
850 sqm enclosed area 386 spin exterior decking area
ITEM NO Rel.
DESCRIPTION
COY
UNIT
NITAEDI
PRICE
U
I
AMOUNT (AED)
AMOUNT (USD) 3.30 3.31 3.32
Supply and installation of Heat detectors with repertory wiring in pantry.
2.00 4.00
Not
Nos.
Nos.
448403 9,19303 256438
Supply and installation of break gloss with necessary wiring.
Supply and installation of sounder wit, necessary wiring.
4.160.00 4,160.03 4320.00 2.V9.45 16,640.03 4,55590
3.33 Supply and inUallalion of FACP.
1.03 Nos.
65,033.03 65,033.03 17205.22 3.31
Supply .1 Installation of interlace modules tot Interlacing Me proposed FACP with existing fire alarm loop. BY DENT
Nos.
7,80100
-
-
3.35
Supply and installation of sellconloined EM Tight with necessay wiring and conduiling compete.
Not
03
6503103 58303.00 17205.22 16027.40 3.36
Supply and installation of self contained flit light with necessary wiring and conchAng compete.
1500
Not
30w.03 3.37 Programing. Testing 8 Canmissioring of Me Fire Norm System.
1.00 Item 39003.00 3903303 10443493
TOTAL • FIRE MAIM WORKS 355,420.00 97,375.34
FIRE FIGHT1NG WORKS - NOT CONSIDERED EXCEPT FIRE
EXTINGUISHERS-LOCAL CODE TO BE CHECKED
-
TOTAL • FIRE RGHltiG WORKS
-
-
3.44
EMERGENCY AND EXIT
Supply and InUallalon of Emergency lights, self conkined type
Inc/Wing FP200 cubing. (Consklered only In common carklon)
1
Not.
-
203210 61,11303 16,74329
145
Supply and InUallonion Cl directional EXIT lights. sell combined type including FP200 cabling.
2000 Nos.
3.05165 61,11103 16,743.29
TOTAL • EMERGENCY AM) EXIT 122.226.00 31486.58 3.45
HVAC WORKS
14
Nos.
21,540.03 30526003
Supply and install chilled water FCUS for with anti vibralon fillings and supper's. (oomiSerIng falai 90 Ions)
83,76286 3.47
Supply and install chilled water type FAHU(2933CFM) with heat recovery wheel.
2
Nos.
28T.40DA0 566,9)100 155287.47 3.48 Supply and install control panel for FAHU.
2
Nos.
28,60100 5220003 15.67123 3.49
Supply and installation of chilled water piping la70NFCUs and
If FAHU with properrubber Insulation and support.
250
Mtn
1040.03 2411033.00 7123288 3.50 Supply and install valve package wilt, PICV log ECUs
14
Nos.
24940.03 319.440.03 95,736.99 3.51 Supply and instc I . ; . • • ; - Ioe with PICV kg EMU
2
1
2930 Nos.
Item 92FT 4420100 28.603.00
88
24,219.18 3.52 2460303 7,E35.62 3.53 Supply and Install Fle.insdated Panel ductworks (la ECUS)
complete with plenum boxes. fleAde connections and natatory supports.
8120 205203.03 56.98630 3.51
Supply and install Pre-Inv-lolled Panel ductworks (la FAHU) with neCellary support.
sorr 83.23 166.40303 45,589.04 3.55 Supply d entail sound anenuators for FAHU.
IS
Nos.
20,EODO0 31203103 8547945 3.56 Supply and install Re dampen.
5
Nos.
15,60103 7503103 21,36986
337
Supply and install necessary volume control dampen.
IS
Item 22120.00 436,83103 119.67123 3.58 Supply and install linear slot gills. diffusers and buyers.
1
1
Item imm 154.960.03 39.000.00 154,960.03 39,000.00
4245479 3.59 Testing and canissioning.
10,684.93
L
TOTAL • HVAC WORKS 1051.36003 831989.04 ?CUSSING WORKS
-
PROT2
I
386 sqm exterior decking area
ITEM NO Rel.
DESCRIPTION
QTY
UNIT
UNIT
MI
D CE
IAE
AMOUNT (A®)
AMOUNT (USD) 3.61 Installation of °lent suppled wash basin.
33
Nos, 1,17001 23,40103 6.410.96 3.62 Installation of Client suppled wash basin in...a.
40
Nos.
104003 4140101 11,39726 3.63 3.64 Insloisation of Olen? suppled wale( dose, 8 hand spray
Installation of client supplied shOwer mixer.
IS
6
Nos.
Nos.
1,17001 1,170.01 17,55001 7,03101 4,80522 1,92329 89S0.03
24,539.73
TOTAL • PLUMBING WORKS 3.67 3.643
WATER SUPPLY WORKS Suppl thy 8 Installation of PPR 8 PEX pipe la the water supply
ear
Supply .1 retaliation of PPR margin° for the above wotersuppty points.
M
300
Nos.
Min
1,30101 650.03 97,50103 19503100 26,71233 5342446 3.69
Supply &link:Indian of valves for isololion.
10
Nos.
260103 2403100 7,12329
3/0
Pressue lasing 8 Connecing to ondsfing stubout in some floor.
1
Item 19,50000 19,50103 5,302.47 3.71
BOILERS 8 FLOOR HEATING SYSTEM
1
1,742.030/33 1,742,003.01 477,260.27
TOTAL- WATER SUPPLYWORKS 2080000.00 569,863.01
DRAINAGE WORKS 3.71
Supply I. Installolion of UPVC drainage pipes for me drainage points
25
Nos.
240103 65.0:001 65.00001 17,805.22 17,80522 3.72 Supply .1 Installolion of Floor lops 8 Clean Outs.
25
Nos.
240101
3/3
Supply dInstallolion of Clean Outs.
5
Nos.
2.0B001 10,4010) 2449.32 3.71 Supply 8 Insfallollon of drainage mainline to Me above
drainage points.[Waste 8 soli)
1
Mtn
1,300.00 I,31:001 356.16 3.75 Connecing to &Ming seweoge line /seweagetonk
I
hem
18.20100 182011:0 4,986.30
TOTAL • DRAMAGE WORKS 159,90101 43,805.22
TOTAL CARRIED TOSU/MARY • MEP WORKS 8091.541.12 2.216,86058
400
SOUND SYSTEM
401
Supply and ins Nation of audio system. Includes:
Mule-Zone Digital Auclo Matrix R2 or M2 Power Amp. Kit
Optical Fibre Kit la R2 or M2
Digital MI-In-One Wel Contra Panel for R2 or M2 wilh flushed mount wall box
2 WOy Ceiling scenKet
1
LS
187.20000 18720000 51287.67
TOTAL CARRIED TO SUMMARY • SOUND SYSTEM 187,20000 51,287.67
&AO
WALLS L PARTITION WORKS E. FINISHES
-
6.01
PLASTERING WORKS Sup,* and apply cement Master. finished as specied
-
B
20MM Mick; Fa wets
CO
M2
MO
327,400.00 89.753.42
EXTERIOR WALL CLADDING
900
A
SOLE COLOUR/stone
M2
1,95001 1,755030.00 480,821.92
B
WOOD/erne(
250
M2
3,250.00 81250301 222,60274
EXTERIOR METAL MESH PANEL
600
Supply and installation of molar Cladding for domes 8 root
20D
M2
1.83103 364,00103 99,726.03
PROT3
I
830 icsm enclosed area 386 spar exterior decking area
ITEM NO Ref.
DESCRIPTION
WY
UNIT
UNIT PRICE
MEDI
AMOUNT (AED)
AMOUNT (USD) 6.04 Gypsum Pantlans: Supply and inslollolion of 100MM Mk gypsum
board partitions with filing of joists and I coot primer
GLASS PARTMONS LIMNDOWS
°ear Glass Padlilank Supply and installation of Approx. 2.5tA height, dmPA ark double lenpererd clear glass poninon with
olumillum frame. Gloss panels lo be joined with clew silicon sblp Sae: as rate approved drawings!
100
220
200
M2
[repeated 3 times] 325.00 7.150.1:0 20130 3230303 I 871000.03
6904.11
MO
-
430.938.90
WATERPROOFING WORKS
-
A
Supply and apply 1 teat at cemenlltbus waterprealIng
43,30003 11,041.10
NICHE WORKS
-
6.15
Niche works lot selecled wear plodded In approved wall finish
45
M2
2403.03 117030.03 32,054.79
WALL FINISHES Paid:
n Supply and apply I cool primer and 2 coots of Jona fenornasec point
1030
-
6.16
M2
117.00 117030.00 32,054.79 6.17 Decorative Park Supply and apply of decceorNe paint as per
suppliers instruction for selected wall areas as per design
203
M2
585170 117433003 32,054.79 6.19
WALL CLADDING • Supply and Inslaiallan 390000.03 106,849.32
A
Stone: Supply and installation or slate wall cladding as per suppliers instruction tor selected wall areas as per design
250
M2
1860.03 6.21
CERAMIC TILES • Supply anti Inslallailan
-
D
60(120CM - Poished
IS0
M2
97500 146,250.00 40,068.49 6.22
MOSAIC DIES- Supply and kataiallon
-
C
Stone mosolc Nes
203
M2
1,625.00 325030.00 89,041.10
I
TOTAL CARRIED TOSU/MARY • WAILS L PARTITION WORKS A
FINISHES iy,i/rill5lyt_Li 1,675,931.51
700
CEILING WORKS L FINISHES
-
7.03 7.06 7.07
SUSPENDED GYPSUM GRIMM
-
Supply and installation of suspended gypsum dry ceiling. design as per approved drawings
GEEING PROFILE (Cornice) caves A decorative Hems
850
3S
850
M2
32500 276,TSO.OD 75,684.93
-
Supply ono ns•cii at semi-gloss ceiling motile cornice
CEILING FINISHES
PAINTING FOR GYPSUM CEILING Supply and apply one COOT primer and two cools Jolun
renomaslic emulsion paint on gypsum ceiling
In)
M2
715.00 27300 23325003 231093.00 68,561.44
-
63,575.34
TOTAL CARRIED TO SUMMARY • CEnING WORKS & FINISHES
758,55000 237,821.92
800
BOOR WORKS & FINISHES
-
801
SCREWING WORKS
-
Suopl, one coo ./ el vard se-..ding :1'1:: tz.v_kng mplor for
We: ir,d nos, tyy,f, 1240
M2
325.00 43300303 110410.96
B04
FLOOR FINISHES - Supply and insfatalion
MARBLE 1600
350
-
-
A
20MM Ihk - oltie me,
M2
2.470.03 3.952.033.03 1.082739.73 -8336
8
Maisie We skirong; • C41mm ti ignt
SOW)/ ENGINEERED WO00
LM
71500 250,250.03 48,561.64
-
PROT4
I
850 sam enclosed area 386 sam exterior decking area
ITEM NO Rel.
DESCRIPTION
MY
UNIT
UNIT PRICE (AED1
AMOUNT (AED)
AMOUNT (USD)
A
19MM Mk wood plait
100
M2
2,470.03 247,00003 47,671.23 8.09
II
Wood skeins 1COMM heighl
MOSAIC TILES
90
LM
715.00 64,393.03 17,630.14
-
A
Ceicrric mosaic Nies 50.03
M2
1,560.03 78,00003 21,369.86
B
Gas, inx masdc files. 8Mm thi C 5 50.03
M2
1.870.00 9I,LK0.03 24,931.51
TOTAL CARRIED TO SUMMARY • FLOOR WORKS L FINISHES 8,199,350.00
1 44,479.45 9.00
LIGHTING FIXTURES
-
9.01
A
SPOT LIGHT • Supply and InstaBallon 7W LED RECESSED SPOMGHT with DIE CAST ALUMINUM BODY
and GLASS DIFFUSER MOMS with DAL. confrolled/ 0.10y
DIMMABLE LED DRIVER. colour ternperolure WOLK
200
Nos.
975.00 195.0:0.03 53,42446 9.02
PENDANT UGHT • Supply and inslaalion
-
Pentlanl light TYPE I
30
NOs.
15,60100 46800103 128,219.18 Pendant light. TYPE 2
10
Nos.
15,60100 15603103 42,739.73 Pendant light. TYPE 3
5
Nos.
31.703.00 15603103 42,739.73 Pendant light. TYPE 4
I
Nos.
46)103.00 4480103 12821.92 9.04 Supply and instoliallon ol WALL LAMP
24
Nos.
15,60100 374,40103 102,575.34 9.05 Supply of TABLE LAMP
I
Nos.
19,50100 19,50103 5,342.47
DIMMING SYSTEM
-
9.11 Supply rand programming of Dinning coned system O. I 0 with cabling and commissioning 1 including dimming module
CABUNG WORKS
I
LS
188.9:0.00 188,300.03
-
51,643.84 9.12 Supply one, ins/ ollalion of code; and conduiling waks
I
Nos.
8450100 84,50103 23,15048
TOTAL CARRIED TO SUMMARY • UGHIING FIXTURES 1488.700.00
46245253 10.00
DOORS L WINDOWS
-
10.01
GLASS DOORS
Doer Type I • Single: Supply and installation of 2.1M neight with
1M door opening. IOMM Mk frameless dear !encored glass door, double swing with standard hardware and Ironmongery
Nos.
10,40100
4
4140103 11,39726
10M
Deer Type 3: SUDMG GLASS DOOR SYSTEM (2500A NT tome to
Rae): Supply and insiallation of 6MM thk double tempered clear glass sliding door incluosrc Axed you panel. with
alumMium home. stainless steel titling. Wises, loas and all accessories according ha drawings. specilicabons ona
engineer Instuclions
1
M2
2.415.03 2.405.00 658.90
WOOD DOORS
-
10.05
Door Type 5-Single: Supply and imtallahon of 2.1M height, single leaf finished with point on both sides wilh standard hardware
and ironmongery 90cm
32
Nos.
17,550.03 56140103 153,863.01 10.06
Doe( Type 6 • Double: Supply and instalallon of 21M height with
180CM door opening. double lea? finishedwith paint on both sides. with clear glass vision panels with standard hardware and
(0(11110AgelY
32
Nos.
32,503.00 1040,00003 284,93131 • AL CARRIED TO SUMMARY • DOORS I. WIDOWS
1445405.00 45045048 1100
JOINERY (BUILT-HI FURNITURE)
-
JIM=
RECEPTION
CHANGING ROOM LOCKERS
-
PROT5
I
386 sqm exterior decking area 111M NO 11.03 11.04 Rel.
DESCRIPTION
QTY
UNIT
UNIT PRICE
MEDI
AMOUNT (AED)
AMOUNT (USD)
Supply and installation 012.2M height changing room lockers in mho/ chadded fin'sh wirt) standard turnllore Ilffings for locker
dears
TREATMENT ROOM COUNTERS Supply and inUortallon 0190CM hei st treatment room counters
in lorninatelveneer finish with decorafwe f 'Jailor° Wings for counlei. drawers and gloss cobinel dopes
LOCKER ROOM COUNTERS
Supply and inUollalion 0190CM heigtO locker room counters in larrinateHeneer finish with standard lurrilure linings for counter
drawers and gloss cabinet doors
PANTRY
PANTRY COUNTER AND CABINET
1
Nos.
NOs.
NOs.
260.03003 455.03003 260000.00 7123248
-
11.05
-
-
11.06 Supply and installation of 11 CCm height cabinet counter In lamnate finish and selected sione sop finish with standard
turrilure finings for counter drawers and cabinet doers
1
Nos.
Nos.
-
BEDROOM Complete lumilure set 45500:LCO 11.07
Supply and inUollalion of cornplele bedroom furniture including the welkin changing room etc
124,65733
TOTAL CARRIED TO SUMMARY • JOINERY (BUILT.IN FURNITURE)
71630030 195,890.41 12.00
LOOSE FURNITURE
-
12.01 Sorted
3
13:03.00 39300.00 10,68433 12.02 Small table
3
9,793.03 29250.33 831170 12.03 Moduli
2
15403.00 31,233.33 B,54735 12.04 Rinke Twoseat Sofa
2
24,703.00 49,403.00 13,53425 12.05 aNnet for changing
1B,85000 37,701C0 10328.77 12.06 Shoat
6
13333.03 65,003.00 17305.22 12.09 EsSerlor Two seal sofa
8
28403.00 171,401C0 47,013.70 12.10 &Seri*. liable
3
25,350.00 76,050.00 20,53542 12.11 Coublebed
1
3250100 32.501C0 8,904.11 12.12 011icadesk
1
18,89100 1849103 5.16438 12.13 Chair to oMce desk
1
10.403.00 10,401C0 2,849.32 12.14 Wardrobe
1
195.33030 195333.030 53,424.66 12.15 Cold drinks cabinel
24,700.00 24,701C0 6,767.12 12.16 Bedroom caNnet
1
84,93300 84,500.W 23,15048 12.17 Bedroom siderables
2
11,70000 21401W 6,41036 12.18 Massage desk
1
45,93000 45.501W 12,46175 12.19 EaSerice caning table
1
26,00000 26.001W 7,12329
PROT6
I
386 sqm exlerlor decldng area
HIM NO
RM.
DESCRIPTION
OTT
UNIT
UNIT PRICE
MEDI
AMOUNT (AED)
AMOUNT (USD) 12.21
AI3E.sa9e roan cannel
3
18/350.00 56.550.1:0 15493.15 12.23 Pad stribed
4
II/0100 46.80103 12221.92 12.24 Pod side table
4
9,750.00 39,00040 10484.93
TOTAL CAMEO TO SUMMARY • LOOSE TURNMIRE 1,147,20000
319,835.62 13.00
WINDOW TREATMENTS
-
1301
DRAPERY
SHEER CURTAIN
-
OR:I Supply CACinstollolon of 3M width Men sneer curtains on ceiling Arocksl coricin rods and hotchy ate os per requirements
200 sqm 2.34003 465,CK0.1:0 128219.16
TOTAL CARPED TO SUMMARY • WINDOW TREATMENTS 46103303
128,219.16 14.00
M
SANITARY WARE
-
1401 (WASH BASIN SET) 13,356.16
A
UNDERCOUNIER WASH BASHI
5
Nos.
9.750.03 45,793.03
-
B
COUNTERTOP WASH BASIN Nos.
-
C
WASH BASIN AND SEMI PEDESTAL Nos.
-
-
AA
3 HOLE DECK MOUNTED BASIN MIXER Nos.
-
-
BEI
MONO TALL BASIN MIXER Nos.
-
-
CC
MONO BASIN MIXER WITH POP)UP WASTE Nos.
-
-
14.02
SOME TRAP Nos.
-
-
14.03
MINI ANGLE VALVE Nos.
-
-
14.04
BBB
(WC SET)
FLOOR MOUNTED CLOSE COUPLED WC
SEAT AND COVER
A
3
NOS.
9,750.03 29,293.03 801170
CLOSE COUPLED CISTERN WITH COVER
NOS.
-
-
AQUAECO BOTTOM INLET MECHANISM Nos.
-
-
B
WALL MOUNTED WC
SEAT AND COVER
-
CONCEALED CISTERN FOR WALL HUNG WC Nos.
-
-
RUBBER COLLAR WC WASTE
NOS.
14.05
FLUSH PLATE
NOS.
-
SHATTAF SET)
BIDET SPRAY
ANGLE VALVE
SHOWER SET)
5
Nos.
S
1.1.06 1,59303 7,80103 2,13639 14.07
NOS.
-
-
1.1.0E1
SHOWER HEAD AND CONCEALED SHOWER MIXER WITH DI MUER
HANDS HOWER WITH SUM MIL Nos.
-
14.09
-
-
14.10
SHOWER COLUMN WITH MIXER Nos.
-
-
PROT7
I
386 sqm exterior decWng area M9A NO 14.11 14.12
RM.
DESCRIPTION (ACCESSORIES SET)
TOILET ROLL HOLDER
TOILET ROIL HOLDER
ROBE HOOK
CMS
UNIT
UNIT PRICE
JAEN__
AMOUNT (AED)
AMOUNT (USD) Nos.
Nos.
5850.00 43,950.00 11,219.18
-
A
SINGLE ROBE HOOK
-
-
B
DOUBLE ROBE HOOK Nos.
-
-
14.13
TOWEL RAIL
SINGLE TOWEL RAIL Nos.
-
11.14 11.15 14.16
SOAP BASKET
SOAP DISH AND HOLDER
AMENITY TRAY Nos.
-
[repeated 5 times] 14.17
A
PEDAL BIN Rod t i ti Nr<lo S.,
NOS.
NOS.
-
-
B
SQUARE Pedu S., (BATHROOM MIRRORS)
NOS.
2470.00 15.0:0.03
-
-
11.18
ILLUMINATED BATHROOM MIRROR 11.19
BATHROOM MIRROR
NON-KWMINAlED STANDARD MIRROR
20
1
Nos.
NOs.
Nos.
[repeated 4 times]
-
MAIO 11.20
FLOOR ORAN 74,1000) 2830127 14.21
A
B
SHOWER DRAIN
TILE DRAIN tor Shower 'vALL DRAIN tor Shower (PANTRY SINK SET)
KITCHEN SINK INSET SINK
ROME TRAP PP BOTTLE TRAP
-
[repeated 4 times] 1.1.22 15,60103 4.273.97 1123 11.24
KITCHEN SINK MIXER SINGLE HOLE SINK MIXER Nos,
-
-
14.25
MINI ANGIE VALVE Nos.
-
-
11.24
FLOOR DRAIN Nos.
-
-
TOTAL CARRIED TO SUMMARY • SANITARY WARE 214,450.00
59,301.37
IBM
OS/LE APPLIANCES
-
PANTRY EQUIPMENT
-
15.01 15.02 15.03 15.04
El
Ea
Ea
E4
Coffee "'ocnne
TOcglet water boiler Samsung retregValor wilt) water Spenser QC pc rate 780Goed
1
I
NO5.
Nos.
16.250.03 1575.03 3250.03 1889100 16,29303 3,57.5.00
4.45205 97905 3,293.01 890.41 18,85O0D 5,164.36 15.05
ES
Microwave . pc role 929 aed
I
Nos.
3,7713.130 3,77DM 1,03228 15.07
El
Cieweasher lindoStriall
I
Nos, 210300 21013.130 249115
AUDIO VISUAL EQUIPMENT
I
I
PROT8
I
386 sqm exterior decking area nimmo Rel.
DESCRIP710N
COY
1.00
UNIT Nos.
UNIT PRICE
JAED1__ 5850.00
AMOUNT (AED)
AMOUNT (USD) 15.09 !PORT 'POO DOCKS 5$5100 1.60274
15.10 Televi;ion 1.00 Nos.
26.000.00 26000.00 7,12129
TOTAL CARRIED TO SUMMARY • OUSE APPLIANCES 86,64500
23.73836 16.00
WIRING DEVICES
_b_
-
16.01 16.02 Supply ol 1G 13A 13P Switched
45
20
Nos.
12831 5.773.95 1,581.90 Supply of 2G 13A DP Switched
Nos.
209.30 4,18601 1,14635 16.03 Supply of EUR 8145 CAT6 IM dab socket
10
Nos.
45.50 45503 124.66 16.04 Supply and inskilanon of Thermostat with external sensor
IS
Nos.
981..50 14.722.50
LP" 56
TOTAL CARRIED TO SUMMARY • WIRING DEVICES 25,137.45
6,886.97 17.00
ADDITIONAL ITEMS 17.03 Mate cabanas for terrace swimming pool area
1
Nos.
403.030.00 448130102 128219.18 17.04 Laundry Bag
1
Nos.
260102 2.60103 71233 17.05 Emergency torch
1
Nos.
1,99103 1,99103 53425 17.06 Nat dryer
1
Nos.
240100 2.40103 71233 17.07 17.08 Wade bln
WALL ARIWORK - Supply melt
5
45
Nos, 3,25003 1540103 1629103 70200/00 4,45205 192,32/77
17.09
A
MIRROR -Supply and lb
-
Full height tetra
1
Nos.
11,70102 11,70102 3,20148 17.10
8
78CM width x 19604 (of °Mei) height mirror
DOOR RUG • Supply
5
Nos.
11,70100 *50103 16,027.40
-
8
Al Private Office Area
2
Nos.
19,50100 3900100 10,684.93
C
At ireCIMIIIII Room Area
2
!C
Nos.
Nos
19,503.00 3.250,00 39,011103 10484.93
PLANTERS - Supply indoof Porte, pots. Self itcraing
17.11 32.503.00 8,904.11
TOTAL CARRED TO SUMMARY • ADDITIONAL ITEMS 1374.10000
376,465.75 18.00
SAUNA 8 STEAM ROOM WORKS 18.02
STEAM ROOM Supply and inUollallon ol Steam generally. (9kvil incbang steam door, automatic discharge valve. steam nonle. steam
NOV. ceiling doom dome with ties and steam fragrance
LS
448.50000
-
1.00 448300.00 122,876.71
TOTAL CARRED TO SUMMARY • SAUNA L STEAM ROOM WORKS ligaill
122,876.71 19.00
TRADMONAL HAMMAM WORKS
-
WALL WATERPROOFING 19.01 Supply and apply 1 coot ol cemenlMous waterproofing
350
M2
32500 113,793.03 31,164.38 19.02
WALL FINISHES • Supply and Installation
PROT9
I
384 sqm exterior decking area
ITEM NO
RM.
DESCRIPTION
COY
UNIT
UNIT PRICE
SA
2.503.CO 4353.0)
-
5853.0)
AMOUNT (AED)
AMOUNT (USD) 19.03 19.04 19.05
A
MARBLE
700
M2
1.750=0.03 479.452.05
II
CERAMIC TILES
M2
C
MOSAIC ALES
22)
M2
91030 249.315.07
ROOK WATERPROOFING
A
ll
C
Supply andapply 1 layer of bituminouswaterproofing membrane on Roofs
FLOOR FINISHES • Supply and Insblattan
300
I
'8
I
16
M2
[repeated 4 times]
-
mARRE
CERA.m C TILES
MOSAIC 'ILES
SPECIAL ITEMS Control stone Special washbasin Rumos ) proEles
Caumns 1.7755,000.00 480421.92
-
390,07000 11.701.03
-
455.03000 9730100 3900[0.01 2106[0.03 455003.03 I .540000.03
106449.32 57,69843 12445753 47,39724
TOTAL CARRIED TO SUMMARY • TRADITIONAL HAMMAM WORKS
5,129,393.03 1,405,301.37 21.00
POOL TERRACE WORKS
-
H.00R WATERPROOFING
-
21.01 Supply and apply 1 toyer of bituminous watenxcoling membrane on noon
100
M2
26000 260110.03 7,12329
WALL FINISHES
-
21.02
WPC WALL PANEL: Supply and installolon of WPC outdoor wall panel. h011Ow profile with ell accessories
-
II
Length: 2.9MTR
103
M2
1540.03 15400001 42,739.73
FLOOR FINISHES
-
WPC TILE DECKING (Hallow/ Full Profile)
-
C
Lere0):5.13m1R
250
M2
65000 162,500.03 44520.55
LIGHTING
-
21.06
DEC[ L:Glii. RECESSED
33
Nos.
455.03 9,10003 2.493.15 21.07
DOWNUGHT. WALL MOUNTED
50
Nos.
845.00 4749103 1157534
TOTAL CARRIED TO SUMMARY • POOL TERRACE WORKS
I
395,150.00 108452.05 22.00
SWIMMING POOL WORKS
-
C
OVERFLOW TYPE
CCe6kl/Cii0/1 of FIBER GLASS, OVERFLOW TYPE swimming pool wilt, mosaic Me linis/Vng. Inducing installolion ond conneclions
ol MEP equipments. Pool Maintenance Kit one, Plumbing Ord
Esechical Accessories
1
-
U
975.0:0.00
-
975
247,12329
TOTAL CARRIED TO SUMMARY • SWIPM1ING POOL WORKS 975033.03
247,12329
SUAWARY•TURKISH HAMMAM & RESIDENCE- GREAT ST JAMES
ISLAND
No
DESCRIPIION
TOTAL AMOUNT (MD)
TOTAL AMOUNT (USD)
PREUMINARIES
CIVIL WORKS
STEEL STRUCTURE IL ROOF WORKS 6339,40003 1,736,821.92
1.00 2.00 3,181,750.00 871.712.33 11,570,500.00 3,170)2)0.00
PROT10
I
386 sctm exterior decking area
UNIT PRICE
ITEM NO Rel.
DESCRIPTION
CITY
UNIT
AMOUNT (AED)
AMOUNT (USD) (AED1 3.00
MEP WORKS 8,091,541.12 2.216460.58 4.00
SOUND SYSTEM 187.200.00 5128267 6.00
WALLS L PARTMON WORKS L FINISHES 6.117.150.00 1,675,931.51
7.00
CEILING WORKS a FINISHES 758.550.00 207,82132 8.00
FLOOR WORKS a FINISHES 5.199.350.00 1,424,479.45 9.00
LIGHTING FIXTURES 1.688.700.00 462457.53 10.00
DOORS a WINDOWS 1,646.605.00 450,85048 1120
JOINERY (BUILT.IN FURNITURE) 716,000.00 195490.41 1220
LOOSE FURNITURE 1,167,400.00 319435.62 13.00
WINDOW TREATMENTS 468.00000 128219.18 14.00
SANITARY WARE 216.450.00 59,301.37 15.00
OSIE APPLIANCES 86.645.00 23.73836 16.00
WIRING DEVICES 25.137.45 6.884.97 17.00
ADDITIONAL ITEMS 1,374.100.00 376.465.75 18.00
SAUNA a STEAM ROOM WORKS 448.500.00 122476.71
MOO
TRADITIONAL HAMMAM WORKS 5,129.350.00 1,405201.37 21.00
I POOL TERRACE WORKS 395.850.00 108,452.05 22.00 975.000.00
SWIMMING POOL WORKS 267,12329
TOTAL MD t USD 66,781,178.67 15262,614.68 2.6.00
OLCUAIONS 26.01
LOCAL FEES 1.00
ITEM
-
26.02
LOCAL TRANSPORTATION 1.00
ITEM
-
26.03
LOCAL CONTRACTOR FEES 1.00
ITEM
-
26.04
LOCAL CONSULTANT FEES 1.00
ITEM
-
26.05
INTERNATIONAL. TRANSPORTATION FEES 1.00
ITEM
-
26.06
LABOUR L MANAGEMENT NSA COST L VGA WORKS 1.00
ITEM 26.07
INFRA STRUCTURE WORKS 1.00
ITEM 26.08
ANY THIRD PARTY FEES 1.00
ITEM 26.09
LOCAL TAX 1.00
ITEM 26.10
AMERICAN STANDARTS 70 BE DISCUSSED 26.11 26.12
THIS ESTIMATION IS PREPARED BASED ON LUMP SUM BASIS
-
WE CONSIDERED ALL( EXCEPT THE CONCRETE a BLOCK SIMILAR
TYPE OF MATERIAL) I. THE MATERIALS AND ITEMS TO U SENT FROM
26.13
DUBAI OR ISTANBUL 26.14
TIME ESTIMATION 26.15 3 MONTHS FOR THE DETAILED DESIGNED
26.16 12 MONTHS FOR CONSTRUCTION (TO BE DISCUSSED)
26.17 26.18
WC
The conbaclor should WO the see and obtain necessary
26.19
Into/motions lot raking and at quantl$es are to be checked and refilled fully.
26.23
Connector are fully responsible for design and pedermenee kw
Rena/services under his scope obvert
PROT11
I
386 sqm exterior decldng area nun NO 26.21 Rel.
DESCRIPITON quotation Is for the items quoted ii the above BOO only; any
Works to the stated items or Variations on the existing shot be quoted separately and agreed with the Client
thee execution and any cancellation shall increase the of other "ems.
liability lo be discussed along with maintenance and Condition,-
CITY
60%
35%
UNIT
UNIT PRICE
JAED1__
AMOUNT (AED)
AMOUNT (USD) this Additional items before cosh Defect
Terms 2622 26.23 26.24 26.25 26.26 Advance Payment
Progress Payments Final Payment 26.27 2628 26.29
5%
I2 weeks 26.33 26.31 Works Duration.
Design 26.32 Conslruellon 52 weeks 26.33 local approvals not considered in Ihis offer
26.31 Completion start samples& by the
Any implications 26.35 26.36 26.37
24
duration 52weeks.Commencement of works shoe upon the advance payment is received & material
drawings to be approved as per the contractor s offer aultorities and client.
26
vadatiens forthe above h additional costs & time 26.40
Any casts
My
in
sub contractor*, supplier sisal be subject fa & time impacallons.
26.41 authorly maatcaffens shot clef this offer.
26.4 My addiffenal MEP requitement shall be additional cost
24.43
Any cos.
AN the Alf the
by
°Whet add/honor regukement is subject to additional
7.6.44 above is prepocied according lathe &awes. proposed.
submitted material samples & Mowing, to be approved
Me client.
264
Any
al
LLC.
nominateed subcontractor is at the expense of the client.
your disposal for any services you may need.
Client representative Sipnalure/ Company Thanking Yaws Faithfully.
Cs ARCHITECTURE Cem Kapanc Archil Mobil Email.
you and we remain
INTERIORS
WNW name stamp
PROT12
Technical Artifacts (50)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
2.503.coDomain
built.inFlight #
AA3IPv4
6.117.150.00IPv6
1::Phone
1
3250100Phone
1233 5342446Phone
12445753Phone
15400001Phone
15603103Phone
17433003Phone
18720000Phone
2403100Phone
2411033Phone
2460303Phone
2830127Phone
3230303Phone
3300303Phone
3325003Phone
3666320Phone
3900100Phone
3903303Phone
403 9149310Phone
4140101Phone
4140103Phone
4245479Phone
4420100Phone
4480103Phone
4749103Phone
5045048Phone
5128267Phone
5220003Phone
5440103Phone
5643836Phone
6103303Phone
6140103Phone
6245253Phone
6503103Phone
6740103Phone
6800103Phone
7123248Phone
7123288Phone
7400103Phone
7503103Phone
8130102Phone
8450100Phone
8547945Phone
9340100Phone
9730100SWIFT/BIC
IASIOIIONOAForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.