Skip to main content
Skip to content
Case File
efta-efta00618061DOJ Data Set 9Other

SCOTT GRAF

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00618061
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
SCOTT GRAF October 13, 2009 TO: Little St. James ATTN: Brice and RE: Emad Hanna Daphne Wallace Irrigation systems repairs and maintenance Received 9/8 - 9/28 invoice payment on 10/1/09. Thank you TIME: A total for work performed by 2 men on 10/2,10/9 and 10/13 @$400 per day. A total for work performed by 1 man @ $200 per day for 10/5. $1200.00 $ 200.00 10/2  2 men We had to relocated (5) 12" heads that were removed by Shillingfords wall. We also replaced (2) damaged 4" heads in turf heads in turf area by helo. After new mowers finished on beach front, we had (2) rotors that were damaged by salt pond 10/5/ 1 man lames ran through all upper zones in AM. We relocated 1.5" pipe tine, water line and hose babe for torn at master bedroom demo. I faxed all materials lists for Steve to Florida wholesale and itemized pipe. 10/9 / 2 men We had (5) valves isolated in AM. We ran 18/ to get all valves operable. In M Omar had rock walls repairs at cottage and we relocated valve #7. We reset time clock controller in PM (breaker). 10/13/ 2 men After demo work on 10/8 and 10/9 my helper and I located and marked all existing pipers and cables that the trac hoe exposed. We also buried cable that was damaged and repaired access from cottage. TOTAL FOR THIS trivolernatoo.00 APPROVED 4/7 ilef,a5 1/45 EFTA00618061

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.