Skip to main content
Skip to content
Case File
efta-efta00621644DOJ Data Set 9Other

LSJ CONSTRUCTION

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00621644
Pages
6
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
LSJ CONSTRUCTION Subcontractor Payout Project: Flagpole Pool #1013 Trade: Plaster Subcontractor Phillip Mark Invoice # Phase # Requisition #1 09-200 Original Contract Sum: Change Orders Submitted & Approved: New Change Orders: Total Work Contracted to Date: Insurance ex•iration: Ma 14.2012 Partial July 18, 2011 Requisition #1 Final X $11,212.12 $1,899.76 $0.00 $13,111.88 Total Work Completed to Date: 100% $13,111.88 Less Retainage: $0.00 Total Payments Made to Date: $0.00 Total Current Payment Due: $13,111.88 694 Balance to Finish including Retainage: $0.00 Sales Tax Liability: a. Subcontractor/Supplier is liable, explaii Labor and materials b. Non-resident Subcontractor/Supplier Bond Applicable: c. Use Tax to be paid by our company: d. Shipping Total Outlays for this contract incl. Sales or Use Tax: $13,111.88 incl. JEE approval attached YES NO X Submitted Bill Signed: Date: July 18. 2011 Approved by: Emad Signed: Date: Invoice Attached YES NO Approved by: Gary Signed: Date: July 18, 2011 Approved by: Signed: Date: PROT0 LSJ CONSTRUCTION Project Flagpole Pool 51013 ontractor lull legal name: Philip Mark Phase N 09-200 Trade. Plaster Invoice Requisition #1 Insurance expiration: 5/14112 Payment Partial Final X Invoice/Reg# Dale C/O Amount Retainage Due Paid Date Paid Check./ Balance I Contract 07/11/1 1 In tenor plaster 11.212 12 CO#1 CO#2 CON3 CO#4 'CONS 07/13111 Sheds Structure 1.899.76 Requisition N1 Requisition N2 Requisition #3 Requisition*. Requisition #5 Requisition #6 07/17/11 Final 13.111.138 0.00 13,111.88 1111188 0.00 000 0.00 [repeated 13 times] Total 13,111.88 0.00 11111.88 0.00 13,111.88 I Date Revised: July 16. 2011 Contract Amount - Phase contract CO#1 CO#2 CONS CO#4 CONS Cistern Coatings Shade Structure 11.212.12 1.899 76 Contracted To Date Balance of Contract vdRetairtage 13,111.88 0.00 PROT1 Phillip Mark Sub-Contractor LICENSED GENERAL BUILD. 0 CISTERN CLEANING • ROOFS TILING • PAINTING • SWIMING POOLS -ANISH WORK Cellular: (340) 998.3655 Phoro: (340)777.5820 HOSPITAL GROUND NO. 171 ST. THOMAS, U.S. V.1.00802 i I c -1 75 e710 rt) 775 4 \cc ,c1 e. (-\\ A/kW (k t 6: k AV\ n' i sC ) . -N(.,/c,f1.1)1YI(4 (k% A/ /(I tfi ke, 1 5 2_, /4 / "fi ("' 11 1C 1r( I rt j ► 111 2 - 11, 1Z El s grit By PROT2 • -4. foRtis. 4 Peel L a. 025:ba 7/ 76. 4.256 3231 /Q1 _7 8 a5.0 .?.(4, 321p. 38 ..3lca.. x. r ., PROT3 Phillip Mark Sub-Contractor LICENSED GENERAL BUILDER 0 CISTERN CLEANING • ROOFS TILING • PAINTING • SWINK. POOL'S FINISH WORK Cellu(ar. (340) 998.3655 Phor.o (340)777-5820 HOSPITAL GROUND No. 171 ST. THOM AD. U.S. 0.1.00002 t'\\\ \nc - 1 )ickr' ( F ) tCc \\ ft \c- ))\ c -)ec-17- Or (tY . -11' 1 In i fin ref 7- H nt 5-0 ( , ,((a( r-or. (ar (\ k) Hoi:Ark Rfl trl 11 I)) II PROT4 I! .?1\014) I HiN5, '\) 7-1e-11 CAC, x 1.97;,,1 3 4, - 29 si4+ `X 8" 3?.1 s9 -14 -ZV A'c." x (6. SFr/ /1'22, r7 ,sei. -72 PROT5

Technical Artifacts (4)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone(340) 998.3655
Phone(340)777-5820
Phone(340)777.5820
Phone256 3231

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.