Skip to main content
Skip to content
Case File
efta-efta00622142DOJ Data Set 9Other

VIRGIN ISLAND GUNITE POOLS

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00622142
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
VIRGIN ISLAND GUNITE POOLS St. Thomas — U.S. Virgin Islands 340-998.3803 Date: Jan. 21, 2011 PROPOSAL Proposal submitted to: Name: L.S.J., L.L.0 Street: City: State; Zip: Phone: Work to be performed at: Little St. James E-mail: We hereby propose to furnish the following materials, equipment and perform the labor necessary fur the completion of: 1.) 1— 21 x 75 Rectangle Gunite Pool — 4' — 10' Depth 2.) 6" Waterline tile of L.S.J Choice 3.) 16" x 24" x 2" Thick Pool Coping — L.S.J. Choice of Coping 4.) Caretaker In-Floor Cleaning System 5.) 3 — LED Pool Lights 6.) 2 Sets of Steps in Pool 7.) 2 Benches in Deep End of Pool (If wanted) 8.) 2— Pentair Variable Speed Pumps 9.) 2— Pentair Cartridge Filters 10.) 2— Heat Pumps 11.) 2— Pentair IntelliChlor Chlorine Generators 12.) 1 — Auto Water Leveler 13.) Diamond Brite Interior Pool Finish 14.) Plumb Pool with all schedule 80 pipe L.SJ., L.L.C. is to furnish equipment and operator to excavate the pool and to supply all gunite material as per specifications. Virgin Island Gunite Pools to oversee the excavation and furnish all rebar, plumbing and gunite plans. Virgin Island Gunite Pools to have pool plumbed, steeled and gunited within 4 weeks of excavation. All material is guaranteed to be as specified and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of: $207,800.00 - Two hundred seven thousand eight hundred dollars With payments to be made as follows: Progressive payments as per agreed upon Deposit upon move in of jobsite Due upon completion of steel Due upon completion of gunite Due upon completion of tile and coping Balance due upon startup and use Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents, or delays beyond our control. Customer to carry lire, tornado, and all other necessary insurance upon above work. Respectfully Submitted: Per: Bart Wolterman EFTA00622142 Note: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are hereby authorized to do the work as specified. Payment will be made as outlined above. Date: Signature: L.S.J., L.L.C. Date: Signature: Virgin Island Gunite Pools EFTA00622143

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone340-998.3803

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.