Skip to main content
Skip to content
Case File
efta-efta00622509DOJ Data Set 9Other

Emad Hanna

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00622509
Pages
4
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Emad Hanna From: Monique Harry [ Sent: Monday. Novem....... To: Emad Hanna Subject: Virgin Islands Granite & Marble Req 3 Attachments: VI Granite & Marble 1009 Req 3 pdf Emad, Attached for payment Virgin Island Granite & Marble Req :3 in the amount of $2,550.07. Project 1009 Code 12-310. Monique 1 EFTA00622509 LSJ CONSTRUCTION Subcontractor Payout Project: Existing Compound Renovation #1009 Trade: Granite Countertops Subcontractor Virgin Islands Granite & Marble Insurance ex iration: Invoice # Phase # Requisition #03 12-310 Original Contract Sum: Change Orders Submitted & Approved: New Change Orders: Total Work Contracted to Date: Total Work Completed to Date: Less Retainage: Total Payments Made to Date: Total Current Payment Due: Balance to Finish including Retainage: Sales Tax Liability: November 1, 2010 Requisition #03 S8 421.75 $0.00 $14 047.58 82% $11 a. Subcontractor/Supplier is liable, explaii install only / tax included in contract b. Non-resident Subcontractor/Supplier Bond Applicable: c. Use Tax to be paid by our company: d. Shipping Total Outlays for this contract incl. Sales or Use Tax: 497.51 $0.00 $8 947.44 $21550.07 $2,00.07 None JEE approval attached YES NO X Submitted Bill 014 Signed: Date: November 1, 2010 Approved by: Emad Signed: Date Invoice Attached YES NO X Approved by: Gary Signed. Date: November 1. 2010 Approved by: Signed Date 497.51 EFTA00622510 Si I CON5tRUCTION Protect Ems ye, CoMbOund Renovaiscn at(t Supplier • full toga' name Virgin Islands Crone. 8 Marble Mine N 123'-0 Trade Granite GOG01€410114 41,44:040 Requrstc., 003 Date Revered November 1 201C, hairline. expiration Payment Partial Finai X invoicerReila Cate Cr0 Amount Reta rage Due Paid 1 0 Paul Oleos* Balance J Contract Amount 08O2/10 5 625 83 COr1 Additional Countiinop X 321 61 CO, 2 1D29.10 Repace Vanity Tops LIE) 5 100 14 COa3 C004 CO.5 -a- Requisition at 08.02/10 Deposit 2 812 92 099 2.812 92 0.00 Requisition 22 17930, 10 Balance 6 134 52 g DO 6,134 52 000 Requisition #3 I No% 1C Deposit 12 2.35007 2,55007 2.55007 Requisition at 000 total 11 497 51 1 000 1, 4975' 8.94744 I 2550 07 Contract Amount . Prase Contract Granite Countunops 5.625 83 CO•1 Addebnnal opunlefiflps 1 :321 €1 Desecrs000 C0012 Replace Vann./ Tops WE] 5 toe 14 Dem.- Doom CO1O Deiscnption Desorption CONS DEISCP€41011 Contracted To Dale 14.047 58 Balance of Contract wabetairtege 2 550 07 EFTA00622511 VIRGIN ISLANDS GRANITE &MARBLE EST 1,11 VTE DAD Nlosll R \NMI CI -SD/511H 'WON' S% MA II RINI Al 1 1-C111) Plxl DI All Vanities /o Tops 1029 3010 Hill How k. IAA: u lanic. Nalwary While i =Malt PI N X 6200 ESInIt RYDENIKU. St:III I TILAMAS. VI 00302 al MA I REQUIRLD BACK SPI ASH SC SINK 117 Ul rf e DROP-IN SINK VIII CH O/ INDI-RMOI 9/I I SINK CI I (N;1 /. COOK [OP • CHCMCOKI: 1 11-933 SINKS DFIAII I I- SI )1/11N 1)1.1 IVIltl" LESS 50% DEPOSIT REQUIRED I.ESS 30% PRIOR TO DELIVERY BALANCE DUE AT COMPLETION DEPOSIT CHECK 4 lb I? NI 0 00 1.1 IA IA 1 I A IA 3 I A 19 9? IN NI All RIAI NN DA( KAPIAMI MAIL/0AI 165.50 1.5E 4309 51 I 5015) 3,,EA 75110 STA 20000 5 I A 10000 51-A 11000 S1 :A 7S NI 51.1 450110 5I A 3 cm 2.676.14 S 5 S S S 5 330.00 S 1.44/00 S 60000 PROJECT TOTAL - FABRICATED AND INSTALL I) 5 5.100.14 5 2.550.07 $ 1.530 04 5 1.020.03 v179;7010 100 F twat fiwwiss Sliwory w 9mm~ no top EFTA00622512

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.