Skip to main content
Skip to content
Case File
efta-efta00628144DOJ Data Set 9Other

DS9 Document EFTA00628144

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00628144
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: To: "Je vacation" alla> Subject: Apu GIV upgrade Date: Mon, 22 Apr 2013 16:49:02 +0000 Importance: Normal Jeffrey, Rusty is working on GIV type rating options if we agree to cockpit upgrade, should have answer in couple of hours. -inspections are complete, only remaining open inspection item is flap track micrometer measurements to verily they are in limits, since flaps are removed. -we have several items we will address for repair such as: -nose of radome requires honeycomb repair on tip of radome, will be fixed locally. -auto throttle rigging throttle split -air pressure High pressure inlet guide vane adjustment, air cycle machine item. -DC voltage panel -new flap actuator install. Separate note: we need to install the loaner APU for engine runs and continued trouble shooting on engines. Do you approve of APU upgrade so I may sign contract for upgrade so APU loaner could be installed today? Darren and Dennis will modify contract. Do you agree to proceed with APU upgrade? -$211,000 for upgrade, Dennis pays $115,000 of this amount and labor to remove and install loaner., Thank you, Larry Sent via BlackBerry by AT&T EFTA00628144

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.