Skip to main content
Skip to content
Case File
efta-efta00647725DOJ Data Set 9Other

From: Craig Martin ..c

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00647725
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Craig Martin ..c > To: brice gordon <a. Cc: Richard Kahn a, TOM MELNICK <a. Subject: Steel Building Date: Thu, 03 May 2012 17:34:57 +0000 Brice; As you put the numbers together for the new pre-fab engineering building please be as specific as possible. Where you have to leave an allowance for an item please identify. Tom's work should be as specific as possible, separating labor from material etc. Please put on Excel spread sheet. To include; (Feel free to add more categories) • Site preparation labor and material • Permits, shipping, taxes, duties • Any design work or does needed for Govt approval, does this have to be inspected by govt? • Cost of structure, FOB where? • Installation of structure, labor and material • Concrete pad, labor and material • Exact size of building and pad • Concrete apron and or yard improvements • Sewage/Water provisions • Plumbing, electrical,lighting • Septic tank or grease trap • Site drainage • Equipment rental, if necessary • Repair of other building/shed • Any additional labor • Outside labor for installation plus Tom's cost to supervise job. Please call if you need help. If needed we can conference call Tom you and myself. Are we shooting for today or Monday? Craig EFTA00647725

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.