Case File
efta-efta00655369DOJ Data Set 9OtherDS9 Document EFTA00655369
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00655369
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
To: "Je vacation" <jeevacation®gmail.com>
Cc:
aa>,
"Lesley Groff'
Subject: Delay
Date: Mon, 12 Sep 2011 22:47:17 +0000
I mportance: Normal
Jeffrey,
During preflight notice hydraulic fluid on the nose tire,
Meridean Maintenance found a Pin hole leak just before the flap selenoid,.
Fastest repair is cutting the end of line where pin is located and installing new swadge fitting, this is gulfstream
approved repair, since part is not readily available,.
The special tooling that compresses the fitting end is located at Morrison, we will not be able to pick up tool till
6am tomorrow, since Pete at Meridean maintenace is borrowing the tooling and needs to pick up this tool in
person, since he's borrowing it, and its value is $15,000 for this special tool,.
We should be able to have wheels up at noon,.
I'll keep you posted,.
Sent via BlackBerry by AT&T
EFTA00655369
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
gmail.comForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.