Skip to main content
Skip to content
Case File
efta-efta00689689DOJ Data Set 9Other

From: Richard Kahn

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00689689
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn To: "jeffrey E." <jeevacatio4egmail.com> Subject: Fwd: Big N Date: Fri, 25 Sep 2015 19:20:45 +0000 > please advise thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York. NY 10022 tel fax cell Begin forwarded message: From: gene kral Subject: Big N Date: September 25, 2015 at 3:14:41 To: Rich Kahn < Kral Reply-To: gene kral < September 25, 2015 LSJ, LLC Re: Big N Dear Mr. Kahn, PM EDT >, Ann Rodriquez Mary After speaking with you this morning, I wanted to take the time to clarify a few things. When the Big N came to our yard, there was no precise scope of work in place. Our understanding from LSJ employees was to get the vessel back in service with the least amount of work and money involved. As we undertook the quoted projects there were inevitable small items needing repair that became apparent. EFTA00689689 We have billed a total of $362,907.94. The additional billing that we have is less that 1% of the total. At Anna's request -- when issuing our estimates we offered discounts in the amount of $20,562.00. Discounts are equivalent to almost 6% of total billings. As far as Island Rigging Invoices -- on July 16 we emailed Anna and explained that if Boscoe ordered any additional parts from Island Rigging that they would be billed directly to LSJ. If you withhold the final payment from Island Rigging, this will be coming out of our pocket as we told them to bill you directly -- we didn't want to have to mark anything up to cover Gross Receipts. When the vessel arrived we advised that LSJ hire a certified marine surveyor to inspect the vessel and issue a report with all findings. This did not happen until work was 99% complete. The vessel, not having been properly maintained, required many additional fittings, brackets, clamps, etc. Some of these were not visible to naked eye until work was underway. In regard to the engines, Subbase Drydock was not part of the process of ordering the engines for Big N. You received long block engines, and many components had to be switched over from the existing engines. There were fundamental issues about rotation for components of the hydraulic system and SBDD also advised LSJ about the steering pump that was not part of the quoted work. In addition, the sending units were incorrect and the starter motor was inoperable. And, as I mentioned on the phone this morning, we went above and beyond the work quoted in many instances - bulkhead replacement, plate work and many additional fittings for the water cooling system. We also installed shaft logs and repaired couplings that were not quoted. The additional billing of $3k is time and material for additional work - but it is only a fraction of the additional work that went into the vessel. We appreciate your business, but we do feel that we have been more than fair in our dealing and in our billing. We have been in business in this location for 34 years and we always stand behind our work. We await your response. Thank you, Gene Kral Sr. Subbase Drydock, Inc. Parcel 162. Subbase St. TI TEL: FAX: www.su ase ry oc coin EFTA00689690

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainjeevacatio4egmail.com

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.