From: BMG
To: Jeffrey Epstein <[email protected]>
Subject: Fwd: Well E-7871-S Costs and Options
Date: Fri, 10 Aug 2012 23:31:39 +0000
FYI
Sent from my iPhone
Begin forwarded message:
From: Casey Cook -4
Date: August 10, 2012 5:04:07 PM GMT-04:00
To: brice gordon
Subject: Well E-7871-S Costs and Options
Brice G.;
As we have discussed, the borehole now being drilled at Zorro Ranch under permit E-7871-S has not
shown substantial fluid loss that would indicate a fractured productive zone, as was observed with
Well B drilling in 2005. Drilling with mud, however, masks the cumulative input of small yield zones
that may provide many gpm over the planned screen interval of 400 feet. We discussed the option of
abandoning and redrilling the hole in a different location, but the current hole would need to be
abandoned per OSE specifications. I met with Bill Whaley and Ronnie Dennison of HGS this
morning to discuss the available options and costs. Below are some cost figures provided by to me
Bill W. for your consideration.
Drilling the current bore hole to total depth (800 ft) will cost $40,000, including the mobilization and
installed surface casing (these costs are already committed). The cost of abandoning the hole in
accordance with OSE regulations is $15,000 to $20,000. Total cost if the hole is abandoned is then
$55,000 to 60,000.
The original plan was to build an 8-inch well, which would cost another $45,000 in addition to the
committed drill cost of $40,000 (or a total of $95,000). The driller (Bill W.) indicates he can construct
a less-expensive six-inch PVC well for another $26,000, in addition to the committed $40,000,
including pea-gravel formation stabilizer, annular seal and grout to surface (or a total of $66,000).
Well development and testing will add $12,000 to the drillers cost, regardless of well diameter. Thus,
total cost to build a six-inch well is $66,000 + $12,000 = $78,000.
The 6-inch well will cost about $20,000 more than abandonment but gives you a well that can be
tested for yield. Without building the well, it will remain unknown how much this hole could produce.
EFTA00692814
If the well produces enough water to meet the 25% PBU requirement (15 to 20 gpm), you can equip
it with the appropriately sized pump and start producing.
If the well turns out to be a poor producer, you may be able to re-permit it as a stock well or a
permanent monitoring well. Moving over and re-drilling at a new site (say closer to Well B) may
require new permitting; Frank Bond may be able to advise on the proper permit to move over and try
again. One route may be to drill under an exploratory permit, then, if the yield is good, change the
exploratory well to E-7871-S.
My recommendation is to determine what the current hole produces; in a borehole drilled with mud,
the only way to determine yield is to construct the well. Constructing the well with six-inch casing
appears to be a reasonable option. There is no guarantee that yields will be comparable to existing
Ranch wells B and 4. Please call with any questions you may have or if you wish to discuss this in
further detail.
Casey W. Cook, P.E.
Balleau Groundwater, Inc.
901 Rio Grande Blvd. NW
Suite F-242
Albu uer ue NM 87104
fax
EFTA00692815
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01682184
186p
DOJ Data Set 10OtherUnknown
EFTA01370863
1p
Dept. of JusticeOtherUnknown
Medical Record/Clinical Encounter: DOJ-OGR-00026334
This clinical encounter document from the Bureau of Prisons details a medical evaluation of Jeffrey Epstein on July 12, 2019. It covers his medical history, current complaints, and treatment, including discussions around his triglyceride levels, sleep apnea, and back pain. The document was generated by the treating physician at the Metropolitan Correctional Center in New York.
1p
DOJ Data Set 8CorrespondenceUnknown
EFTA00014087
0p
DOJ Data Set 11OtherUnknown
EFTA02367961
1p
DOJ Data Set 10OtherUnknown
EFTA01977826
2p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.