Skip to main content
Skip to content
Case File
efta-efta00724703DOJ Data Set 9Other

Andrew Levy- Design Assistant

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00724703
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Andrew Levy- Design Assistant 19 Pinecliff Road Chappaqua, NY. 10514 Hasan-Uddin Khan 143 Concord Avenue Lexington, Massachusetts 02421, USA Project Title: LSJ Time Sheet #3 3/3/09 - 3/25/09 Week 8 Date Description Hours 3/3/09 Meeting, create scheme 11 plan 4 3/4/09 Meeting, scheme 11 massing, roof plan 5 3/5/09 finish scheme, Send, prepare drawing sets, 6 3/6/09- 3/9/09 Site analysis on location 8 Weekly Total 23 Week 9 Date Description Hours 3/10/09 Meeting, gather info, organize site photos 5 3/11/09 Meeting, begin scheme 12, Massing study with photos 6 3/12/09 Meeting with Bradford Associates + develop site scheme 8 3/13/09- scheme 12 plan with site, scheme 12 level 0, new vestibules 8 Weekly Total 27 EFTA00724703 Week 10 Date Description Hours 3/16/O9 Create sections -NS, EW, study proportions, study grade levels 6 3/17/09 scheme 12 plan, (bedroom, changing, level 0) 6 3/18/09 scheme 12 Plan, site levels, view axis, look at entry 8 3/19/09 Massing model with new graded contours, adjust plan 8 3/20/09 Coordinate and finalize drawing, send email package 8 Weekly Total 36 Week 11 Date Description Hours 3/23/09 Meeting, new plan, new massing 8 3/24/09 Meeting w/ Bradford assoc.+ continue plan/massing 8 3/25/09 plan, massing, coordinate site plan with BA- Send 8 Weekly Total 24 Total Hours 110 EFTA00724704

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.