Case File
efta-efta00724803DOJ Data Set 9OtherAgenda visit 5/6/10 (DRAFT)
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00724803
Pages
2
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Agenda visit 5/6/10 (DRAFT)
Master suite
1. Shower/steam design
2. white tassos in steam/shower
a.white glass in dressing room
cost $ 55,000 5 months lead time plus install and shop drawing time
b.Tassos in dressing room
cost $ 30,000 2 months delivered and installed
3.tub and room design
4.arch openings between bed and bath
5.wood flooring design, coral gone on dressing room floor
6.treatment of bedroom walls
7.door review?
8.tv location
Library
courtyard design
Kitchen
1.interior design
2.COLUMN DECISION
Cottages
1. Door approval
2. Shower decision
a.fully enclosed stone and tiled, seems to tight to me
b.collum plus roof and screen seems right
3.Abram gave us direction on elect. how about TV?data ect.
4.design for vanities to replace pedestal sinks and any change to bath rooms(currently none in budget)
Site
1.review wall progress
EFTA00724803
2.Get everyone thinking about walk from kitchen to master to library
Gensler
CZM Dejongh
Jeffrey last time we didn't get to tiki, pool pavilion, kite house, entry, plaza, theater and indoor pool with
Robert and you together
EFTA00724804
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.