Skip to main content
Skip to content
Case File
efta-efta00728708DOJ Data Set 9Other

Epstein Residence

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00728708
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Epstein Residence New Generator Budget for Construction 1/20/2009 Generator Work Budget Amount Supervision & General Conditions S 3,500 Worth Builders Proj. Mgmt. Fee 1,000 Structural Engineering & Geotechnical Work 2,200 Electrical Engineering & Architects Work 4,000 Electrical Work, Equipment & Machinery 68,000 Garage Floor/Driveway Cutting & Repairs 3,000 Generator Foundation & Mounting Slab 3,200 Screen Walls (if needed) MC Removal & Replacement of Landscaping NIC Contingency for unknowns 3,000 Plumbing Work for New Gas Line 3,500 Subtotal 91.400 Permits 2,742 Contractor's Overhead and Profit @10% 11,297 General Liability Insurance @1% 1.054 Budget Total $ 106,493 Notes: 1. Owner is responsible for ARCOM Approval costs, if not a staff approval 2. Owner is responsible for meter costs, if gas meter needs to be upgraded in size 3 Screen walls around the generator on 3 sides may be required by Code Local architect to determine this & help with ARCOM approvals 4. This is a Time and Material Budget--Cost plus 10%+1% This not a Guaranteed Maximum Contract Proposal. 5. Energy Efficient Electric Proposal is attached for your information & review. ' d Lipeag wted sJapting q4Jom e9b:L.0 CO SI 4414 EFTA00728708

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.