Case File
efta-efta00728708DOJ Data Set 9OtherEpstein Residence
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00728708
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Epstein Residence
New Generator Budget for Construction
1/20/2009
Generator Work
Budget Amount
Supervision & General Conditions
S
3,500
Worth Builders Proj. Mgmt. Fee
1,000
Structural Engineering & Geotechnical Work
2,200
Electrical Engineering & Architects Work
4,000
Electrical Work, Equipment & Machinery
68,000
Garage Floor/Driveway Cutting & Repairs
3,000
Generator Foundation & Mounting Slab
3,200
Screen Walls (if needed)
MC
Removal & Replacement of Landscaping
NIC
Contingency for unknowns
3,000
Plumbing Work for New Gas Line
3,500
Subtotal
91.400
Permits
2,742
Contractor's Overhead and Profit @10%
11,297
General Liability Insurance @1%
1.054
Budget Total
$
106,493
Notes:
1. Owner is responsible for ARCOM Approval costs, if not a staff approval
2. Owner is responsible for meter costs, if gas meter needs to be upgraded in size
3 Screen walls around the generator on 3 sides may be required by Code
Local architect to determine this & help with ARCOM approvals
4. This is a Time and Material Budget--Cost plus 10%+1%
This not a Guaranteed Maximum Contract Proposal.
5. Energy Efficient Electric Proposal is attached for your information & review.
' d
Lipeag wted sJapting q4Jom
e9b:L.0 CO SI 4414
EFTA00728708
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.