Jeffrey,
The following proposal is based on Gensler schematic drawings dated 2/26/09.
A revised Budget will be issued after the Design Development Plans are submitted by the
Architects and again after the Construction Documents are submitted,
The attached schedule shows the critical path of information & construction in red. A new
Schedule will be submitted with each new Budget.
General Conditions
$135,400.00
Sitework
$599,900.00
Concrete
$3,026,120.00
Masonry
$590,000.00
Metals
$392,410.00
Wood
$770,000.00
Moisture / Thermal
$523,930.00
Doors and Windows
$615,320.00
Finishes
$882,000.00
Specialties
$44,500.00
Special Equipment
$754,000.00
Furnishings
$0.00
Special Construction
$350,000.00
Mechanical
$1,100,000.00
Electrical
$725,000.00
$10,508,580.00
EFTA00731173
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.