Skip to main content
Skip to content
Case File
efta-efta00731173DOJ Data Set 9Other

Jeffrey,

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00731173
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Jeffrey, The following proposal is based on Gensler schematic drawings dated 2/26/09. A revised Budget will be issued after the Design Development Plans are submitted by the Architects and again after the Construction Documents are submitted, The attached schedule shows the critical path of information & construction in red. A new Schedule will be submitted with each new Budget. General Conditions $135,400.00 Sitework $599,900.00 Concrete $3,026,120.00 Masonry $590,000.00 Metals $392,410.00 Wood $770,000.00 Moisture / Thermal $523,930.00 Doors and Windows $615,320.00 Finishes $882,000.00 Specialties $44,500.00 Special Equipment $754,000.00 Furnishings $0.00 Special Construction $350,000.00 Mechanical $1,100,000.00 Electrical $725,000.00 $10,508,580.00 EFTA00731173

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.