Skip to main content
Skip to content
Case File
efta-efta00731669DOJ Data Set 9Other

TiId Hut Roof Replacement

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00731669
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
TiId Hut Roof Replacement Initial Budget Gary : Date: JEE: Date: ,aExtic $53,620.00 Total 18 Au 2010 Grou Phase Pean-90. 2tt Via Price $hippinq 01 Direct Expenses 01-045 Cut & Patch 80 hrs $20.00 $0.00 $0.00 $1,600.00 01-522 Temporary Enclosures/Safety 1 tot $500.00 $0.00 $0.00 $500.00 01-610 Material Handling 40 hrs $25.00 $0.00 $0.00 $1,000.00 01.624 Construction Cleaning 16 hrs $20.00 $0.00 $0.00 $320.00 01.645 Expendables 1 tot $500.00 $0.00 $0.00 $500.00 01-665 Equipment Operation 24 hrs $25.00 $0.00 $0.00 $600.00 01-900 Misc. EY:I:tenses 1 tot $500.00 $0.00 $0.00 $500.00 Division Total $5,020.00 02 Sltework 02-050 Demolition 80 hrs $20.00 $0.00 $0.00 $1,600.00 02-150 Shoring / Staging 1 tot $5,000.001 $0.00 $0.00 $5,000.00 02-200 Walls I Pads 1 tot $2,000.00 $0.00 $0.00 $2,000.00 Division Total $8,600.00 06 Wood 06-050 Fasteners 1 tot $1,500.00 $0.00 $0.00 $1,500.00 Division Total $1,500.00 07 Moisture / Thermal 07-412 Roofing Assembly 2000 sft $10.00 $0.001 $0.00 $20.000.00 Division Total $20,000.00 09 Finishes 09-510 Bamboo Ceilings 2000 sft $3.00 $0.00 $0.00 $6.000.00 09-920 Painting 1 tot $2,500.00 $0.00 $0.00 $2,500.00 Division Total $8,500.00 16 Electrical 16-000 Electrical Complete 1 tot $10,000.00 $0.00 $0.00 $10,000.00 Division Total $10,000.00 Total $53,620.00 Page toil EFTA00731669

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.