Skip to main content
Skip to content
Case File
efta-efta00766539DOJ Data Set 9Other

From: Stephen Caplinger

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00766539
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Stephen Caplinger To: Jeffrey Epstein <[email protected]> Cc: Gary Kerney Subject: Fwd: LSJ Date: Sat, 26 Dec 2009 15:31:01 +0000 >, Forwarded message From: Stephen Caplinger < Date: Sat, Dec 26, 2009 at 8:45 AM Subject: LSJ Jeffrey: It greatly concerns me that you are disappointed so I wanted to address your concerns. In regard to the Office Pavilion entry landscaaping, We proceeded to construction only because we felt that we had you approval. I felt that we had your approval and go ahead after we submitted the final design plans which were based on several preliminary concept plan submittals. You even made the comment that we don't need to show you the plans again and we should consider it approved for construction. I want to assure you that I would never proceed to construction on anything without first having your approval. On the Kite House, I know you like to see photo overlay sketches, but all we've done is conceptual floor plans & site plans. As soon as I can I'll prepare additional photo sketches for your review on the exterior views & orientation. Going forward, I want to make absolutely sure that you are happy with what we are doing and that you feel that we've given you enough design information to make decisions. I would hope that we we will be able to walk through with you the various designs when we are together with Gary on LSJ. I believe that we can better communicate in person and on site. In the future, I will strive to give you better design concepts that are on photo overlays and to send hard copiesin addition to email attachements. I plan on being back on LSJ during the week of 1/4/10 - 1/8/10 so we should definitely get together to walk through all of the landscape issues so that I am totally clear on your vision. I don't have any doubt that we can produce your vision on the island, I just feel we have a communication issue. Meanwhile, I am working on the Coastal Zone Management application package for the Kite House Pool, Wood Deck, Fire Pit, ATV Garage and the Tennis Court. We also plan on discussing the Boat Dock House but this is more of a Corps of Engineers issue. All of the designs in the CZM submittal can be revised later. Please call me if you have any comments or questions and I look forward to seeing you. Ste hen M. Ca linger Ste Then M. Caplinger EFTA00766539

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.