Case File
efta-efta00775455DOJ Data Set 9OtherFrom: "Stephen Caplinger" <I
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00775455
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: "Stephen Caplinger" <I
To: "'Gary Kemey"'
Cc: <1
>, "'Jeffrey Epstein" <[email protected]>
Subject: FW: Revised Master Budget
Date: Fri, 05 Jun 2009 21:38:29 +0000
Attachments: master suite_06-05-09_final_Sheettpdf; master suite_06-05-09final_Master Suite.pdf
Inline-Images: image00 1 .jpg
Gary:
See below from Jeffrey
STEPHEN M. CAPLINGER
Vice President Design & Planning
LANDMARK LAND COMPANY
4908 Brooksview Circle
New Albany, Ohio 43054
From: Jeffrey Epstein [mailto:[email protected]]
Sent: Friday, June 05, 2009 5:31 PM
To: Stephen Caplinger
Subject: Fwd: Revised Master Budget
can you send this on to gary
Forwarded message
From: curtis
Date: Fri, Jun 5, 2009 at 5:22 PM
Subject: Revised Master Budget
To: JEE <[email protected]>, Brice Gordon <1
>, Darren Indyke
k's
EFTA00775455
Jeffrey - as per your request I did the entire Master bedroom budget from scratch with new take
offs.
• I specified as much as I could based on the existing brands of plumbing and lighting
equipment.
• I used all LSJ labor including Gary for the electrician and Brian for the plumber - Glidden
agreed to sign off on Gary's work, I have not got a professional to sign off for the plumbing
as of yet.
• Gensler has not reviewed the HVAC system I specified with Dave Gott, but I'm confident
that their specifications will not be much different.
• Gensler has not specified the roof yet and I am not entirely sure theirs will be equivalent,
the one specified in this budget is based on the Office Pavilion, which in my opinion was
over designed.
• The paint finish is a simple in house job and does not account for a Pinto or designer look.
No paint in the bedroom because this requires some designer repairs.
• All stone floors and walls are Coral stone.
• Existing bedroom floor to remain but I have allowed for refinishing.
• All lighting and switching in the Bedroom will remain as is.
• I HAVE NO SHIPPING included in this budget, I did not have time to run it all past Emad,
which I will do next week.
Curtis
EFTA00775456
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Wire Ref
refinishingRelated Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01587459
0p
DOJ Data Set 11OtherUnknown
EFTA02684129
1p
DOJ Data Set 10OtherUnknown
EFTA01587323
11p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01587323
0p
DOJ Data Set 11OtherUnknown
EFTA02442868
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01455226
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.