Case File
efta-efta00794893DOJ Data Set 9OtherPARK PARTNERS
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00794893
Pages
9
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
PARK PARTNERS
320 EAST 82 ST I NEW YORK I NY
October 18, 2016
Dear Partner,
I hope this email finds you well.
Please find below a summary of all that is happening at 320 East 82 Street: The Park Mansion
1. Under the advice of our professionals, we ripped up the many layers of floor and poured
new concrete so that the new floor will sit evenly on the concrete and not be subject to
the vagaries of 100 years of settlement.
2. We have started the internal framing of each unit.
3. We have a completion date of March 31, 2016.
4. We decided to change our marketing effort to start on January 15th in order to achieve
the maximum impact of the launch. In this market, potential buyers have to see units as
finished as possible.
5. Upon removal of the wall coverings, we discovered that our 100-year-old building
required significant repairs, which have since been completed.
6. The new subway will open on December 24, 2016 with an entrance one block north of
us on 83rd Street and Second Avenue
7. Please find enclosed a selection of photographs of the work that is being done, as well
as the three-week look ahead schedule.
In summary, the initial budget for the renovation has been upsized to allow for the repair of the
building, new concrete floors, and the accelerated delivery schedule. A new budget will be sent
out next week.
Thank you so much for your trust and confidence,
David J. Mitchell
801 Madison Avenue New York NY 10065
(T
EFTA00794893
TRACK 8c METAL STUD
NEW POURED
CONCRETE FLOOR
EFTA00794894
NEW BUILD OF 6th FLOOR
EFTA00794895
CELLAR PLUMBING
EFTA00794896
PAGE I OF 3
THREE-WEEK LOOK AHEAD SCHEDULE
CONTRACT No.: 320 E 82nd Street
PROJECT: Park Mansions
DESCRIPTION OF ITEM
MON
10117
TUE
10116
WED
10119
THU
10720
FRI
10721
SAT
10722
SUN
10723
MON
1024
TUE
10125
WED
10126
THU
10127
FRI
10126
SAT
10129
SUN
10/30
MON
1031
TUE
11/1
WED
1112
THU
1113
FRI
1114
SAT
11/5
SUN
11/8
FRAMING LAYOUT
I
2
3
a
5
6
CLEAN AND CLEAR ALL SUEIFLOCRING
x
RECEIVE REVISED ARCHITECTURAL DRAWINGS
X
*STALL TRACK
%
X
X
X
X
X
X
X
*STALL SluOS AT wET wAu.S AND THEMOR FRATANG 2-5
X
X
X
X
X
X
X
X
I
I
MON
TUE
WED
THU
FRI
SAT
SUN
MON
TUE
WED
TMJ
FRI
SAT
SUN MON
TUE
WED
THU
FRI
SAT
SUN
DEMO OF MN FLOOR ROOF AT BuLICHEADS • CHANGE ORDER
10117 10116 10119 10720 10721 10722 10723 10/24 10125 10/26 1027 10/26 10/29 10/30 10731
1111
112
1113
1114
11/5
1115
FIMSHOEMCUTION OF ROOF SLAB AND CUT OUT STRUCTURAL STEEL
X
X
NSTALL NEW OA) FOR CHANGES TO 6 TNFLOOR ROOFING
X
X
X
X
X
7 PREP WALLS FOR STEEL • EMBED WARM PLATES
X
a
9
ID
11
IT
13
IS
15
16
IT
is
IT
20
21
22
23
MON
TUE
WED
THU
FRI
SAT
SUN
MON
TUE
WED
THU
FRI
SAT
SUN MON
TUE
WED
THU
FRI
SAT
SUN
DEMO OF REAR EXTENSION -CHANGE ORDER 1
10/17 10/16 10/19 1020 10721 10722 10723 10124 10125 10126 10127 10128 10129 10/30 10/31
1111
1112
1113
1114
11/5
11/6
LAYOUT TEAT, PROTECTION win, ARSENAL
X
START REMOVALS AT ROOF DECK
X
X
RECENE MK APPROVAL FRCM 335E 81ST ST MANAGERS
X
X
NSTRL ARSENAL PROTECnvE MEASURES
X
X
X
X
DEMO OF REAR EXTENSION • CHANGE ORDER t
X
X
X
X
X
X
X
X
X
X
X
X
I
I
MON
TUE
WED
THU
FRI
SAT
SUN
MON
TUE
WED
TMJ
FRI
SAT
SUN MON
TUE
WED
THU
FRI
SAT
SUN
MASONRY
10/17 10/16 10/19 10720 10721 10722 10723 1024 10125 10/26 1027 10/26 10/29 10130 10131
1111
1112
1113
1114
11/5
1115
INSTALL LINTFSS AND IISILL CUSTOM SIZED WINDOWS Cm EASTERN FACADE
X
X
X
%
REPC0ITING OF PARAPET
X
X
X
BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING • MOVE ELEVATOR CONTROL 1ST
X
BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING -MOVE ELEVATOR CONTROL 1ST
X
CMV INSTALL FOR TRASH CHUTE LOAD BEARING
X
X
X
X
X
X
X
X
X
X
I
I
MON
TUE
WED
THU
FRI
SAT
SUN MON
TUE
WED
TMJ
FRI
SAT
SUN MON
TUE
WED
THU
FRI
SAT
SUN
INSTALL STRUCTURAL STEEL
10/17 10/16 10/19 10720 1021 1022 1023 10124 10125 10126 10127 10126 10129 10/30 10/31
11/1
1112
1113
11/4
11/5
11/6
INSTALL ADDITIONAL wORK AT 44S2o2 MR PLATE
X
X
X
RECEIVE APPROVED SHOP DRAWINGS
X
ORDER STEEL
X
FABRICATE STEEL
X
X
X
X
X
X
X
X
X
X
X
X
X
START INSTALLATION OF STRUCTURAL STEEL
X
X
PLACE CONCRETE AT METAL DECK IN REAR EXTENSION
X
I
I
MON
TUE
WED
THU
FRI
SAT
SUN
MON
TUE
WED
174U
FRI
SAT
SUN MON
TUE
WED
THU
FRI
SAT
SUN
a
25
26
27
2S
29
53
HVAC MET LAYOUT
10/17 10/16 10/19 10720 10721 10722 1023 10/24 10e25 1026 10e27 10e26 10/29 10/30 10731
1111
1112
1113
1114
11/5
11/6
MEETING WITH AOR FOR MECHANICAL DESIGN MID LAYOUT DUCT SIZE APPROVAL
X
LAYOUT ONSITE MID CRAFTING
X
SUBMIT DUCTWORK SHOP DRAWINGS FOR RECORD
X
APPROVED SHOP DRAWINGS
DUCT FABRICATION
X
X
X
X
X
X
X
X
NSTALL OuCTwORK
X
X
X
X
X
X
X
X
X
X
NSTALL TEMP HEAT
X
X
X
X
31
32
33
I
I
MON
TUE
WED
THU
FRI
SAT
SUN MON
TUE
WED
TMJ
FRI
SAT
SUN MON
TUE
WED
THU
FRI
SAT
SUN
PLuMEING
10/17 10/16 10/19 10720 10721 10722 10723 1024 10/25 lens 1027 1026 1029 Iwo 10(31
1111
1112
1113
11/4
11/5
1115
COMPLETE CELLAR uADERGROum) PIPING
%
K
K
K
%
SPECIAL ROUGH IPIDER3ROI.AvD INSPECTION
X
CORE DRILLING AND RuNNNG vERnCAL STACKS THROuGHOR
X
X
X
X
X
X
X
X
X
X
34 HORIZONTAL BRANCH ROUGH NS
X
I
I
MON
TUE
WED
THU
FRI
SAT
SUN
MON
TUE
WED
THU
FRI
SAT
SUN IRON
TUE
WED
THU
FRI
SAT
SUN
EFTA00794897
PAGE 1 OF 3
THREE-WEEK LOOK AHEAD SCHEDULE
CONTRACT No.: 320 E 82nd Street
PROJECT: Park Mansions
DESCRIPTION OF ITEM
MON
1WI7
TUE
10118
WED
10/19
THU
10/20
FRI
10/21
SAT
10/22
SUN
10/23
MON
10/24
TUE
10425
WED
10/26
TliU
10e27
FRI
10128
SAT
10/29
SUN
10/30
MON
10/31
TUE
1111
WED
1112
THU
1113
FRI
11/4
SAT
11/5
SUN
111E
35
36
37
33
39
ELECTRiCAL
1WI7 10118 10/19 10/20 10/21 10/22 10/23 10/24 10/25 10/26 10e27 10128 10/29 10/30 10/31
1111
1112
1113
1114
11/5
111E
RELOCATE ELEVATOR MACHINE CONTROL ROOM AS PER DRAWINGS
X
X
FRONDE POWER FOR TE1A, NEAT
X
X
I
I
MON
TUE
WED
THU
FRI
SAT
SUN
MON
TUE
WED
THU
FRI
SAT
SUN MON
TUE
WED
THU
FRI
SAT
SUN
SPRINKLER
10/17 10/18 10/19 10/20 10+21 1022 10/23 10424 10/25 1026 10/27 1028 10/29 10430 10131
1111
1112
1113
1_1/4
11/5
WC
PROvOE REVISED DRAWINGS FOR TOM LOOP FOR WINTERIZED SITE
X
SUBMIT NCOFOR THE ELEvATM Cf THE SHUT OFF VALVES AT THE RGERS
X
RELOCATE TEMP LOOP AND SHUT OFF VALVES
X
X
X
X
X
X
X
X
EFTA00794898
PAGE 2 OF 3
THREE-WEEK LOOK AHEAD HOLD POINTS & PRECEDING OCCASIONS
CONTRACT No.: 320 E 82nd Street
PROJECT: Park Mansions
ITEM
DESCRIPTION OF ITEM
SHIFT
TIME
REA Oi:
WORK)
COMMENTS / HOLD POINTS
DEPENDENCIES
FRAMING LAYOUT
AOR
RECEIVE REVISED ARCHITECTURAL DRAWINGS
STEEL DELIVERY OF PLATES
SIGNED NEIGHBOR AGREEMENT FOR 81ST ST
TEMP PROTECTION IN PLACE
1
CLEAN AND CLEAR ALL SUBFLOORING
2
RECEIVE REVISED ARCHITECTURAL DRAWINGS
3
INSTALL TRACK
4
INSTALL STUDS AT WET WALLS AND INTERIOR FRAMING 2-5
DEMO OF 6TH FLOOR ROOF AT BULKHEADS - CHANGE ORDER
5
FINISH DEMOLITION OF ROOF SLAB AND CUT OUT STRUCTURAL STEEL
6
INSTALL NEW CMU FOR CHANGES TO 6TH FLOOR ROOFING
7
PREP WALLS FOR STEEL - EMBED BEARING PLATES
DEMO OF REAR EXTENSION - CHANGE ORDER 1
8
LAYOUT TEMP PROTECTION WITH ARSENAL
9
START REMOVALS AT ROOF DECK
10
RECEIVE FINAL APPROVAL FROM 335 E 81ST ST MANAGERS
11
INSTALL ARSENAL PROTECTIVE MEASURES
12
DEMO OF REAR EXTENSION - CHANGE ORDER 1
MASONRY
13
INSTALL LINTELS AND INFILL CUSTOM SIZED WINDOWS ON EASTERN FAQADE
14
REPOINTING OF PARAPET
15
BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING - MOVE ELEVATOR CONTROL 1ST
16
BREAK FLOOR AT BASEMENT FOR TRASH CHUTE FOOTING - MOVE ELEVATOR CONTROL 1ST
17
CMU INSTALL FOR TRASH CHUTE LOAD BEARING
EFTA00794899
INSTALL STRUCTURAL STEEL
PAGE 2 OF 3
18
INSTALL ADDITIONAL WORK AT 41S202 BENT PLATE
19
RECEIVE APPROVED SHOP DRAWINGS
20
ORDER STEEL
21
FABRICATE STEEL
22
START INSTALLATION OF STRUCTURAL STEEL
23
PLACE CONCRETE AT METAL DECK IN REAR EXTENSION
HVAC DUCT LAYOUT
24
MEETING WITH AOR FOR MECHANICAL DESIGN AND LAYOUT DUCT SIZE APPROVAL
25
LAYOUT ONSITE AND DRAFTING
AOR APPROVAL OF LAYOUT
26
SUBMIT DUCTWORK SHOP DRAWINGS FOR RECORD
27
APPROVED SHOP DRAWINGS
28
DUCT FABRICATION
AOR APPROVAL OF LAYOUT
29
INSTALL DUCTWORK
30
INSTALL TEMP HEAT
PLUMBING
31
COMPLETE CELLAR UNDERGROUND PIPING
AOR APPROVAL OF LAYOUT
32
SPECIAL ROUGH UNDERGROUND INSPECTION
33
CORE DRILLING AND RUNNING VERTICAL STACKS THROUGHOUT
34
HORIZONTAL BRANCH ROUGH INS
ELECTRICAL
35
RELOCATE ELEVATOR MACHINE CONTROL ROOM AS PER DRAWINGS
ELEVATOR COMPANY SCOPE APPROVED
36
PROVIDE POWER FOR TEMP HEAT
SPRINKLER
PROVIDE REVISED DRAWINGS FOR TEMP LOOP FOR WINTERIZED SITE
SUBMIT RCO FOR THE ELEVATING OF THE SHUT OFF VALVES AT THE RISERS
RELOCATE TEMP LOOP AND SHUT OFF VALVES
EFTA00794900
PAGE 3 OF 3
THREE-WEEK LOOK AHEAD SCHEDULE
CONTRACT No.: 320 E 82nd Street
PROJECT: Park Mansions
Prepared By: rafirSty 23K11727-O11
pm 5v.iatmio
17-Oct
Reviewed & Accepted By:
JIM SALADINO
17-Oct
Project Manager
EFTA00794901
Technical Artifacts (4)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
+21 1022 10Phone
720 1021Phone
722 1023Phone
723 1024Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.