Case File
efta-efta00795782DOJ Data Set 9Other9 NATIONAL OILWELL VARCO
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00795782
Pages
62
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
9 NATIONAL OILWELL VARCO
Reciprocating
Plunger Pumps
Installation, Care and
Operation Manual
103Q-3
110Q-3
Covering the
following pumps:
59T-3
103Q-3
110Q-3
Print
Index i
Sales r Technical Information
USA Tol!free: I (800) 324 4706
Phone: 1 (918)447 4600
Fax: 1 (91 81 44 7 4677
Internet:
M. Box 4638
Houston, Texas 77210-4638
REVISED: September 2, 2010
ISSUE: September 26, 2005
EFTA00795782
KW
NATIONAL OILWELL VARCO
SUPPLEMENT FOR
ALL PUMP MANUALS
A! WARNING !A
PRESSURE
RELIEF
VALVES
AI NOTICE I A
Our technical publications relative to
reciprocating pumps state that pressure
relief valves must be installed in the
discharge systems from these units.
This supplement is issued to emphasize
the importance of relieving the discharge
system of all pressure which exceeds the
rated working pressure applied by the
manufacturer to the specific pistons and
liners (or plungers and packing) in any
particular unit.
•Print4
Some I
Index I
Next I
EFTA00795783
A! WARNING ! A
For the protection of persons and property the discharge system from each Reciprocating Pump must be
equipped with a device which relieves the system of all pressures which exceed the pressure rating applied
by the manufacturer to each particular piston or plunger diameter. Allowances will be made for pressure
surges which are inherent with the reciprocating action of piston and plunger pumps. The percentage of
pressure allowance appears later in this publication and in the "Standards of the Hydraulic Institute" (131h
edition).
The relieving device must provide for instantaneous pressure relief, it may be a valve designed for automatic
or manual resetting; however, if preferred, rupture discs or burst discs may be installed.
FAILURE to comply with the procedures outlined in the Warning may result in damage to the pump and
related equipment and more importantly may cause serious bodily injury or death!
THE PRESSURE RELIEF VALVE:
1.
This valve must be a full opening type.
2. It must have a working pressure rating, equal
to or greater than, the maximum working
pressure of the pump.
3.
The through capacity of the valve, when fully
opened, must be sufficient to relieve the full
capacity of the pump without excessive
overpressure.
RUPTURE DISC OR BURST DISC:
1.
These discs must have a diameter which is
not less than the pipe size of the pressure
relief flange.
2.
These discs must have a rupture or burst
pressure rating consistent with the
specifications tabulated later in this
publication.
LOCATION OF THE RELIEF VALVE:
1.
The relief valve must be placed in the
discharge line as close as possible to the
pump fluid end or it may be mounted on the
pump discharge manifold.
2.
The relief valve must be on the pump side of
any discharge strainer.
SUGGESTED SET PRESSURES
PUMP TYPE:
Double Acting - Duplex
Double Acting - Triplex
Double Acting - Quintuplex
Single Acting — Triplex
Single Acting — Simplex
Single Acting — Duplex
Single Acting — Triplex
Single Acting — Quintuplex
Single Acting — Septuplex
Note: The above set pressures are to be observed when installing rupture discs or burst discs.
3.
The relief valve must be between the pump
fluid end and any valve in the discharge
system.
4.
There must be no restricting device(s)
between the relief valve and the pump fluid
end.
THE RELIEF VALVE DISCHARGE LINE:
1.
The relief valve discharge line should not
terminate in the pump suction line.
2.
The line should terminate in the supply tank,
if possible.
3.
The line must be securely anchored.
4.
The line must be the same pipe size as, or
may be larger than, the discharge connection
on the relief valve.
5. If the line is of great length, this must be
taken into consideration in sizing the relief
valve.
6.
There must be no restrictions or valves in the
relief valve discharge line.
NOTE: Follow the foregoing instructions if
rupture discs or burst discs are installed.
FOR THE PUMP RELIEF VALVES:
OPERATING PUMP PRESSURE:
Piston Pressure Rating - Plus 25%
Piston Pressure Rating - Plus 10%
Piston Pressure Rating - Plus 10%
Piston Pressure Rating - Plus 10%
Plunger Pressure Rating - Plus 25%
Plunger Pressure Rating - Plus 20%
Plunger Pressure Rating - Plus 10%
Plunger Pressure Rating - Plus 10%
Plunger Pressure Rating - Plus 10%
Print
Home
Index
Next I
EFTA00795784
Installation, Care and Operation
Manual
Foreword...
e NATIONAL OILWELL VARCO
This manual is published as a guide for the normal operation of your NATIONAL OILWELL VARCO equipment.
Because of the many factors, which contribute to the function or malfunction of this machinery, and not having complete
knowledge of each factor or combination of factors, we cannot detail all facets of this subject. We must therefore confine the
scope of this presentation and when situations encountered are not fully encompassed by complete, understandable
instructions. these situations must be referred to the manufacturer.
When other than routine servicing is necessary, it can be most efficiently performed if the unit is removed to an area of
adequate space where an over-head crane, hydraulic lift, bearing pullers, impact tools, etc., are accessible.
The dimension and tolerances specified in this publication are those desirable for the most efficient operations of the
equipment. When components become worn or when new parts are introduced into a worn unit, it may not be possible or
economically feasible to reestablish such strict alignment and correct all dimensional deviations.
Improvements in design, engineering, materials, production methods, etc., may necessitate changes in these products
and result in inconsistencies between the content of this publication and the physical equipment. We reserve the right to
make these changes without incurring any liability or obligation beyond that which is stipulated in the purchase contract.
The pictures. photographs, charts, diagrams, drawings. verbal contents and specifications are not to be construed as
giving rise to any warranty on the part of NATIONAL OILWELL VARCO. National Oilwell Varco makes no warranty, either
expressed or implied beyond that which is stipulated in the purchase contract.
NATIONAL OILWELL VARCO pumps are manufactured by National Oilwell Varco at the Tulsa, Oklahoma plant. The
serial number, assigned each pump is stamped on the power end. Please refer to this serial number when ordering parts for
the pump.
The right and left sides of the pump are determined by viewing the pump from the back of the power end, looking toward
the fluid end. This position is also used to identify the plungers and their related parts as being number one, two and three,
beginning at the left side of the pump.
A! CAUTION! CAUTION! CAUTION!A
EXERCISE SAFETY IN ALL PERFORMANCES: DO NOT IGNORE ANY WARNINGS; USE ONLY APPROVED
METHODS, MATERIALS AND TOOLS.
DO NOT PERMIT ANY FUNCTION OF QUESTIONABLE SAFETY;
ACCIDENTS ARE CAUSED BY UNSAFE ACTS AND UNSAFE CONDITIONS. SAFETY IS YOUR BUSINESS AND
YOU ARE INVOLVED.
A! WARNING! WARNING! WARNING! A
BEFORE PERFORMING ANY SERVICE FUNCTION, BE CERTAIN THAT THE UNIT IS SEPARATED FROM ITS
POWER SOURCE OR THAT THE POWER SOURCE IS LOCKED-OUT TO PREVENT ANY FORM OF ENERGY
FROM ENTERING THE EQUIPMENT. THIS WOULD INCLUDE ELECTRICAL OR MECHANICAL ENERGY INTO OR
FROM THE PRIME MOVER(S), PNEUMATIC ENERGY FROM THE COMPRESSOR/AIR SYSTEM. ETC.
Print
j
Home
2
Index
I
Next
e NATIONAL OILWELL VARCO
EFTA00795785
NATIONAL OILWELL VARCO
Installation, Care and Operation
Manual
A! WARNING ! WARNING ! WARNING !A
FAILURE TO OBSERVE THE WARNINGS AND NOTES OF CAUTION IN THIS PUBLICATION CAN RESULT IN
PROPERTY DAMAGE. SERIOUS BODILY INJURY. OR DEATH.
A! ATTENTION - NOTICE - IMPORTANT !A
THESE TERMS ARE USED TO DRAW ATTENTION TO ACTION THAT WILL CAUSE DAMAGE TO THE PUMP.
COMPONENTS OR ATTACHMENTS.
A! ATTENTION !A
PUMP NOMENCLATURE:
ALL PUMP SIZES WITHIN THIS MANUAL WILL BE DESCRIBED WITH THE NEW OR CURRENT NOMENCLATURE.
THE OLD PUMP NOMENCLATURES DESCRIBED ON THE FRONT COVER, BUT NOT INCLUDED IN THIS MANUAL
EXCEPT AS NEEDED, ARE TO BE UNDERSTOOD AS BEING INCLUDED WITH THE NEW NOMENCLATURES.
A! WARNING ! WARNING ! WARNING !A
BEFORE SERVICING PUMPS:
1. SHUT DOWN OR DISENGAGE THE PUMP POWER SOURCE.
2. SHUT DOWN ALL PUMP ACCESSORY EQUIPMENT.
3. RELIEVE OR "BLEED OFF" ALL PRESSURE FROM THE PUMP FLUID CYLINDER(S).
FAILURE TO SHUT DOWN POWER AND RELIEVE PRESSURE FROM THE PUMP BEFORE SERVICING CAN
RESULT IN SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE.
Print
Home
3
Index
Next
it NATIONAL OILWELL VARCO
EFTA00795786
Installation, Care and Operation
Manual
Plunger Pump Nomenclature Example....
59 T-3 M F
RATED INPUT
HORSEPOWER
T = TRIPLEX
= QUINTUPLEX
e NATIONAL OILWELL VARCO
F - FLANGED
L = LOW PRESSURE
M = MEDIUM. H = HIGH
STROKE LENGTH (IN.)
*NOMENCLATURE MAY BE SHORTENED IN PARTS LISTS OR OTHER
INSTANCES TO LEAVE OFF THE MATERIAL, VALVE TYPE, ETC. THIS FULL
NOMENCLATURE
DESCRIPTION
IS
GIVEN
FOR
INFORMATIONAL
PURPOSES.
Print
I
Home
4
Index I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795787
NATIONAL OILWELL VARCO
Table of Contents...
INSTALLATION
PAGE
I. GENERAL
A. Suction Line
8
B. Discharge Line
8-9
C. Power End
9
D. Fluid End
9
E. Plunger Packing
10
F. Plunger Packing Lubrication
10
G. Suction Pulsation Dampener
1. Low Pressure - Plastic Body
10
2. High Pressure - Aluminum Body
11
Installation, Care and Operation
Manual
LUBRICATION
I. GENERAL
A. Oil
12
OPERATION
I. GENERAL
A. Operation Check List
13
MAINTENANCE
I. GENERAL
A. Daily Maintenance
14
B. Monthly Maintenance
14
C. Storage
15
D. Start-Up After Storage
15
II. TROUBLE SHOOTING GUIDE
16-18
OVERHAUL AND REPAIR
I. GENERAL
A. Tools Required
19
B. Check Points and Adjustments
1. 59T-3
19
2. 103O-3
19
3. 59T-3, 103Q-3. 110O-3
19-20
Print
1
Home)
5
Next
e NATIONAL OILWELL VARCO
EFTA00795788
Installation, Care and Operation
Manual
Table of Contents (continued)...
DISASSEMBLY
PAGE
I. POWER END
A. Plunger/Intermediate Rods and Oil Wiper Retainers
21
B. Crankshaft Assembly
59T-3
21-22
103O-3,110O-3
22
C. Crankshaft Bearings (All Pumps)
22-23
D. Lubrication Oil Pump (110Q-3)
24-25
E. Integral Gear Reducer
26
e NATIONAL OILWELL VARCO
II. FLUID END
A. Fluid Cylinder Removal
All Pumps
26
B. Plunger Removal
All Pumps
27
C. Stuffing Box Removal
27
D. Fluid End Valve Removal
27
ASSEMBLY
I. POWER END
A. Connecting Rod and Crosshead Assembly
59T-3, 103O-3
28
110O-3
29
B. Crankshaft Main Bearings and Center Support Bearings
59T-3
30-31
10343,1100-3
31-32
C. Connecting Rod to Crankshaft Assembly
All Pumps
33
D. Intermediate Rods and Oil Seal Retainers
All Pumps
33
II. FLUID END
A. Stuffing Boxes and Plungers
All Pumps
34
B. Power End/Fluid end Adapters
All Pumps
35
C. Fluid Cylinders
All Pumps
35
D. Fluid Valves —Tapered Seat
All Pumps
35
E. Piping Installation
All Pumps
35
F. Plunger Packing Installation
1. 838 Packing
36-37
2. Braided Packing
38-39
3. 1068-4 Spring Loaded Packing
40-41
rr Print
Home I
6
Next I
e NATIONAL OILWELL VARCO
EFTA00795789
e
NATIONAL OILWELL VARCO
Table of Contents (Continued)...
PLUNGER PUMP VALVES
PAGE
I. OPERATIONAL MAINTENANCE
A. Suction and discharge
42
B. Valve Covers
42
C. Valve Cover Seals
42
D. Valve Springs
42
E. Valve and Seat
42
II. TAPERED SEAT VALVES
A. Severe Duty Valve
1. Nomenclature
43
2. Valve Removal Procedure
44
3. Valve Inspection Procedure
45-46
4. Valve Installation Procedure
46-47
B. Disc Style Valve
1. Nomenclature
48
2. Valve Removal Procedure
49
3. Valve Inspection Procedure
50
4. Valve Installation Procedure
50-51
C. Spherical Valve
1. Nomenclature
52
2. Valve Removal Procedure
53
3. Valve Inspection Procedure
53
4. Valve Installation Procedure
54-55
D. Spherical Valve — Severe Duty
1. Nomenclature
56
2. Valve Removal Procedure
57
3. Valve Inspection Procedure
57-58
4. Valve Installation Procedure
58
P-55U LUBRICATOR
I. PUMP OPERATING INSTRUCTIONS
A. Operating Instructions
59
1. Box Suction Pumps
59
2. Flow Rate Adjustment
59
3. Sight Glass
59
4. Overfilling of Sight Glass
59
5. Reservoir Oil Level
59
6. Pump Displacement
59
Installation, Care and Operation
Manual
Revisions effective September 2, 2010 - replaced the word multiplex with reciprocating.
Print
Home
7
Next
e NATIONAL OILWELL VARCO
EFTA00795790
Installation, Care and Operation
Manual
Installation...
I. GENERAL
e NATIONAL OILWELL VARCO
Careful planning of the plant layout will save considerable time and expense, both initially when the installation is made
and later during the operation of the plant. In selecting the location for the pump, consideration should be given to the fact
that a positive suction head at the pump inlet contributes toward the pump efficiency. However, the layouts of the piping, the
arrangement of the fittings, and restrictions in the suction and discharge lines have even more effect. For this reason, all
fittings and valves should be full opening; all bends should be of long radius or should be eliminated where possible. Long
radius 45° ells should be used, particularly if installed near the fluid cylinder. The following points outline the basic
requirements for an installation that will contribute greatly toward good pump operation.
A. SUCTION LINE
1. The suction line must not be smaller than the suction intake of the fluid cylinder and may be larger. The length of
the suction line should be held to a minimum and should run straight from the supply tank to the pump.
2. When bends are required, they should be made with long radius 45° ells. Do not use a bend directly adjacent to the
fluid cylinder. Avoid using any 90° bends if at all possible.
3. Provide a full opening gate valve in the suction line adjacent to the supply tank to permit the line to be drained when
necessary. Do not use any type of restricting valve.
4. Do not use meters or other restrictions in the suction line. Eliminate any rise or summit in the suction line where air
or vapor can collect.
5. Pulsation dampening devices are strongly recommended.
6. When necessary to manifold a number of pumps to a common suction, the diameter of the manifold and suction
pipe leading from the supply tank must be such that it has a cross-sectional area equal to, or greater, than the area
of the combined individual suction pipes.
7. When a charging or booster pump is used in the suction line, it must have a capacity equal to twice that of the pump
output. This is necessary to provide a charging pump with an output great enough to meet the peak volume
requirements of the plunger pump during the suction stroke and not act as a restriction in the line.
8. All piping, both suction and discharge must be solidly and independently supported. The first support must be as
close to the pump as practical. This is necessary to prevent placing the pump in a strain and to keep any vibration in
the system from acting directly on the pump.
B. DISCHARGE LINE
1. Use a pulsation dampener or a desurger in the discharge line. It should be placed in the line as near the fluid
cylinder as possible and ahead of any bend in the line.
2. Do not reduce the size of the discharge line below that of the pump outlet until the line has passed through the
desurger, and is away from the pump approximately 20 feet (6m).
3. Any bend in the discharge line should be made with a long radius 45° ell. Do not use a bend directly adjacent to the
fluid cylinder, particularly a 90° bend.
Print
Home I
8
Index
I
Next
I
de NATIONAL OILWELL VARCO
EFTA00795791
S NATIONAL OILWELL VARCO
Installation...
I. GENERAL
B. DISCHARGE LINE (Continued)...
Installation, Care and Operation
Manual
4. A pressure relief valve should be installed in the discharge line. The relief valve should be set to operate at a
pressure no greater than 25% above the maximum rated pressure for the plunger size being used. It should be
installed in the line ahead of any valve and be piped so that any flow is returned to the supply tank rather than the
suction line. This will prevent possible damage to the suction line and suction dampener.
5. A by-pass line should be installed to permit the pump to be started without load. This allows oil to circulate and
reach all parts in the power end before they are loaded.
C. POWER END
1. The pump must be mounted level and should be grouted in and be free of strain. This applies to a skid-mounted
pump or a pump mounted directly on a concrete base.
2. The sheave of a belt driven pump must be correctly aligned with the prime mover sheave. Care must be used to
prevent over-tightening as this will shorten belt life, place the pump in a strain, and cause undue additional loads on
the crankshaft and bearings. Sheave sizes should not be smaller than the minimum approved diameter.
3. When connecting a direct-driven pump, the shafts must be correctly aligned. Couplings should not be expected to
compensate for avoidable misalignment. With Thomas Flexible Couplings, angular misalignment should not exceed
one-half degree. Offset misalignment of the centerlines of the two shafts should not exceed .015" (.381 mm).
Actually, misalignment should be as small as practical.
4. Provision should be made to stop the pump automatically in the event of supply fluid failure. A pump should not be
run dry, as this causes wear on the packing.
5. Adequate plunger chamber drains have been provided in the pump and should not be plugged. Drain lines should
never be reduced in size from the connection provided.
6. The pump has been drained of oil after testing at the factory and MUST be filled with the proper oil (see page 12)
before starting. The rust inhibiting oil coating inside the power end need not be removed before filling; however, it is
recommended that the power end be checked to make sure dirt or contamination has not entered during shipment.
D. FLUID END
1. The fluid cylinder is shipped assembled to the pump complete with valves and cover plates. The stuffing boxes,
plungers, and related items have also been assembled and tested with the pump (unless otherwise specified) and
require no further assembly. Before the pump is started, these parts should be checked for tightness as well as for
possible damage during shipment.
2. Thoroughly clean the suction line piping before starting the pump. Weld spatter, slag, mill scale, etc., will damage a
pump in a short time.
Print
Home I
9
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795792
Installation, Care and Operation
Manual
Installation...
I. GENERAL (Continued)...
E. PLUNGER PACKING
e NATIONAL OILWELL VARCO
The recommended style of packing has been installed and run at the plant. It does, however, require further "setting up"
as the pump is started and brought up to pressure. Refer to pages 36 through 41 for correct procedure for packing used.
F. PLUNGER PACKING LUBRICATION
1. Automatic packing lubricators are beneficial on all installations and are required on pumps operating at high
pressure (1200 psi [85kg/cm 2] and up) to obtain good packing life.
2. When an automatic lubricator is used in water and power oil service, use Rock Drill (Air Drill) oil of proper viscosity.
For butane-propane service, use NATURAL castor oil. Set lubricator to feed 5 to 7 drops per minute.
G. SUCTION PULSATION DAMPENERS
1. Low Pressure - Plastic Body
a. Some National Oilwell Varco plunger pumps are equipped with suction pulsation dampeners. These dampeners
do an excellent job when properly charged and should be kept filled during operation.
A! ATTENTION ! A
At suction pressures over 10 psi (.7kg/cm2), the dampener should be deflated prior to bleeding off the suction pressure to
prevent damage to the diaphragm.
b. The plastic dampener body has an instruction decal attached, which lists the following installation and charging
procedures.
A! ATTENTION ! A
HANDLE WITH CARE. This is a plastic part and can be broken.
c. Tighten capscrews with 10 to 12ft-lbs. of torque.
A! ATTENTION ! A
Use thread-sealing compound on check valve and tighten until snug. OVERTIGHTENING WILL DAMAGE BODY.
d. With pump operating - Charge dampener until bottom of diaphragm is visible through sight glass. Proper charge
is when bottom of diaphragm is between center and top of sight glass.
Print
Home
10
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795793
S NATIONAL OILWELL VARCO
Installation...
I. GENERAL
G. SUCTION PULSATION DAMPENERS (Continued)...
2. High Pressure - Aluminum Body
Installation, Care and Operation
Manual
a. In pressures in excess of 20 psi (1.406 kg/cm?) and up to 70 psi (10.545 kg/cm2), it is necessary to use the
National Oilwell Varco high-pressure suction dampener.
b. The high-pressure dampener is charged in a similar manner to the low-pressure plastic dampener, using air or
nitrogen to charge the diaphragm and maintain its position in relation to the sight glass.
c. The following procedures should be used to service this dampener:
(1) The dampener is fitted to an adapter that may be either welded into an existing line or be a part of a
separate dampener housing. Place a gasket on each side of the diaphragm retaining plate and place on
the adapter.
(2) The dampener spacer is then placed on top of the retainer plate with the grooved side up and the flat side
against the retainer gasket.
(3) The diaphragm fits into the groove on the spacer with the curved portion of the diaphragm above the spacer.
(4) Apply a continuous 1/8" diameter bead of silicone rubber on the outer edge of the diaphragm after it has
been positioned into the spacer. This silicone rubber (GE Silicone Rubber or Dow-Corning Silastic) is
readily available at most hardware stores. Assemble the body cover within ten minutes after applying the
silicone rubber.
(5) Fit the dampener cover over the diaphragm and assemble the capscrews. Tighten these capscrews evenly
to approximate 80 ft-lbs. of torque.
(6) Install the sight glasses, one in each side of the cover. Be sure to seat the sight glass packing carefully into
the groove on the cover, as this must be an airtight connection.
(7) The air check valve has a pipe thread and must be made up into the cover airtight. Use a good pipe thread
sealant to promote sealing.
Print
I
Home I
11
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795794
Installation, Care and Operation
Manual
Lubrication...
I. GENERAL
•
NATIONAL OILWELL VARCO
NATIONAL OILWELL VARCO models 591-3 and 103O-3 reciprocating pumps are "splash" lubricated. The main
bearings and crankshaft bearings are fed by splash. Crossheads and crosshead pin bushings are fed through holes in the
crossheads and crosshead reservoir. Intermediate rods are lubricated from the splash they receive from the crosshead.
NATIONAL OILWELL VARCO model 110Q-3 reciprocating pump is pressure lubricated via a small gear pump direct
driven by the crankshaft. The gear pump provides oil to the crankshaft, connecting rod bearings and crosshead pin
bushings. The main bearings and crossheads are splash lubricated from the main oil reservoir and crosshead oil reservoir.
A. OIL
Use "extreme pressure" gear oil.
The chart below shows the recommended grades for various temperatures
surrounding the pump.
U.S. UNITS OF MEASURE
Temperature
+50°F to +155°F
+20°F to +100°F
-20°F to + 60°F
AGMA Industrial EP Gear Oil
AGMA No. 6 EP or ASTM/ISO Grade No. 320 (viscosity 1335 to 1632 SSU 100°F)
AGMA No. 5 EP or ASTM/ISO Grade No. 220 (viscosity 918 to 1122 SSU 100°F)
AGMA No. 2 EP or ASTM/ISO Grade No. 68 (viscosity 284 to 347 SSU 100°F)
Crankcase Capacity - Quarts:
59T-3 - 10
103Q-3 - 20
110O-3 - 20
METRIC UNITS OF MEASURE
Temperature
i
+10°C to +68°C
AGMA Industrial Gear Oil
AGMA No. 6 EP or ASTM/ISO Grade No. 320 (Viscosity 228-352 cSt at 37.8°C)
AGMA No. 5 EP or ASTM/ISO Grade No. 220 (Viscosity 198-242 cSt at 37.8°C)
-29°C to +16°C I AGMA No. 2 EP or ASTM/ISO Grade No. 68 (Viscosity 61-75 cSt at 37.8°C)
Crankcase Capacity - Liters:
591-3 — 9.5
103Q-3 - 18.9
110Q-3 — 18.9
Oil must pour freely at minimum operating temperature. Change oil every six months or as frequently as operating
conditions require maintaining a clean, sludge-free oil of proper viscosity.
Print
I
Home I
12
Index
I
Next
I
•
NATIONAL OILWELL VARCO
-7°C to +38°C
EFTA00795795
NATIONAL OILWELL VARCO
Operation...
I. GENERAL
Installation, Care and Operation
Manual
A! ATTENTION !A
THE FOLLOWING POINTS SHOULD BE CHECKED FOR THE PREVENTION OF TROUBLE OR TO CORRECT
TROUBLE THAT MAY ARISE.
A. OPERATION CHECKLIST
1. Pump must be a set level for proper lubrication.
2. Make sure pump is filled with clean oil of the proper viscosity (see page 12).
3. Do not over-speed the pump.
4. Do not use a smaller diameter sheave than is recommended for the pump.
5. Make sure all safety shutdown switches are operating properly.
6. Keep all suction and discharge line valves fully open.
7. If a bypass is used to regulate output, make sure it is set properly.
8. Make sure the pressure relief valve is set properly.
9. Do not exceed the pressure rating of the pump for the particular plunger size.
10. Make sure the suction line is tight, as air entering the suction line will cause severe hammering and knocking of the
pump.
11. Make sure plunger and intermediate rod connections are tight and locked.
12. Check the plunger packing for correct adjustment (see pages 36 to 41).
13. Check the suction and discharge dampeners for proper charge, as this is very important for long life and good pump
operation.
14. Make sure the hex nuts holding the cylinder in place are tight.
Print
Home I
13
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795796
Installation, Care and Operation
Manual
•
NATIONAL OILWELL VARCO
Maintenance...
I. GENERAL
The following points are intended as a guide to be used in setting up a maintenance program. Good preventive
maintenance will pay big dividends in the form of reliable service with a minimum of trouble.
A. DAILY MAINTENANCE
1. Check power end oil level daily. Do not attempt to check the oil with the pump running. Inspect the oil for dirt or
contamination and change if necessary. An increase in oil level indicates fluid end leakage into power end. Change
oil immediately and check intermediate rod wipers and surface smoothness of rod. Check for plunger packing
leakage.
2. Lubricate plunger packing frequently. Packing life can be greatly increased by greasing every four (4) hours with a
small amount of grease. Grease is not recommended at pressures above 1200 psi. Use an alternate packing
lubricator to drip the proper oil on the plunger for lubrication. (See page 10 for further details).
3. Check lubricator for proper level and operation.
4. Check plunger packing for excessive leakage. Replace packing as required.
5. Check stuffing box adjusting nuts for tightness.
6. Drain plunger leakage sump tanks if required.
7. Flush plunger chamber drain lines with kerosene on power oil pumps and fresh water on salt pumps. This may be
done weekly unless salt and paraffin accumulation is severe.
8. Make sure suction and discharge line valves are fully open.
9. Check for leakage between the fluid cylinder and frame or stuffing box to fluid cylinder packing if required.
10. Check all seals for leakage.
11. Check belts or clutch for slippage. If either condition exists, correct immediately.
B. MONTHLY MAINTENANCE
1. Drain and refill crankcase every six (6) months or as often as required to maintain a clean, sludge-free oil of the
proper viscosity.
2. Clean crankcase air breather with a non-explosive solvent.
3. Check all studs, nuts and capscrews for tightness. Inspect gaskets for leaks; tighten or replace as required.
4.
Clean pump. Good housekeeping is a prerequisite to good maintenance.
Print
Home
14
Index
I
Next
I
•
NATIONAL OILWELL VARCO
EFTA00795797
t
NATIONAL OILWELL VARCO
Maintenance...
Installation, Care and Operation
Manual
I. GENERAL (Continued)...
C. STORAGE
If the pump is to be idle for longer than one (1) week, it should be prepared for storage as follows:
1. Drain and clean crankcase thoroughly. Leave drain open and install 90° elbow, pointing downward, to permit air
circulation and prevent condensation build-up.
2. Coat all bearings, finished surfaces. and entire inside surface of crankcase with a rust inhibiting oil.
3. Remove plungers and packing, clean and coat with rust inhibiting oil.
4. Remove fluid cylinder valves allowing cylinder to be thoroughly cleaned and drained.
5. Coat entire cylinder, valves and parts, with a rust inhibiting oil.
6. Thoroughly inspect pump and rotate crankcase once each month. Re-coat with rust inhibiting oil where necessary.
D. START-UP AFTER STORAGE
Any pump that has been in storage, either after field use or as shipped from the plant, will need a thorough inspection to
make sure it has not been damaged in any way and that all parts are properly in place.
A! ATTENTION !A
FAILURE TO OBSERVE THE FOLLOWING POINTS CAN RESULT IN SERIOUS DAMAGE.
1. Remove all covers on both power end and fluid end; thoroughly clean and inspect all parts and finished surfaces.
2. Check all bearings to make sure they are clean and in good condition.
3. Make sure valves, plungers and packing are properly installed and in good condition.
4. Carefully tighten all bolts, nuts, studs and working connections.
5. Fill power end to the proper level with clean oil of the proper viscosity. Make sure oil is poured into the crosshead
reservoir and is worked into all bearings.
6. Fill packing lubricator and pump lines full. Check by breaking connection at stuffing box, working lubricator plunger
until oil appears.
Print
Home I
15
Index
I
Next
I
S NATIONAL OILWELL VARCO
EFTA00795798
Installation, Care and Operation
Manual
Maintenance (Continued)...
II. TROUBLE SHOOTING GUIDE
e NATIONAL OILWELL VARCO
PROBLEM
POSSIBLE CAUSE
CORRECTION
KNOCKING OR
POUNDING IN FLUID
END AND PIPING
SUCTION LINE RESTRICTED BY:
(1,2,3,4)
1. TRASH, SCALE BUILD UP, ETC.
LOCATE AND REMOVE
2. PARTIALLY CLOSED VALVE IN SUCTION
LINE
LOCATE AND CORRECT
3. METERS, FILTERS, CHECK VALVES,
NON-FULL-OPENING, CUT-OFF VALVE OR
OTHER RESTRICTIONS.
RE-WORK SUCTION LINE TO ELIMINATE
4. SHARP 90° BENDS OR 902 BLIND TEES.
RE-WORK SUCTION LINE TO ELIMINATE.
AIR ENTERING SUCTION LINE THROUGH
CUT-OFF VALVE
TIGHTEN OR REPACK VALVE STEM PACKING
AIR ENTERING SUCTION LINE THROUGH
LOOSE CONNECTION OR FAULTY PIPE
LOCATE AND CORRECT
AIR OR VAPOR TRAPPED IN SUCTION LINE
LOCATE RISE OR TRAP AND CORRECT BY
STRAIGHTENING LINE, PROVIDING ENOUGH
SLOPE TO PERMIT ESCAPE AND PREVENT BUILD-
UP
LOW FLUID LEVEL
INCREASE SUPPLY AND INSTALL AUTOMATIC LOW
LEVEL SHUT-DOWN SWITCH
SUCTION DAMPENER NOT OPERATING
INSPECT AND REPAIR AS REQUIRED
WORN VALVES
INSPECT AND REPAIR AS REQUIRED
ENTRAINED GAS IN FLUID
PROVIDE GAS BOOT OR SCRUBBER FOR FLUID
POOR INLET AND OUTLET ARRANGEMENT
AT SUPPLY TANK
INLET TO BE AT TOP OF TANK AND BAFFLED TO
BREAKOUT GAS AND PREVENT CHANNELING.
OUTLET TO BE 12" FROM BOTTOM OF TANK AND
AS FAR FROM INLET AS POSSIBLE, NEVER
CLOSER THAN 902.
LOOSE PACKING ADJUSTING NUT
TIGHTEN AND/OR REPLACE PACKING
INADEQUATE SIZED SUCTION LINE
REPLACE WITH INDIVIDUAL SUCTION LINE OF
NEXT SIZE LARGER THAN INLET PUMP
LEAKAGE PRESSURE RELIEF VALVE THAT
HAS BEEN PIPED BACK INTO SUCTION LINE
REPAIR VALVE AND RE-WORK PIPING TO RETURN
TO SUPPLY TANK - NOT SUCTION LINE.
BY-PASS PIPED BACK TO SUCTION
REWORK TO RETURN BY-PASSED FLUID BACK TO
SUPPLY TANK - NOT SUPPLY LINE
BROKEN PLUNGER
INSPECT WHEN ROTATING PUMP BY HAND AND
REPLACE AS REQUIRED
Print
Home
16
Index
I
Next
NATIONAL OILWELL VARCO
EFTA00795799
t
NATIONAL OILWELL VARCO
Maintenance...
II. TROUBLE SHOOTING GUIDE (Continued)...
Installation, Care and Operation
Manual
PROBLEM
POSSIBLE CAUSE
CORRECTION
VALVE WEAR OR DAMAGE
CHECK FLUID END FOR BAD VALVES
WORN MAIN BEARINGS
REPLACE AS REQUIRED
LOOSE PLUNGER - INTERMEDIATE ROD
INSPECT FOR DAMAGE - REPLACE AS
KNOCK IN POWER END
CROSSHEAD CONNECTION
REQUIRED AND TIGHTEN
RAPID VALVE WEAR OR
FAILURE
SHORT PACKING LIFE
Print
WORN CROSSHEAD PIN, OR
CONNECTING ROD
LOCATE AND REPLACE AS REQUIRED
CORROSION
TREAT FLUID AS REQUIRED
ABRASIVES IN FLUID
FILTER AS REQUIRED
IMPROPER INSTALLATION
INSPECT AND INSTALL PER INSTRUCTION
SHEET IN PACKING BOX
IMPROPER LUBRICATION (EITHER
INSUFFICIENT OR EXCESSIVE OR
INCORRECT TYPE)
LUBRICATOR NOT OPERATING
CHECK INSTRUCTIONS IN MANUAL AND
CORRECT AS REQUIRED.
INSPECT AND CORRECT AS REQUIRED
ADJUSTING NUT LOOSE
INSPECT AND REPACK PER INSTRUCTIONS
SCALE OR BUILD UP ON PLUNGER
TREAT FLUID AS REQUIRED
WORN OR PITTED PLUNGERS AND/OR
STUFFING BOX
REPLACE AS REQUIRED
ABRASIVES IN FLUID
FILTER AS REQUIRED
PUMP OPERATED WITHOUT FLUID
CHECK SYSTEM FOR FAULTY LOW-LEVEL
SHUTDOWN CONTROLS OR CLOSED VALVES
AND CORRECT AS REQUIRED.
ABNORMALLY HIGH FLUID
TEMPERATURES
CHECK WITH MANUFACTURER FOR
RECOMMENDATIONS ON TYPE OF PACKING
WRONG TYPE OF PACKING FOR
PARTICULAR FLUID BEING HANDLED
CHECK WITH MANUFACTURER FOR
RECOMMENDATIONS ON TYPE OF PACKING
CAVITATION (KNOCKING AND
POUNDING IN FLUID CYLINDER AND
PIPING)
REFER TO CORRECTION OF "KNOCK IN
POWER END" ABOVE
Home I
17
Index
I
Next
•
NATIONAL OILWELL VARCO
EFTA00795800
Installation, Care and Operation
Manual
Maintenance...
II. TROUBLE SHOOTING GUIDE (Continued)...
e NATIONAL OILWELL VARCO
PROBLEM
POSSIBLE CAUSE
CORRECTION
BROKEN OR PITTED
FROM IMPLOSIONS
CAUSED BY IN
EXCESSIVE GAS OR
AIR ENTRAINED
FLUID.
PLUNGER CRACKED AT INSTALLATION.
INSTALL NEW PLUNGER USING CARE TO AVOID
ANY SHARP BLOW OR FORCE ON PLUNGER.
PLUNGER CRACKED FROM THERMAL
SHOCK.
CHECK SYSTEM TO ELIMINATE ANY SHARP OR
SUDDEN TEMPERATURE DIFFERENCES.
TEMPERATURE EXTREMES ON THE PLUNGER CAN
OCCUR FROM PACKING AS DISCUSSED UNDER
"SHORT PACKING LIFE" PROBLEM PR FROM
TEMPERATURE CHANGES IN THE FLUID ITSELF.
PLUNGER PITTED FROM IMPLOSIONS
CAUSED BNY EXCESSIVE GAS OR AIR
ENTRAINED IN FLUID.
CHANGE SUCTION SYSTEM TO ELIMINATE OR
CHECK WITH MANUF. REGARDING USE OF
SPECIAL PACKING ARRANGEMENT.
RAPID WEAR OF
HARD-COATED
PLUNGER
PACKING FAILURE.
CHECK AND CORRECT PER RECOMMENDATIONS
UNDER "SHORT PACKING LIFE" PROBLEM.
PLUNGER NOT SUITABLE FOR PARTICULAR
SERVICE.
CHECK WITH MANUF. FOR RECOMMENDATION.
OIL SEAL LEAKS
PLUNGER NOT SUITABLE FOR PARTICULAR
SERVICE.
CHECK AND CORRECT AS REQUIRED.
PUMP NOT LEVEL.
CHECK AND CORRECT AS REQUIRED.
WORN, CORRODED, PITTED, OR
OTHERWISE DAMAGED SEALING SURFACE. CHECK AND CORRECT AS REQUIRED.
WORN OR DAMAGED SEALS.
CHECK AND CORRECT AS REQUIRED.
OIL LEVEL TOO HIGH.
CHECK AND CORRECT AS REQUIRED.
Print
Home
18
Index
I
Next
4 NATIONAL OILWELL VARCO
EFTA00795801
S NATIONAL OILWELL VARCO
Overhaul and Repair...
I. GENERAL
Installation, Care and Operation
Manual
The bearings and other working parts in the power end have been designed for continuous duty, and if properly
lubricated, will provide years of trouble-free service. However, after the pump has been in service for a long period of time,
the bearings and other working parts will gradually loosen, and if not corrected, will lead to more serious trouble. The time to
overhaul the pump will vary; depending on the operating conditions, and is therefore a matter that must be left to the good
judgment of the operator. Complete disassembly and assembly procedures are discussed in their respective sections.
A. TOOLS REQUIRED
Most of the tools required to overhaul the pump will be found in an ordinary set of mechanics hand tools. The special
tools and equipment required and not furnished with the pump include a torque wrench, bearing puller, and a valve servicing
kit. Also, a hot oil bath capable of reaching a temperature of 300°F (149°C) will be needed.
B. CHECK POINTS AND ADJUSTMENTS
1. 59T-3:
The crankshaft main bearings are single row; shim adjusted, tapered roller bearings. They have been assembled
and adjusted at the factory with proper clearance and will give long trouble-free service. The proper clearance is found
by adjusting the amount of shims until the crankshaft has .003" to .005" endplay and will rotate freely.
2. 103O-3 and 110O-3:
The 103O-3 and 110Q-3 have two single rows, shim adjusted, tapered roller end bearings. They have been
assembled and adjusted at the factory with proper clearance and will give long trouble-free service. The proper end
clearance is found by adjusting the amount of shims until the crankshaft has .004" to .006" endplay and will rotate freely.
They also have two steel backed Babbitt center mains which are non adjustable. The center mains should have .008" to
.014" (.203 mm to .356 mm) total diametrical clearance. This is non adjustable.
3. 59T-3. 103Q-3 and 110Q-3:
a. The connecting rod shell bearings or inserts are precision made and adjustable by use of shims. Tolerances are
listed on the following page.
b. The normal clearance between the crosshead and crosshead bore is .00C (.102 mm) to .010" (.254 mm). The
maximum allowable clearance, including wear, is .016" (.406 mm).
c. The wrist pin bushings must be pressed into the connecting rods and reamed to size. The allowable clearance
between the pin and bushing is listed on the following page.
Print
I
Home I
19
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795802
Installation, Care and Operation
Manual
Overhaul and Repair...
I. GENERAL
B. CHECK POINTS AND ADJUSTMENTS (Continued)...
e NATIONAL OILWELL VARCO
PUMP
CRANKSHAFT PIN
MAXIMUM CLEARANCE
MINIMUM CLEARANCE
In
mm
In
mm
In
mm
59T-3
3.500
88.900
.005
.127
.003
.076
3.499
88.875
103Q-3
.005
3.500
88.900
.127
.003
.076
3.499
88.875
110Q-3
3500
88.900
.005
.127
.003
.076
3.499
88.875
CROSSHEAD PIN M.
MAXIMUM CLEARANCE
MINIMUM CLEARANCE
PUMP
In
mm
In
mm
In
mm
59T-3
1.7505
44.463
.002
.051
.001
.025
1.7500
44.450
103O-3
1.7505
44.463
.002
.051
.001
.025
1.7500
44.450
110O-3
1.7505
44.463
.002
.051
.001
.025
1.7500
44.450
PUMP
CRANKSHAFT CENTER
MAIN
In
mm
MAXIMUM CLEARANCE
ON DIAMETER
In
mm
MINIMUM CLEARANCE
ON DIAMETER
In
mm
103O-3
7.247
I 1$±1„M
110O-3
7.246
I 184.048
.014
.356
.010
.254
Print
Home_,
Index
20
Next
I
e NATIONAL OILWELL VARCO
EFTA00795803
NATIONAL OILWELL VARCO
Disassembly...
I. POWER END
Installation, Care and Operation
Manual
It is not necessary to remove the fluid end when disassembling the power end. However, the plungers should be
removed through the fluid end cylinder heads. The plungers and intermediate rods are one piece on 1-3/4" and larger
plungers. 1-5/r and smaller plungers have separate intermediate rods.
A! ATTENTION ! A
POWER END DISASSEMBLY AND OVERHAUL IS BEST PERFORMED IN A WELL EQUIPPED SHOP ENVIROMENT. IF
THE PUMP IS DISASSEMBLED AT LOCATION ENSURE THE PRESSURE HAS BEEN REMOVED FROM THE FLUID END
AND THE PUMP BLOCKED OUT WITH APPROPRIATE BLOCK VALVES. ENSURE THE FLUID END IS DRAINED AND
ANY POWER SOURCE OR DRIVER IS LOCKED OUT BEFORE PROCEEDING!
A. PLUNGER/INTERMEDIATE RODS AND OIL WIPER RETAINERS (ALL PUMPS)
1. Remove the fluid end cylinder head.
2. Loosen the packing gland nuts.
3. If the pump has intermediate rods a back-up wrench is required. The plunger and intermediate rod separate at the
knurl area interface. Using the back-up wrench break the plunger loose and unscrew from the intermediate rod.
Remove the plunger through the fluid cylinder opening.
4. Using a pipe wrench on the knurled area of the intermediate rod, remove it from the crosshead and power end.
5. If the pump does not have an intermediate rod, use a pipe wrench on the knurled area of the plunger and break it
loose from the crosshead. Unscrew and remove through the fluid cylinder opening.
6. Remove the two nuts holding the wiper box gland and remove the gland.
7. Slide the wiper box and seal assembly out of the power end.
B. CRANKSHAFT ASSEMBLY
• 591-3
1. Remove the rear power end crankcase cover.
2. Remove connecting rod bolts and cap.
NOTE: Connecting rods and caps are match marked and must be kept together. Do not mix caps and rods.
3. Connecting rod and crosshead must be moved all the way forward to clear crankshaft.
4. Remove crankshaft bearing retainers, seals, and shims. These parts should be tied together and marked for
reassembly at their original location. Thread bearing retainer capscrews into the two tapped holes of each bearing
retainer and use them to push the bearing retainers out of their bores.
Print
I
Home I
21
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795804
Installation, Care and Operation
Manual
Disassembly...
I. POWER END
B. CRANKSHAFT ASSEMBLY (Continued)...
•
NATIONAL OILWELL VARCO
! ATTENTION !
COVER KEYWAYS TO PROTECT OIL SEALS DURING REMOVAL.
5. Carefully remove the crankshaft out either side of the power frame. If reusing the end bearings remember, the
crankshaft end bearing cones and cups are matched sets. Do not mix cones and cups.
103O-3 & 1100-3
1. Remove the rear power end crankcase cover.
2. Remove connecting rod bolts and cap.
NOTE: Connecting rods and caps are match marked and must be kept together. Do not mix caps and rods.
3. Connecting rod and crosshead must be moved all the way forward to clear crankshaft.
5. Remove crankshaft bearing retainers, seals, and shims. These parts should be tied together and marked for
reassembly at their original location. Thread bearing retainer capscrews into the two tapped holes of each bearing
retainer and use them to push the bearing retainers out of their bores.
6. While supporting the crankshaft carefully remove it out either side of the power frame. If reusing the end bearings
remember, the crankshaft end bearing cones and cups are matched sets. Do not mix cones and cups.
C. CRANKSHAFT BEARINGS
• 59T-3, 103O-3 & 110O-3
The crankshaft main bearings may be inspected while on the crankshaft and should not be removed unless necessary. A
puller is required when replacement is necessary.
NOTE: Keep the component parts of the bearings together if they are to be re-installed. They are match marked and must
be correctly assembled as a unit.
103O-3 & 1100-3
The center main bearings on the quintuplex model pumps normally have from .008 to .014 inches total diametrical
clearance. When they require replacement a puller is necessary to remove them. Figure 1 shows a puller that can be made to
remove old bearings and install new ones.
Print
I
Home
22
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795805
NATIONAL OILWELL VARCO
Disassembly...
I. POWER END
C. CRANKSHAFT BEARINGS
• 103O-3 & 110O-3 (Continued)...
BEARING PULLER
SEE DETAIL FOR
PULLER DIMENSINS
1"•8 UNC
ALL THREAD
STUD X 20- LONG
1-1/Y THICK
STEEL PLATE
X 6.112" LONG
Print
I
1.500
Installation, Care and Operation
Manual
REMOVAL OF CENTER MAINS
-
6.000
-
- -
0.250
07.125
TURN
BEARING PULLER
DETAIL
Figure 1
Home I
23
CENTER MAIN
BEARING
POWER FRAME
01.125
THRU
•
07.875
TURN
Index
I
WRENCH
Next
S NATIONAL OILWELL VARCO
EFTA00795806
Installation, Care and Operation
Manual
Disassembly...
I. POWER END (Continued)...
D. LUBRICATION OIL PUMP
• 110O-3
•
NATIONAL OILWELL VARCO
The model 110O-3 has a lubrication pump that is an integral part of the power frame assembly. It is driven by a slotted shaft
which is driven via the crankshaft. It has its own strainer/filter, oil pressure gauge, and relief valve. The pump draws oil through
the strainer/filter located in the crankcase reservoir and discharges into the crankshaft, where it lubricates all connecting rod and
wrist pin bearings. See Figure 2.
rtANKSHAFT
BEARING
HOUSING 1
OIL PRESSUR:
[ RELIEF
VALVE
OIL PRESSUR
_
GUAGE
n SHIM GASKET('
f
OIL PUMP
r
DRIVE PIN
PRESSURE
_
ADJUSTING
SCREW
OIL PUMP
OIL PUMP
BUSHING
SUCTION
SPRING
-V±t 'PRr;
RELIEF
VALVE
Figure 2
CAI
c WASHER
— NUT
The lube oil pump may be removed by removing the six capscrews retaining the bearing housing. After removing the
capscrews, the complete unit may be slipped out. It is not necessary to disturb either the crankshaft or bearing housing.
The relief valve, located on top of the housing, is adjustable and prevents excessive lube pressure during cold starts. It is
adjusted at the factory for normal operating conditions. However, since operating conditions do vary, it may be necessary to
adjust after installation. Crankshaft speed, type of oil and oil temperature directly affect the oil operating pressure. To adjust the
oil pressure, operate pump until normal operating temperature is reached. Remove the cap and loosen the jam nut. Turn the
adjusting screw in or out until the desired pressure is reached. Retighten the jam nut and replace the cap. Under normal speeds
and temperatures the oil pressure should be adjusted somewhere between 30 and 40 psi. However, because of the variable
factors affecting the oil pressure the pump has been designed to operate safely from 15 psi or more.
Print
Home
24
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795807
NATIONAL OILWELL VARCO
Disassembly...
I. POWER END
D. LUBRICATION OIL PUMP (Continued)...
Installation, Care and Operation
Manual
Sometimes the drive side of the pump must be reversed. When swapping the drive from right hand to left hand or opposite.
care must be taken to correctly swap the lube side bearing housing and oil pump. The power frame is machined to be driven
from either the right or left side. In order to do this, the power frame is machined symmetrically. This means the port for the oil
suction must be plugged on the drive side to prevent oil leakage. When swapping drives, this plug must also change sides. See
Figure 3 for details of the plug and strainer/filter changes.
TRAINER/FI.
DRIVE SWAT-
n :A
Figure 3
When changing drive side, the lube side bearing housing, oil pump, oil strainer/filter and components from the lube side are
swapped to the drive side. The pipe plug, port plug, and 0 -ring from the drive side are switched to the opposite side. If the port
plug is not removed it will block the oil suction port and the pump will starve for oil when started. If the port plug is not installed on
the opposite side oil will leak from under the bearing housing.
Print
Home I
25
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795808
Installation, Care and Operation
Manual
Disassembly...
e NATIONAL OILWELL VARCO
I. POWER END (Continued)...
E. INTEGRAL GEAR REDUCER
The 59T-3. 103Q-3, and 110Q-3 may be purchased with an optional integral gear reducer. Because of the gear design
these are available in left hand drive only.
1. Drain oil from pump and gear reducer.
2. Remove the 1/2" capscrews around the outside of the gear case cover.
3. Using a support carefully remove the cover.
4. Remove the pinion shaft.
5. Remove the bolt and nut clamping the bull gear to the crankshaft.
6. Use a puller and sling to carefully remove the bull gear.
7. Remove the 5/8" capscrews that hold the gear case to the power frame.
8. Using a sling and jib crane, carefully remove the gear case.
II. FLUID END
A! ATTENTION !A
BEFORE WORKING ON THE FLUID END ENSURE THE PRESSURE HAS BEEN REMOVED FROM THE FLUID END AND
THE PUMP BLOCKED OUT WITH APPROPRIATE BLOCK VALVES. ENSURE THE FLUID END IS DRAINED AND ANY
POWER SOURCE OR DRIVER IS LOCKED OUT BEFORE PROCEEDING!
A. FLUID CYLINDER REMOVAL
• ALL PUMPS
1. Disconnect piping.
2. Remove the plungers as described below.
3. Remove the hex nuts holding the fluid end to the power end and slide cylinder forward until free.
Print
Home
26
Index
I
Next
I
4 NATIONAL OILWELL VARCO
EFTA00795809
NATIONAL OILWELL VARCO
Disassembly...
Installation, Care and Operation
Manual
II. FLUID END (Continued)...
B. PLUNGER REMOVAL
• ALL PUMPS
1. Remove the fluid end cylinder head.
2. Loosen the packing gland nuts.
3. Rotate the crankshaft until the knurl area of the plunger/intermediate rod is accessible in the cradle area of the
pump.
4. If the pump has intermediate rods a back-up wrench is required. The plunger and intermediate rod separate at the
knurl area interface. Using the back-up wrench break the plunger loose and unscrew from the intermediate rod.
Remove the plunger through the fluid cylinder opening.
5. If replacing the intermediate rod, use a pipe wrench on the knurled area of the intermediate rod and remove it from
the crosshead and power end.
6. If the pump does not have an intermediate rod, use a pipe wrench on the knurled area of the plunger and break it
loose from the crosshead. Unscrew and remove through the fluid cylinder opening.
C. STUFFING BOXES REMOVAL
• ALL PUMPS
Most pumps in this series have integral stuffing boxes. A few models do have separate stuffing boxes. On these pumps the
stuffing box is clamped between the fluid end body and the power frame. The fit on the fluid end side is a slip fit. The fit on the
power end side is a slight press. To remove the stuffing boxes follow this procedure.
1. Remove the plungers and fluid end as previously described.
2. Remove any lube fittings, etc.
3. Support the box with a lifting strap
4. Use a heavy brass bar and drive the box out of the power frame opening.
D. FLUID END VALVE REMOVAL
Refer to valve section of this manual.
Print
I
Home I
27
Index
I
Next
NOTIONAL OILWELL VARGO
EFTA00795810
Installation, Care and Operation
Manual
Assembly...
I. POWER END
A. CONNECTING ROD AND CROSSHEAD ASSEMBLY
• 59T-3 and 103O-3
e NATIONAL OILWELL VARCO
1. Press the crosshead pin bushing into the connecting rod.
2. Ream bushing to obtain the clearance listed on page 20. (If service bushings are used, reaming will not be necessary in
most cases).
3. Assembly the connecting rod to the crosshead by pressing the crosshead pin into the crosshead or to facilitate
assembly, the crosshead may be heated to no more than 300°F (149°C) in an electric oven or bath.
NOTE: Crossheads have an oil groove on the topside. Connecting rods and bearing caps are match marked as units.
The rod also has a lube hole on the topside. Install connecting rod in crosshead so the lube hole on the rod and the oil
groove on the crosshead correspond. The oil groove and lube hole go up when installing in the power frame.
See
Figure 4.
4. Lubricate the crosshead bore and slide the connecting rod crosshead assembly into the power frame. Push the
assemblies all the way forward.
CRANKSHAFT
SCREW
CONNECTING ROD
ROD CAP —1
Prince
LUb
MATCH MARS.
Home
SHELL BEARING
Figure 4
28
r -OIL GROG.
CROSSHE:
WRIST PIN
WRIST PIN
BUSHING
Index
I
Next
4 NATIONAL OILWELL VARCO
EFTA00795811
NATIONAL OILWELL VARCO
Assembly...
Installation, Care and Operation
Manual
I. POWER END
A. CONNECTING ROD AND CROSSHEAD ASSEMBLY (Continued)...
• 110O-3
1. Press the crosshead pin bushing into the connecting rod.
2. Ream bushing to obtain the clearance listed on page 20. (If service bushings are used, reaming will not be necessary in
most cases).
3. Assembly the connecting rod to the crosshead by pressing the crosshead pin into the crosshead or to facilitate
assembly, the crosshead may be heated to no more than 300°F (149°C) in an electric oven or bath.
NOTE: Crossheads have an oil groove on the topside. Connecting rods and bearing caps are match marked as units.
The rod also has a lube hole drilled through the main beam of the rod to allow pressurized oil to reach the wrist pin
bearing. Ensure this hole is free of dirt and trash. The oil groove on the crossheads go up when installing in the power
frame. See Figure 5.
5. Lubricate the crosshead bore and slide the connecting rod crosshead assembly into the power frame. Push the
assemblies all the way forward.
RANKSHAFT
CAP j
SCREW
Prim
INTERNAL LU:
ROD CAP
r-
MATCH MARK
CONNECTING P
(7-1r , I
RE..ARITIc
Figure 5
Home I
29
BUSH,Ny
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795812
Installation, Care and Operation
Manual
Assembly...
I. POWER END (Continued)...
B. CRANKSHAFT AND MAIN BEARINGS
• 59T-3
el NATIONAL OILWELL VARCO
1. Thoroughly clean and remove all burrs from the
of the cone and roller assembly and from the bearing seating
surfaces on the crankshaft.
2. Heat the cone and roller assembly in an electric oven or oil bath to 300°F (149°C). It is recommended that a
thermometer be used to prevent overheating.
3. After the bearings have been brought up to temperature and with the crankshaft firmly supported, install the cone and
roller assemblies on the crankshaft. Make sure the cone and roller assemblies are firmly against the shoulders on the
crankshaft.
4. Allow the crankshaft and bearing assembly to cool before installing in the power end.
5. Make sure the main bearing openings in the frame are clean and free of burrs.
NOTE: The crossheads and connecting rods must be installed prior to replacing the crankshaft assembly.
6. Install the crankshaft main bearing outer races or cups in the main bearing housing. These races can be carefully driven
into the housing with a brass rod. An alternative and easier way is to chill the races in a freezer or with CO2 and place
them in their respective bearing housings. Ensure the races are completely seated.
7. Place the crankcase main bearing shims, amounting to approximately .120" (3.05 mm) in thickness, on the crankshaft-
bearing housing/retainers. If the old bearings and retainers are being re-installed. use the same amount of shims as
before.
8. Install the off drive side bearing housing with shims in the power frame and tighten in place with the proper capscrews.
9. With the cone and roller assemblies of the main bearings in place on the crankshaft, slide the crankshaft through the
main bearing openings in the power end frame with No. 1 throw forward. Slide the off drive side bearing into its
bearing housing and race.
10. Assemble the drive side crankshaft-bearing housing/retainer and shims to the main frame and tighten in place with the
proper capscrews.
NOTE: The following steps (11a and 11 b) are necessary only if new bearings are being installed. When the same
crankshaft main bearings are being reassembled, use the same amount of shims as were previously used and use the
steps as a check for adjustment.
11. To determine the correct amount of shims when installing new bearings, the following steps are recommended.
a. When first installing shims, use only enough shims to produce a slight drag when the crankshaft is rotated. Tap
shaft on each end sufficient to ensure that the bearing outer race is tightly against the retainer.
Print
Home
30
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795813
e
NATIONAL OILWELL VARCO
Assembly...
I. POWER END
B. CRANKSHAFT AND MAIN BEARINGS
• 59T-3 (Continued)...
Installation, Care and Operation
Manual
b. Then, add enough shims to remove the slight drag or pre-load (approximately .005" [.127 mm] to .007" [.178
mm]), depending on the amount of pre-load). The bearings are correctly adjusted when the endplay of the
crankshaft is per the specifications and the crankshaft will rotate freely. Do not pre-load bearings.
CRANKSHAFT END PLAY
MAXIMUM END PLAY
MINIMUM END PLAY
PUMP
in
mm
in
mm
59T-3
I
.005
.127
.003
.076
103O-3
.006
.152
.004
.102
110O-3
.006
.152
.004
.102
• 103O-3 & 110O-3
1. Thoroughly clean and remove all burrs from the M. of the cone and roller assembly and from the bearing seating
surfaces on the crankshaft.
2. Heat the cone and roller assembly in an electric oven or oil bath to 300°F (149°C). It is recommended that a
thermometer be used to prevent overheating.
3. After the bearings have been brought up to temperature, and with the crankshaft firmly supported, install the cone and
roller assemblies on the crankshaft. Make sure the cone and roller assemblies are firmly against the shoulders on the
crankshaft.
4. Allow the crankshaft and bearing assembly to cool before installing in the power end.
5. If installing new steel backed Babbitt lined center mains, install them at this time as described below.
a. Chill the bearings in a freezer or with CO2.
b. Position the "half moon" cut outs in the bearings toward the front of the power frame. These are necessary for the
crosshead to clear the bearing when at bottom dead center.
c. Carefully install the center mains. With chilled center mains the bearings will slip into the bore or take a slight tap
with a brass rod. Do not 'beat- the bearings into place as this will damage them.
d. Allow the center mains to warm before proceeding.
e. If you do not have a method to chill the bearings, they can be pulled into place with a bearing installation tool. See
Figure 1 in the power end disassembly section for a typical bearing puller/installation tool. When using this method
take care to not damage the bearing surface and remove any slight raised spots or burrs that occur from installing
before proceeding.
Print
I
Home I
31
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795814
Installation, Care and Operation
Manual
Assembly...
el NATIONAL OILWELL VARCO
I. POWER END
B. CRANKSHAFT AND MAIN BEARINGS
• 103O-3 & 1100-3 (Continued)...
6. Make sure the main bearing openings in the frame are clean and free of burrs.
NOTE: The crossheads and connecting rods must be installed prior to replacing the crankshaft assembly.
7. Install the crankshaft main bearing outer races or cups in the main bearing housing. These races can be carefully driven
into the housing with a brass rod. An alternative and easier way is to chill the races in a freezer or with CO2 and place
them in their respective bearing housings. Ensure the races are completely seated.
8. Place the crankcase main bearing shims, amounting to approximately .120" (3.05 mm) in thickness, on the crankshaft-
bearing housing/retainers. If the old bearings and retainers are being re-installed. use the same amount of shims as
before.
9. Install the off drive side bearing housing with shims in the power frame and tighten in place with the proper capscrews.
10. With the cone and roller assemblies of the main bearings in place on the crankshaft, carefully slide the crankshaft
through the main bearing openings in the power end frame with No. 1 throw forward. Slide the off drive side bearing
into its bearing housing and race.
11. Assemble the drive side crankshaft-bearing housing/retainer and shims to the main frame and tighten in place with the
proper capscrews.
NOTE: The following steps (12a and 12b) are necessary only if new bearings are being installed. When the same
crankshaft main bearings are being reassembled, use the same amount of shims as were previously used and use the
steps as a check for adjustment.
12. To determine the correct amount of shims when installing new bearings, the following steps are recommended.
a. When first installing shims, use only enough shims to produce a slight drag when the crankshaft is rotated. Tap
shaft on each end sufficient to ensure that the bearing outer race is tightly against the retainer.
b. Then, add enough shims to remove the slight drag or pre-load (approximately .005" [.127 mm] to .007" [.178
mm]), depending on the amount of pre-load). The bearings are correctly adjusted when the endplay of the
crankshaft is per the specifications and the crankshaft will rotate freely. Do not pre-load bearings.
c. After installation the center mains should have .005" (.127 mm) to .007" (.178 mm) clearance per side or .010" (.254
mm) to .014" (.356 mm) clearance on the diameter.
Print
I
Home I
32
Index
I
Next
I
le NATIONAL OILWELL VARCO
EFTA00795815
NATIONAL OILWELL VARCO
Installation, Care and Operation
Manual
Assembly...
I. POWER END (Continued)...
C. CONNECTING ROD TO CRANKSHAFT ASSEMBLY (ALL PUMPS)
1. Thoroughly clean and remove all burrs and nicks from connecting rod and crankshaft journals.
2. Position the No. 1 crankshaft throw to the rear.
3. Take a shell bearing half and carefully locate it in the rod half of the connecting rod assembly.
4. Lubricate the connecting rod pin and rod bearing.
5. Slide the connecting rod back over the crankshaft throw using caution so the outer surface of the insert is not damaged.
Note the match numbers of the cap and rod to be certain the rod is assembled correctly.
8. Install the two (2) capscrews and torque as shown in chart.
ALL PUMPS
All Pumps All Pumps
(ft-lbs.)
(N-M)
Connecting rods
55-60
75-81
D. INTERMEDIATE RODS AND OIL SEAL RETAINERS
. ALL PUMPS
The power end wiper box is held in the power frame by two adjustment studs and the wiper box gland. After removing the
plunger/adapter rod and wiper box gland the stuffing box may be pushed out of the power end. The standard wiper box seals
are molded lip seals. To replace the seals follow the instructions below.
1. Clean the stuffing box and gland.
2. Lubricate a new set of seals and install in the stuffing box while taking care to not damage the lips.
3. Place the stuffing box back in the power frame.
4. Install the follower and loosely install the gland. Do not tighten until the plunger or adapter rod is reassembled.
Print
I
Home I
33
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795816
Installation, Care and Operation
Manual
Assembly (Continued)...
II. FLUID END
A. STUFFING BOXES AND PLUNGERS - ALL PUMPS
Plungers are available in ceramic or steel.
•
NATIONAL OILWELL VARCO
! ATTENTION !
NATIONAL OILWELL VARCO DOES NOT RECOMMEND THE USE OF CERAMIC PLUNGERS FOR PUMPING FLAMMABLE
OR HAZARDOUS LIQUIDS.
1. If the pump has separate stuffing boxes, thoroughly clean and remove any nicks or burrs from all mating surfaces of
the main frame, fluid cylinder and stuffing boxes.
2. Insert stuffing boxes into mainframe.
NOTE: The stuffing box is a press fit in the main frame and will have to be driven into position. As an alternative you
can chill the stuffing box in a freezer or with CO2.
! ATTENTION !
PREVENT DAMAGE BY PLACING A BLOCK OF WOOD OVER THE STUFFING BOX FACE.
3. Insert seals (stuffing box to fluid cylinder) into grooves in the face of the stuffing boxes. Grease lightly to hold in
place until fluid cylinder is installed.
4. Assemble packing in stuffing box bore as per instructions included with each set of packing, or as described later in
this section of the manual.
5. Torque adapter rods or one piece plungers to 100 ft.-lbs (135 N-M).
6. For small two piece plungers with 5/8-11 UNC threads, torque the plunger/adapter rod connection to 60 ft.-lbs. (81 N-M).
Print
Home I
34
Index
I
Next
e NATIONAL OILWELL VARCO
EFTA00795817
NATIONAL OILWELL VARCO
Assembly...
Installation, Care and Operation
Manual
II. FLUID END (Continued)...
B. POWER END/FLUID END ADAPTERS - ALL PUMPS
All pumps with integral stuffing boxes, except "L" class fluid ends, use a power end to fluid end adapter. The adapter is a
press fit into the power frame. The adapter is used to locate the fluid end and contains the threads for the packing gland nut.
1. Thoroughly clean and remove any nicks or burrs from all mating surfaces of the mainframe, fluid cylinder and
adapters.
2. Insert adapters into mainframe.
NOTE: The adapter is a press fit in the main frame and will have to be driven into position. As an alternative you can
chill the adapter in a freezer or with CO2.
! ATTENTION !
PREVENT DAMAGE BY PLACING A BLOCK OF WOOD OVER THE ADAPTER FACE.
3. Insert the 0 -Ring into the groove on the adapter face. Grease lightly to hold in place until fluid cylinder is installed.
C. FLUID CYLINDER (ALL PUMPS)
1. Carefully slide fluid end body into place. Ensure stuffing box or adapter seals are not pinched as cylinder is moved
into place.
2. Tighten nuts alternately, pulling fluid cylinder up evenly: torque nuts to the following values:
THREADS
59T-3
103O-3
110Q-3
Lubricated (ft-Ibs)
150
150
150
Lubricated (N-M)
203
203
203
D. FLUID VALVES - TAPERED SEAT TYPE (ALL PUMPS)
See Valve section of this manual.
E. PIPING INSTALLATION (ALL PUMPS)
1. Install flanges on fluid cylinder with special high carbon heat-treated capscrews or studs and nuts available from
National Oilwell Varco.
2. Install suction and discharge lines to flanges.
Print
I
Home I
35
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795818
Installation, Care and Operation
Manual
Assembly...
II. FLUID END (Continued)...
F. PLUNGER PACKING INSTALLATION
1. 838 Packing
•
NATIONAL OILWELL VARCO
It is important that the following procedure be observed when replacing old packing to prevent rapid packing
wear. Style 838 packing is assembled in units consisting of a pressure ring along with a top and bottom adapter.
Each set will have two or three units. Pay attention to the arrangement of the old packing sets to ensure the new
sets are installed correctly. Another check is the units are installed so the lantern ring is positioned under the
lubrication port. If the lantern ring does not align with the lubrication port, the pump is not correctly packed.
a. Remove cradle cover and rotate pump to bring the first plunger to the forward position.
b. Back off gland nut one or two rounds.
c. If the pump has intermediate rods a back-up wrench is required. The plunger and intermediate rod separate at
the knurl area interface. Using the back-up wrench break the plunger loose and unscrew from the intermediate
rod. Remove the plunger through the fluid cylinder opening.
d. If the pump does not have an intermediate rod, use a pipe wrench on the knurled area of the plunger and break
it loose from the crosshead. Unscrew and remove through the fluid cylinder opening.
e. Remove the gland nut, old packing, and packing adapters. Note the order of the packing and adapters. Clean the
stuffing box and inspect for any damage.
f.
Rotate the pump to bring the next plunger forward.
g. Repeat steps "V through 1" until all the plungers and packing have been removed.
h. Check the throat bushing, lantern ring, and follower for excessive wear. These items can often be reused, but if
they are worn, replace them. Reusing worn trim will cause premature packing failure.
i.
Lightly lubricate the stuffing box bore and install the throat bushing.
j.
Lightly lubricate a packing unit and install each component separately insuring each component is fully seated at the
bottom of the box before installing the next component. Repeat and install the second unit. (DO NOT GREASE)
k. Install the lantern ring. Check to ensure the lubrication port is aligned with the lantern ring. If not, to few or to many
units have been installed ahead of the lantern ring.
I.
Install the last unit of packing.
m. Install the follower ring and start the gland nut. Adjust the gland nut hand tight only.
n. Lightly oil the plunger and install it through the fluid cylinder. Do not use worn plungers on new packing, as this will
shorten packing life.
o. If using one piece plungers, torque plunger 100 ft-lbs (135N-M).
Print
Home
36
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795819
e
NATIONAL OILWELL VARCO
Assembly...
II. FLUID END
F. PLUNGER PACKING INSTALLATION
1. 838 Packing (Continued)...
P.
Installation, Care and Operation
Manual
If using two piece plungers, torque the adapter rod into crosshead 60 ft-lbs. (81 N-M). Then, use a back up wrench
on the adapter rod and torque the plunger into adapter rod 100 ft.-lbs. (135 N-M).
q. Repeat steps "h" through "p" until all cylinders have been repacked.
r.
Tighten gland nut with the wrench provided. Pull snug by hand, but DO NOT USE A CHEATER.
s. Start the pump and operate at pressure for two to three hours while observing for excessive leakage. If leakage is
excessive. stop the pump and readjust. After the two or three hours, stop the pump and readjust. Again, DO NOT
USE A CHEATER.
t.
This style packing is considered non-adjustable and should be ready to go at this point. However, it may take as
much as one or two days to fully seat. After a couple of days, stop the pump and check the packing again. After
this adjustment the pump should be ready to run without further adjustment.
r::. t.l PACKING
UNIT
THROAT BUSHING
'- FOLLOWER
83
CTV
E
1,
Figure 6
Print
I
Home I
37
GLAND N
REAR PAC K
j
r UNIT
- PLUNGER
Index
I
Next
I
•
NATIONAL OILWELL VARCO
EFTA00795820
Installation, Care and Operation
Manual
Assembly...
II. FLUID END
F. PLUNGER PACKING INSTALLATION (Continued)...
2. BRAIDED PACKING
e NATIONAL OILWELL VARCO
It is important that the following procedure be observed when replacing old packing to prevent rapid packing
wear. Braided packing sets consist of braided packing rings, spacer rings, and end rings. The composition and
number of rings vary depending on the fluid compatibility and stuffing box depth.
a. Remove cradle cover and rotate pump to bring the first plunger to the forward position.
b. Back off gland nut one or two rounds.
c. If the pump has intermediate rods a back-up wrench is required. The plunger and intermediate rod separate at
the knurl area interface. Using the back-up wrench break the plunger loose and unscrew from the intermediate
rod. Remove the plunger through the fluid cylinder opening.
d. If the pump does not have an intermediate rod, use a pipe wrench on the knurled area of the plunger and break
it loose from the crosshead. Unscrew and remove through the fluid cylinder opening.
e. Remove the gland nut, old packing, and packing adapters. Note the order of the packing and adapters. Clean the
stuffing box and inspect for any damage.
f.
Rotate the pump to bring the next plunger forward.
g. Repeat steps "V through 1" until all the plungers and packing have been removed.
h. Check the throat bushing and follower for excessive wear. These items can often be reused, but if they are worn,
replace them. Reusing worn trim will cause premature packing failure.
i.
Ensure the stuffing box lube port is plugged or has not been drilled completely through. Braided packing does not
use a lantern ring and the port must be plugged or the packing can extrude through the port.
j.
Lightly lubricate the stuffing box bore and install the throat bushing.
k. Install the first end ring into the box. Ensure it is fully seated against the bottom of the box and not cocked.
I.
Install the first pressure ring into the box and ensure it is fully seated.
m. Install the spacer and ensure it is fully seated.
n. Repeat this procedure until all the packing is installed and fully seated. ENSURE THE SPLITS ON EACH
PACKING RING ARE STAGGERED FROM THE PREVIOUS RING. DO NOT ALIGN THE SPLITS.
o. Install the follower ring and loosely install the gland nut.
p. Lightly oil the plunger and install it through the fluid cylinder. Do not use wom plungers on new packing, as this will
shorten packing life.
Print
Home
38
Index
I
Next
I
4 NATIONAL OILWELL VARCO
EFTA00795821
NATIONAL OILWELL VARCO
Assembly...
II. FLUID END
F. PLUNGER PACKING INSTALLATION
2. BRAIDED PACKING (Continued)...
q.
Installation, Care and Operation
Manual
If using one piece plungers, torque plunger 100 ft-lbs (135N-M).
r.
If using two piece plungers, torque the adapter rod into the crosshead 60 ft.-lbs. (81 N-M). Then, use a back up
wrench on the adapter rod and torque the plunger into adapter rod 100 ft.-lbs. (135 N-M).
s. Repeat steps "h" through '7- until all cylinders have been repacked.
t.
Tighten gland nuts finger tight. Some braided packing is very sensitive to gland tightening. Do not over tighten.
u. Start the pump and bring up to pressure. Watch the packing carefully for signs of excessive heat. If the packing
starts to smoke back the gland off a little. Braided packing does normally drip a small amount. This is by design
and helps keep the packing from over heating.
v. Continue to slowly tighten the nut to reduce the leakage to an acceptable level. Remember this type of packing
does leak a small amount and tightening the gland until all leakage has stopped will usually result in excessive heat
and packing failure. This style packing is adjustable packing and will have to been inspected regularly to keep the
nut tight and leakage to a minimum. If the pump is allowed to operate with too loose packing, the packing will
prematurely fail and you run the risk of damaging the stuffing box.
Print
I
I
Figure 7
Home I
39
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795822
Installation, Care and Operation
Manual
Assembly...
e NATIONAL OILWELL VARCO
II. FLUID END
F. PLUNGER PACKING INSTALLATION (Continued)...
3. 1068-4 PACKING
1068-4 packing is spring loaded, molded V-ring style packing. It is normally used in reverse osmosis services, but
may be used in other selected applications. This is non-adjustable packing.
a. Remove cradle cover and rotate pump to bring the first plunger to the forward position.
b. Back off gland nut one or two rounds.
c. If the pump has intermediate rods a back-up wrench is required. The plunger and intermediate rod separate at
the knurl area interface. Using the back-up wrench break the plunger loose and unscrew from the intermediate
rod. Remove the plunger through the fluid cylinder opening.
d. If the pump does not have an intermediate rod, use a pipe wrench on the knurled area of the plunger and break
it loose from the crosshead. Unscrew and remove through the fluid cylinder opening.
e. Remove the gland nut, old packing, and packing adapters. Note the order of the packing and adapters. Clean the
stuffing box and inspect for any damage.
f.
Rotate the pump to bring the next plunger forward.
g. Repeat steps "V throughl" until all the plungers and packing have been removed.
h. Check the throat bushing and follower for excessive wear. These items can often be reused, but if they are worn,
replace them. Reusing worn trim will cause premature packing failure.
i.
Ensure the stuffing box lube port is plugged or has not been drilled completely through. 1068-4 packing does not
use a lantern ring and the port must be plugged or the packing can extrude through the port
j.
Lightly lubricate the stuffing box bore and install the throat bushing, if used.
k. Install the packing spring.
I.
Lubricate and install the packing set and adapters.
m. Install the follower ring (if used) and gland nut. Do not fully tighten the gland nut at this time.
n. Lightly oil the plunger and install it through the fluid cylinder. Do not use worn plungers on new packing, as this will
shorten packing life.
o. If using one piece plungers, torque plunger 100 ft.-lbs (135N-M).
p. If using two piece plungers, torque the adapter rod into the crosshead 60 ft.-lbs. (81 N-M). Then, use a back up
wrench on the adapter rod and torque the plunger into adapter rod 100 ft.-lbs. (135 N-M).
q. Repeat steps "h" through "p" until all cylinders have been repacked.
Print
I
Home I
40
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795823
e
NATIONAL OILWELL VARCO
Assembly...
II. FLUID END
F. PLUNGER PACKING INSTALLATION
3. 1068-4 PACKING (Continued)...
Installation, Care and Operation
Manual
r.
Using the standard gland wrench tighten all glands completely. The glands will pull completely up. Again, this
packing is spring-loaded and non-adjustable so once the glands are properly pulled up there is no more adjustment.
s. Start the pump and bring up to pressure.
THROAT BUSF
Print
Figure 8
Home I
41
Index
I
Next
•
NATIONAL OILWELL VARCO
EFTA00795824
Installation, Care and Operation
Manual
Plunger Pump Valves...
e NATIONAL OILWELL VARCO
I. OPERATIONAL MAINTENANCE
A. SUCTION AND DISCHARGE
As with any plunger pump, the necessity for having an adequate suction head and proper piping design of both suction
and discharge cannot be over emphasized.
! ATTENTION !
NOISY VALVES, DUE TO IMPROPER FILLING, CAN LEAD TO SHORT LIFE AND RAPID MECHANICAL WEAR OF
THE POWER END PARTS.
B. VALVE COVERS
A CAUTION A
THE VALVE COVERS, AS USED WITH THE NATIONAL OILWELL VARCO PLUNGER PUMPS, MUST BE KEPT
TIGHT AT ALL TIMES. DUE TO THE DISCHARGE PRESSURE APPLYING A CONSTANT LOAD TO THE COVERS.
IT IS NOT POSSIBLE TO CHECK THEIR TIGHTNESS WITH THE PUMP RUNNING OR WITH PRESSURE IN THE
CYLINDER.
Bleed off the discharge pressure and check the tightness of the covers as outlined under the assembly procedure for the
type of cover used.
C. VALVE COVER SEALS
Tapered Seat Valves: The cover seals should be replaced as required.
D. VALVE SPRINGS
The springs used with the NATIONAL OILWELL VARCO valves are made of inconel alloy or other stainless steel.
! ATTENTION !
THESE SPRINGS SHOULD BE CHANGED APPROXIMATELY ONCE A YEAR IN ORDER TO ASSURE PROPER
VALVE ACTION AND ELIMINATE THE POSSIBILITY OF A SPRING BREAK.
E. VALVE AND SEAT
Tapered Seat Valves: There are four basic valve & seat assemblies available, depending on the type of service. They
are the severe duty (abrasion resistant) tapered seat valves, the disc tapered seat valves, the spherical tapered seats and
the spherical severe duty tapered seat valves.
Print
I
Home
42
Index
I
Next
I
de NATIONAL OILWELL VARCO
EFTA00795825
is NATIONAL OILWELL VARCO
Plunger Pump Valves (Continued)...
Installation, Care and Operation
Manual
II. TAPERED SEAT VALVES
A. SEVERE DUTY TYPE VALVES
This section will assist in servicing the severe duty (abrasion resistant) valve in your National Oilwell Varco reciprocating
pump.
1. NOMENCLATURE.
NOMENCLATURE
SPRING
RETAINER
INSERT
THREAD LOCK
SEAT
VALVE BODY
SEVERE DUTY VALVE ASSEMBLY
For part numbers and pullers see the following table.
Severe Duty Valve
Pump Model
Suction Valve
Assembly
Discharge Valve
Assembly
Valve Puller
Assembly
59T-3I-I, 103O-3H, 1100-3H
998-016313-027
998-016313-028
002-010359-220
59T-3MSC, 103O-3MSC, 110O-3MSC
100SD0304
100SD0304
998-016202-091
59T-3M, 103O-3M, 110O-3M
100SD0513
100SD0513
998-Q3150M-091
59T-3L, 103O-3L, 110Q-3L
100SD0809
100SD0809
998-O4240L-091
Print
Home I
43
Index
I
Next
is NATIONAL OILWELL VARCO
EFTA00795826
Installation, Care and Operation
Manual
Plunger Pump Valves ...
e NATIONAL OILWELL VARCO
II. TAPERED SEAT VALVES
A. SEVERE DUTY TYPE VALVES (Continued)...
2. VALVE REMOVAL PROCEDURES
a. Ensure pressure is removed from fluid end and pump is "LOCKED OUT".
b. The discharge valve is removed through the valve cover and the suction valve is removed through the cylinder
head. Remove both covers.
c. Rotate the pump so the plunger for the cylinder you are working on is all the way back.
d. Starting with the discharge valve assembly use the cage wrench (see tools section of parts list for special tools
and numbers) and remove the valve retainer by turning the wrench counter-clockwise.
e. Remove the valve spring.
f.
Remove the valve body.
g. Use the special valve puller and remove the valve seat. See Figure 9.
h. Repeat steps "c" through "g" for the suction valve assembly.
BUMPER STEM
HOLD DOWN
NUT
SEAT PULLER
HEAD
Print.
REMOVAL C.
DISCHARGE
SEAT VALVE
ADAP I ER Ni
PULLER STEM
STRONG BA
Home
HOLD DOWN
Figure 9
44
REMOVAL OF
SUCTION
VALVE SEAT
- ADAP I L”.
PULLER STEM
STRONG BACK
SEAT PULLER
HEAD
Index
I
Next
4 NATIONAL OILWELL VARCO
EFTA00795827
S NATIONAL OILWELL VARCO
Plunger Pump Valves...
II. TAPERED SEAT VALVES
A. SEVERE DUTY TYPE VALVES (Continued)...
3. VALVE PARTS INSPECTION
Installation, Care and Operation
Manual
NOMENCLATURE
SPRING
INSERT
THREAD LOCK
a. RETAINER
1
RETAINER
SEAT
VALVE BODY
SEVERE DUTY VALVE ASSEMBLY
The retainer will not need to be replaced very often. It should be inspected for corrosion or to see if it has
been warped or bent. If this is the case, replace the retainer because this can cause undue wear on the spring
and improper valve action.
b. SPRING
The spring is made from inconel or other stainless steel and will work in most corrosive environments. It
should be inspected for wear and/or nicks. If such evidence is apparent, the spring should be replaced.
c. INSERT
The valve insert is made from polyurethane. A good insert is vital for good sealing in slurries or dirty fluids.
Inspect the insert for tears, nibbling, and extrusion. If the insert is worn, replace it. Generally you can replace
the insert a couple of times before having to replace the valve body.
Print
Home I
45
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795828
Installation, Care and Operation
Manual
Plunger Pump Valves...
II. TAPERED SEAT VALVES
A. SEVERE DUTY TYPE VALVES
•
NATIONAL OILWELL VARCO
3. VALVE PARTS INSPECTION (Continued)...
d. THREAD LOCK
The thread lock is a nitrile rubber. It is used to lock the retainer and prevent it from backing off during pump
operation. If the thread lock is torn or damaged, replace it.
e. VALVE BODY
The valve body is heat-treated 17-4 PH stainless. Inspect the body for excessive wear, cracks. or washing.
The guides should also be inspected for proper fit in the seat and any cracks or excessive wear. Replace the
valve body when these conditions are present. If replacing the valve body, a new insert should also be used.
f. SEAT
The seat is also a heat-treated 17-4 PH stainless steel. It should be inspected for excessive wear and/or
wash on the seating surface. Also check the taper for signs of wash by or wear. If any of these conditions exist,
the seat should be replaced. Do not use an old valve body with a new seat.
With the seat out of the pump also inspect the liquid end seating area for washing or excessive wear. The
seats should fit in the liquid end with a small amount of stand off. If the liquid end seating area is washed or there
is no stand off on the seats, the liquid end will have to be repaired. This type of repair will require the services of
a machine shop.
4. VALVE INSTALLATION PROCEDURES
a. Thoroughly clean the fluid cylinder seat area with a cleaner that will not leave an oily residue. Do not oil the
taper area of the seat or fluid cylinder seating area. This will cause the seat to "jump out" of the bore
and could cause major damage to the pump.
b. Clean the taper on the suction seat using the same precautions as with the fluid cylinder bore. The two surfaces
must be clean and dry before assembly.
c. Insert the suction seat into the fluid cylinder suction bore.
d. Using a metal plate or old worn valve body, drive the seat into place with several sharp blows from a hammer
and bar. See Figure 10.
Print
I
Home
46
Index
I
Next
I
le NATIONAL OILWELL VARCO
EFTA00795829
t
NATIONAL OILWELL VARCO
Plunger Pump Valves...
Installation, Care and Operation
Manual
II. TAPERED SEAT VALVES
A. SEVERE DUTY TYPE VALVES
4. VALVE INSTALLATION PROCEDURES (Continued)...
\
Figure 10
e. Install the new valve body with insert.
f.
Install the spring.
g. Using the cage wrench (see parts list for special tools) install the retainer cage.
h. Repeat this procedure for the discharge valve.
i.
Repeat until all valve assemblies have been installed.
Print
I
Home I
47
Index
I
Next
e NATIONAL OILWELL VARCO
EFTA00795830
Installation, Care and Operation
Manual
Plunger Pump Valves...
II. TAPERED SEAT VALVES (Continued)...
B. DISC TAPERED SEAT VALVES
1. NOMENCLATURE
•
NATIONAL OILWELL VARCO
NOMENCLATURE
FASTENER
.5
• ••
OUTER SPRING
VALVE DISC
SEAT
For part numbers and pullers see the following table.
RETAINER
INNER SPRING
Disc Style Valve
Pump Model
Suction Valve
Assembly
Discharge Valve
Assembly
Valve Puller
Assembly
59T-3H, 103O-3H, 110O-3H
Not Available
Not Available
Not Available
59T-3MSC, 103O-3MSC, 110O3-3MSC
(Delrin Disc)
001DP0304
(Delrin Disc)
001DP0304
998-016202-092
59T-3MSC, 103O-3MSC, 110O3-3MSC
(Titanium Disc)
001TP0304
(Titanium Disc)
001TP0304
998-016202-092
59T-3M, 103O-3M, 110O-3M
Delrin Disc)
001DP0513
Delrin Disc)
001DP0513
998-Q3150M-092
59T-3M, 103O-3M, 110O-3M
(Titanium Disc)
001TP0513
(Titanium Disc)
001TP0513
998-O3150M-092
59T-3L, 103O-3L, 110O-3L
Delrin Disc)
001DP0809
(Delrin Disc)
001DP0809
998-Q4240L092
59T-3L, 103O-3L, 110O-3L
(Titanium Disc)
001TP0809
(Titanium Disc)
001TP0809
998-Q4240L-092
Print
Home
48
Index
I
Next
NATIONAL OILWELL VARCO
EFTA00795831
S NATIONAL OILWELL VARCO
Plunger Pump Valves...
Installation, Care and Operation
Manual
II. TAPERED SEAT VALVES
B. DISC TAPERED SEAT VALVES (Continued)...
2. VALVE REMOVAL PROCEDURES
a. Ensure pressure is removed from the fluid end and pump is 'Locked out".
b. The discharge valve is removed through the valve cover and the suction valve is removed through the cylinder
head. Remove both covers.
c. Rotate the pump so the plunger for the cylinder you are working on is all the way back.
d. Starting with the discharge valve assembly remove the capscrew holding the retainer in place.
e. Remove the retainer and valve springs.
f.
Remove the valve disc.
g. Use the special valve puller and remove the seat. See Figure 11.
h. Repeat steps "C through "g" for the suction valve assembly.
BUMPER STEM
ADAPTER \
PULLER STEM
HOLD DOWN
HOLD DOWN
NUT
NUT
r
STRONG BACK
SEAT PULLER
HEAD
Pr
u_Sa
REMOVAL 0=
DISCHARGE
SEAT VALVE
Figure 11
Home I
49
0
/
0 \\,- Si/VI PULLN
0
0
HEAD
REMOVAL OF
SUCTION
',',LVE SEA
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795832
Installation, Care and Operation
Manual
Plunger Pump Valves...
II. TAPERED SEAT VALVES
B. DISC TAPERED SEAT VALVES (Continued)...
3. VALVE PARTS INSPECTION
a. FASTENER
e NATIONAL OILWELL VARCO
The fastener has a nylon lock tab or a lock patch. Inspect the fastener for corrosion, damaged threads,
straightness, and condition of the locking tab. If the fastener is damaged, replace it. The locking tab can be
used more than once. However, if the resistance when the tab engages the thread is minimal, replace it.
b. RETAINER
The retainer will not need to be replaced very often. It should be inspected for corrosion or to see if it has
been warped or bent. If this is the case, replace the retainer because this can cause undue wear on the springs
and improper valve action.
c. SPRINGS
The springs are made from inconel or other stainless steel and will work in most corrosive environments.
They should be inspected for wear and/or nicks. If such evidence is apparent, the springs should be replaced.
d. VALVE DISC
The valve disc is either 'Delrin" or Titanium. Inspect the disc for excessive wear, cracks, or washing. If any
of these conditions exist, replace the disc.
e. SEAT
The seat should be inspected for excessive wear and/or wash on the seating surface. Also check the webs
for any cracks and the thread for any tears or damaged threads. Check the taper for any signs of wash.
Replace the seat if these conditions exist.
4. VALVE INSTALLATION PROCEDURES
a. Thoroughly clean the fluid cylinder seat area with a cleaner that will not leave an oily residue. Do not oil the
taper area of the seat or fluid cylinder seating area. This will cause the seat to "jump out" of the bore
and could cause major damage to the pump.
b. Clean the taper on the suction seat using the same precautions as with the fluid cylinder bore. The two surfaces
must be clean and dry before assembly.
c. Insert the suction seat into the fluid cylinder suction bore.
Print
Home I
50
Index
I
Next
I
4 NATIONAL OILWELL VARCO
EFTA00795833
S NATIONAL OILWELL VARCO
Plunger Pump Valves...
Installation, Care and Operation
Manual
II. TAPERED SEAT VALVES
B. DISK TAPERED SEAT VALVES
4. VALVE INSTALLATION PROCEDURES (Continued)...
d. Using a metal plate or old worn valve body, drive the seat into place with several sharp blows from a hammer
and bar. See Figure 12.
Figure 12
e. Install the valve disc.
f.
Install the valve springs.
g. Install the retainer.
h. With one hand push the retainer down to compress the springs and start the neck of the retainer through the
valve disc. Hand start the fastener.
i.
Tighten the fastener while ensuring the retainer pulls down against the seat and does not clamp the disc down.
The disc has to move up and down on the retainer neck.
j.
Repeat this procedure for the discharge valve.
k. Repeat for the remaining cylinders.
Print
Home I
51
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795834
Installation, Care and Operation
Manual
Plunger Pump Valves...
II. TAPERED SEAT VALVES (Continued)...
C. SPHERICAL VALVES
1. NOMENCLATURE
NOMENCLATURE
NATIONAL OILWELL VARCO
RETAINER
SPRING
, 11
WAVE RING
SEAT
VALVE BODY
SPHERICAL VALVE ASSEMBLY
For part numbers and pullers see the following table.
Spherical Valve
Pump Model
Suction Valve
Assembly
Discharge Valve
Assembly
Valve Puller
Assembly
591-3H, 103O-3H, 110O-3H
Not Available
Not Available
Not Available
59T-3MSC, 103O-3MSC, 110Q-3MSC
179150025W
179150025W
181259201
59T-3M, 103O-3M, 110O-3M
179100025W
179100025W
181259226
59T-3L, 103O-3L, 110O-3L
179303625W
179303625W
180104127
Print
Home
52
Index
I
Next
NATIONAL OILWELL VARCO
EFTA00795835
is NATIONAL OILWELL VARCO
Plunger Pump Valves...
Installation, Care and Operation
Manual
II. TAPERED SEAT VALVES
C. SPHERICAL VALVES (Continued)...
2. VALVE REMOVAL PROCEDURE
a. Ensure pressure is removed from fluid end and pump is "LOCKED OUT".
b. The discharge valve is removed through the valve cover and the suction valve is removed through the cylinder
head. Remove both covers.
c. Rotate the pump so the plunger for the cylinder you are working on is all the way back.
d. Remove the spring retainer by pressing downward on the puller head and turn counter clockwise about 1/8 of a
turn or until retainer stops. Remove the retainer with the retriever. See Figure 13.
e. Remove spring(s) and valve with the retriever. See Figure 14.
f.
Remove seat by placing the puller head through the seat opening and engage lugs to the underside of the seat.
Pull seat or bump seat loose and remove. See Figure 15.
g. Repeat steps "C through `P for the suction valve assembly.
3. VALVE PARTS INSPECTION
a. RETAINER
The retainer will not need to be replaced very often. It should be inspected for corrosion or to see if it has
been warped or bent. If this is the case, replace the retainer because this can cause undue wear on the springs
and improper valve action.
b. SPRING (S)
The springs are made from inconel or other stainless steel and will work in most corrosive environments. It
should be inspected for wear and/or nicks. If such evidence is apparent, the spring should be replaced.
c. VALVE BODY
The valve body is a stainless steel spherical disc. Inspect the valve for excessive wear, cracks, or washing.
If any of these conditions exist, replace the valve.
d. SEAT
The seat is stainless steel and should be inspected for excessive wear and/or wash on the seating surface.
Also check the lugs, which engage the retainer for any damage. Check the taper for any signs of wash.
Replace if these conditions exist.
e. WAVE RING
The wave rings protects the valve integrity and is a safety device to prevent the cage from coming loose in
the rare event a spring breaks. Check the wave ring for cracks or damage. Replace if necessary.
Print
I
Home I
53
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795836
Installation, Care and Operation
Manual
Plunger Pump Valves...
II. TAPERED SEAT VALVES
e NATIONAL OILWELL VARCO
C. SPHERICAL VALVES (Continued)...
4. VALVE INSTALLATION PROCEDURE
a. Thoroughly clean the cylinder taper with a cleaner that will not leave an oily residue. Do not oil the taper area
of the seat or fluid cylinder seating area. This will cause the seat to "jump out"
b. Clean the taper on the suction seat using the same precautions as with the fluid cylinder bore. The two surfaces
must be clean and dry before assembly.
c. Inspect for corrosion or damaged areas. Repair or replace as required.
d. Place seat in the suction bore making certain it is straight.
e. With a bar and a driver tap seat in place with 2 or 3 strokes. NOTE!! Seat does not have to be completely
seated. Pump start-up pressure will drive seat home. See Figure 17.
f.
Install valve, spring(s), and spring retainer. See Figure 18.
Print
Home
54
Index
I
Next
I
e NATIONAL OILWELL VARCO
EFTA00795837
S
NATIONAL OILWELL VARCO
Plunger Pump Valves...
Installation, Care and Operation
Manual
II. TAPERED SEAT VALVES
C. SPHERICAL VALVES
4. VALVE INSTALLATION PROCEDURE (Continued)...
Figure 13
Figure 14
Figure 17
Home
55
Figure 15
Figure 16
Figure 18
Index
NATIONAL OILWELL VARCO
EFTA00795838
Installation, Care and Operation
Manual
Plunger Pump Valves...
II. TAPERED SEAT VALVES (Continued)...
D. SPHERICAL VALVES - SEVERE DUTY
1. NOMENCLATURE
S NATIONAL OILWELL VARCO
NOMENCLATURE
RETAINER
SPRING
INSERT
WAVE RING
SEAT
VALVE BODY
SPHERICAL - SEVERE DUTY
ASSEMBLY
For part numbers and pullers see the following table.
Spherical Valve
Pump Model
Suction Valve
Assembly
Discharge Valve
Assembly
Valve Puller
Assembly
591-3H, 103O-3H, 110O-3H
Not Available
Not Available
Not Available
59T-3MSC, 103O-3MSC, 110Q-3MSC
179150025SD
179150025SD
181259201
59T-3M, 103O-3M, 110O-3M
179100025SD
179100025SD
181259226
59T-3L, 103Q-3L, 110Q-3L
179303625SD
179303625SD
180104127
Print
Home
56
Index
I
Next
S NATIONAL OILWELL VARCO
EFTA00795839
S NATIONAL OILWELL VARCO
Plunger Pump Valves...
Installation, Care and Operation
Manual
II. TAPERED SEAT VALVES
D. SPHERICAL VALVES - SEVERE DUTY (Continued)...
2. VALVE REMOVAL PROCEDURE
a. Ensure pressure is removed from fluid end and pump is "LOCKED OUT".
b. The discharge valve is removed through the valve cover and the suction valve is removed through the cylinder
head. Remove both covers.
c. Rotate the pump so the plunger for the cylinder you are working on is all the way back.
d. Remove the spring retainer by pressing downward on the puller head and turn counter clockwise about 1/8 of a
turn or until retainer stops. Remove the retainer with the retriever. See Figure 14.
e. Remove spring(s) and valve with the retriever. See Figure 15.
f.
Remove seat by placing the puller head through the seat opening and engage lugs to the underside of the seat.
Pull seat or bump seat loose and remove. See Figure 16.
g. Repeat steps "C through "f" for the suction valve assembly.
3. VALVE PARTS INSPECTION
a. RETAINER
The retainer will not need to be replaced very often. It should be inspected for corrosion or to see if it has
been warped or bent. If this is the case, replace the retainer because this can cause undue wear on the springs
and improper valve action.
b. SPRING (S)
The springs are made from inconel or other stainless steel and will work in most corrosive environments. It
should be inspected for wear and/or nicks. If such evidence is apparent, the spring should be replaced.
c. VALVE BODY
The valve body is a stainless steel spherical disc. Inspect the valve for excessive wear, cracks, or washing.
If any of these conditions exist, replace the valve.
d. INSERT
The standard insert is polyurethane and is used when solids are present in the fluid. Inspect the insert for
cracks or tears. If damaged replace.
e. SEAT
The seat is stainless steel and should be inspected for excessive wear and/or wash on the seating surface.
Also check the lugs, which engage the retainer for any damage. Check the taper for any signs of wash.
Replace if these conditions exist.
Print
I
Home I
57
Index
I
Next
I
NATIONAL OILWELL VARCO
EFTA00795840
Installation, Care and Operation
Manual
Plunger Pump Valves...
II. TAPERED SEAT VALVES
D. SPHERICAL VALVES - SEVERE DUTY
e NATIONAL OILWELL VARCO
3. VALVE PARTS INSPECTION (Continued)...
f. WAVE RING
The wave rings protects the valve integrity and is a safety device to prevent the cage from coming loose in
the rare event a spring breaks. Check the wave ring for cracks or damage. Replace if necessary.
4. VALVE INSTALLATION PROCEDURE
a. Thoroughly clean the cylinder taper with a cleaner that will not leave an oily residue. Do not oil the taper area
of the seat or fluid cylinder seating area. This will cause the seat to "jump out"
b. Clean the taper on the suction seat using the same precautions as with the fluid cylinder bore. The two surfaces
must be clean and dry before assembly.
c. Inspect for corrosion or damaged areas. Repair or replace as required.
d. Place seat in the suction bore making certain it is straight.
e. With a bar and a driver tap seat in place with 2 or 3 strokes. NOTE!! Seat does not have to be completely
seated. Pump start-up pressure will drive seat home. See Figure 17.
f.
Install valve, spring(s), and spring retainer. See Figure 18.
Print
I
Home
58
Index
I
Next
I
4 NATIONAL OILWELL VARCO
EFTA00795841
S NATIONAL OILWELL VARCO
P-55U Pump...
A. OPERATING INSTRUCTIONS
1. BOX SUCTION PUMPS (VACUUM FEED)
•
Fill reservoir with oil.
•
Loosen union nut on pump outlet.
Installation, Care and Operation
Manual
•
Remove the vent screw and fill the sight glass with oil.
Prime by manually pumping flushing unit until air free oil
is observed from the drip tube and oil level drops in the
sight glass.
•
Replace vent screw and tighten union nut.
•
Maintain oil level in sight glass below the drip tube so
drops can be observed.
2. FLOW RATE ADJUSTMENT
•
Loosen locknut on flushing unit.
•
Turn flushing unit counterclockwise to increase flow.
•
Turn flushing unit clockwise to decrease flow.
•
Tighten locknut when desired flow rate is achieved.
3. SIGHT GLASS
In a vacuum type sight feed. it is not uncommon for
oil level in the sight glass to drop during operation.
Absence of a level indicates air is being taken in with the
oil and some oils, due to viscosity conditions, will release
air faster than others. When the quality of air becomes
excessive. it can eventually air lock the pump.
For this reason it is recommended that an oil level in
the sight glass be maintained.
When level drops. remove the vent screw and fill
sight glass to top: replace vent screw and operate
flushing unit manually. observing that an oil in the sight
glass is free from air. If air is not expelled, it may be
necessary to loosen union nut (on pump outlet) and expel
air at this point. It is desirable to maintain level below the
drip tube so drops can be seen during operation.
Print
Home I
59
4. OVERFILLING OF SIGHT GLASS
In a vacuum type sight feed, it is not uncommon to
see a reverse action whereas sight glass fills with oil and
the drops cannot be observed. Overfilling is caused by
oil absorbing air in the sight glass and normally does not
affect the operation of the pump. Remove the vent screw
from sight glass and allow level to drop below drip tube.
Tighten vent screw and check to see that air free oil from
drip tube can be observed in the sight glass. If overfilling
continues, it may be caused by plunger wear and oil
slippage is being drawn back to sight glass. If this is the
problem, the feed setting in drops per stroke will then
automatically be reduced by the amount of slippage.
5. RESERVOIR OIL LEVEL (LOSS OF PRIME)
If reservoir runs low on oil (at a point below the
suction inlet of the pump) it may be necessary to prime
individual pumps after filling, using procedure listed
above.
6. PUMP DISPLACEMENT
Maximum output (per stroke):
1/4 Plunger = .018 Cubic Inches
3/8 Plunger = .038 Cubic Inches
The cubic volume for a pint of oil is 28.9 cubic inches
and average drop size is .002 cubic inches.
Vent Screw
Sight Glass
11
Flushing Unit
Lock Nut
Index
I
Pump Outlet. 1/8*NPT
t
-4-
Union Nut
co 'Minn IMqt
Next
I
S NATIONAL OILWELL VARCO
EFTA00795842
• NATIONAL OILWELL VARCO
With over 120 locations worldwide, National Oilwell Varco is located near you. To
find the nearest Distribution Service Center, machinery center or repair facility,
please give us a call at our main office listed below.
Or you can access our website at the URL listed below, where you may search
by location or country.
Sales/Technical Information:
USA Tollfree: 1 (800) 324-4706
Internet:
National Oilwell Varco is a leading
manufacturer of reciprocating plunger
pumps. Mission Fluid King centrifugal
pumps. and fluid end replacement parts.
We also offer a complete set of solutions to
your fluid transfer challenges. For more
Information. contact National Oilwell Varco
directly at the Headquarters in Houston,
Texas. All National Oilwell Varco products
are available throughout the U.S. and
around the world from service centers.
authorized distributors, and
representative8.
0 Copyright 1999 by National OiMPlillt M Rights
Reserved. NATIONAL OILWELL. NA
AL. and
OILWELL %yap:tared trademarks of NATIONAL
OILWELL.
Houston. Texas. USA. All other
trademarks used are registered to their respective
companies The information and data in this
brochure. ',Nutley OP not limited to pictures.
photographs. charts. clagrams. drawing, lets.
written comments. and specifications. are accurate to
the best of our knowledge and belief. but are
ntencled lot general information oNy. Applications
suggested for the materials and other information are
described only to heip readers mate their own
evaluations and decisions. and are nuttier
guarantees nor ate they to be construed as expels
or implied warranties of vital:41y for these or other
applications. National Olson makes no warranty.
either express or implied, beyond that stipulated in
National Chen's Standard Terms and Condtions of
Sale which are available upon request.
Home I
hex
EFTA00795843
Technical Artifacts (5)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
(800) 324 4706Phone
1 (800) 324-4706Phone
1 (918)447 4600Phone
210-4638Wire Ref
transfer challengesForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.