7 Week Look Ahead Schedule
Maly
10 •
B
I
U
e>. • A •
•
Eal
e
Assigned To
GSJ Cottage
02/01/19
JPK
LSJ Tiki Kitchen
01/25/19
LSJ
GSJ Big Tiki
01/31/19
BBates
Stone Wall Main Co 03/29/19
Danny
O - Hut
02/15/19
EB
Pebble Beach
03/08/19
Kyle / Dupson
RO Building GSJ
tbd
TBD
Cabana 3
tbd
5 Palms
tbd
LSJ Tile Roofs
tbd
Grotto
tbd
Jeffers 2 Roads
tbd
Waterfall LSJ Area
tbd
JPK / LSJ
JPK/EB
JPK / Pokey / BWS
EB?
Jeffers
LSJ
Status
In Progress
In Progress
In Progress
Not Started
In Progress
In Progress
Not Started
In Progress
Not Started
Not Started
In Progress
Not Started
In Progress
-=
=
Z ,
$ •
.0. .00.
Comments
Tile is being laid, siding to start, roof installation IP, window door install
Tile Samples awaiting approval. kitchen demed. tile is next step. then cabinets. etc
Brian to finish deck 2 days, Roof Starting (leaves 3.5 weeks for roof install and finishes)
Schedule and budget established starting on 10th of Jan.
EB starting the 14th of Jan (Mason broke his hip..) Max 4.5 weeks barring no DPNR issues
Dupson / Kyle to begin next week on rebar footing and pour for FDs. Then Stone walls and roof schedule dependent
on walls 8 weeks tent finish
We need an Architect for Plumbing / Electric drawings for RO system design. This is will cause changes to layout
inside building drawn
Tile back up and pipes repaired. Awaiting arrival dates of the flooring company (2 weeks from arrival of flooring
company)
Awaiting JPK and EB bids for this, multiple emails and calls in still awaiting pricing for outlined scope (6 week
schedule)
tracking down copper and EIFS. Awaiting BIN Sub proposal. Pokey coming out Monday 9 am to look at (4.5 weeks
for each roof)
EB pricing received. Was told to put them off and sun louvre company will do this? EB can still do this if green light is
given it will be 2 weeks from start date
Jeffers to Confirm Schedule / Tent start date Jan 14th Jeffers in discussion with his lawyers on credit
Need to establish layout of post. then pour slab (with post leave-outs)- erect post and shade sails? 2 weeks total
from start date
EFTA00795982
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.