Skip to main content
Skip to content
Case File
efta-efta00795982DOJ Data Set 9Other

Search. .

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00795982
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Search. . smartsheet File Alerts & Actions Forms 1 glg Grid View • V Filter rl) E7! i Task Name Finish 7 Week Look Ahead Schedule Maly 10 • B I U e>. • A • Eal e Assigned To GSJ Cottage 02/01/19 JPK LSJ Tiki Kitchen 01/25/19 LSJ GSJ Big Tiki 01/31/19 BBates Stone Wall Main Co 03/29/19 Danny O - Hut 02/15/19 EB Pebble Beach 03/08/19 Kyle / Dupson RO Building GSJ tbd TBD Cabana 3 tbd 5 Palms tbd LSJ Tile Roofs tbd Grotto tbd Jeffers 2 Roads tbd Waterfall LSJ Area tbd JPK / LSJ JPK/EB JPK / Pokey / BWS EB? Jeffers LSJ Status In Progress In Progress In Progress Not Started In Progress In Progress Not Started In Progress Not Started Not Started In Progress Not Started In Progress -= = Z , $ • .0. .00. Comments Tile is being laid, siding to start, roof installation IP, window door install Tile Samples awaiting approval. kitchen demed. tile is next step. then cabinets. etc Brian to finish deck 2 days, Roof Starting (leaves 3.5 weeks for roof install and finishes) Schedule and budget established starting on 10th of Jan. EB starting the 14th of Jan (Mason broke his hip..) Max 4.5 weeks barring no DPNR issues Dupson / Kyle to begin next week on rebar footing and pour for FDs. Then Stone walls and roof schedule dependent on walls 8 weeks tent finish We need an Architect for Plumbing / Electric drawings for RO system design. This is will cause changes to layout inside building drawn Tile back up and pipes repaired. Awaiting arrival dates of the flooring company (2 weeks from arrival of flooring company) Awaiting JPK and EB bids for this, multiple emails and calls in still awaiting pricing for outlined scope (6 week schedule) tracking down copper and EIFS. Awaiting BIN Sub proposal. Pokey coming out Monday 9 am to look at (4.5 weeks for each roof) EB pricing received. Was told to put them off and sun louvre company will do this? EB can still do this if green light is given it will be 2 weeks from start date Jeffers to Confirm Schedule / Tent start date Jan 14th Jeffers in discussion with his lawyers on credit Need to establish layout of post. then pour slab (with post leave-outs)- erect post and shade sails? 2 weeks total from start date EFTA00795982

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.