Skip to main content
Skip to content
Case File
efta-efta00798508DOJ Data Set 9Other

Bluewater Construction, Inc

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00798508
Pages
3
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Bluewater Construction, Inc 6501 Red Hook Plaza #201 St Thomas, VI, 00802 Name / Address I.SG/GSG 13rice Gordan Estimate Date Estimate # 11/30/2018 226 Cabana 4 Roof Replacement Project Description Qty Rate Total Remove and re-install new metal roof at Cabana 4. Paint new vulkem roof. Paint to be provided by owner. 18,750.00 4,200.00 18,750.00 4,200.00 Total $22,950.00 EFTA00798508 Bluewater Construction, Inc 6501 Red Hook Plaza #201 St Thomas, VI, 00802 Name / Address LSG/GSG Brice Gordan Estimate Date Estimate # 11/30/2018 227 Q-Hut Repair and Finish Project Quonset hut addition Description Qty Rate Total Removal of damaged or bent panels back to original building. Add aprox 16' to front of hut, removal of back wall of hut, and add aprox 18' of new hut. Including roll down door and man door as discussed. All material to be provided by owner. 1.200.00 16,400.00 1,200.00 16..400.00 Total \I-Nnin, EFTA00798509 Bluewater Construction, Inc 6501 Red Hook Plaza #201 St Thomas, VI, 00802 Name /Address I.SG/GSG 13rice Gordan Estimate Date Estimate # 11/30/2018 225 Staff Cottage Finish Project Bedroom addition Description Qty Rate Total Build bedroom on cistern at cottage per sketch. Including labor and material. All wood work. Including 6" ship lap wood on exterior. 40,520.00 40,520.00 Including 5' walk way deck with railing to connect main house to bedroom. Provide and install new metal roof to be painted by others. 13,200.00 13,200.00 Provide and install 6" ship lap wood on exterior of main house. 10,700.00 10,700.00 Paint existing wrap around porch, new walk way deck and all new ship lap wood on main house and new bedroom 8,700.00 8,700.00 Install owner provided ceramic tile at main house and guest house. 7,360.00 7,360.00 Plumbing work to tie into existing at main house (Fixtures to be provided by owner) 5,900.00 5,900.00 Add sub panel and outlets and switches per code. 6,700.00 6,700.00 Total $93,080.00 EFTA00798510

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.