Skip to main content
Skip to content
Case File
efta-efta00798521DOJ Data Set 9Other

LSJ Dock Work and Mooring Inspections Proposal

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00798521
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
LSJ Dock Work and Mooring Inspections Proposal 11-26-2018 To: Brice Gordon & The Saint James Group Work Scope: Lighthouse Marine (LHM) will perform an inspection of the 2 existing private moorings located just off of LSJ Dock. LHM will then scrape and clean the piles for the dock located on LSJ. Lastly LHM will removal existing RO Sea Water Intake Screen and replace with the secondary screen provided by LSJ Group. LHM proposes completion of this job to take I 1/2 dive days. Job Cost: * I Day Dive Rate (4)$1950.00 ■ 1/2 Day Dive Rate (g$1175.00 • Dive Day Rates consist of: 2 Divers, Job Supervisor, Captain, Boat, Fuel, Air, and any specialized equipment or tools needed to complete the job. Total Proposed Cost: 3125.00 C/o S.O.S. 5132 Dronningens Gade-Ste I St. Thomas, VI 00802.6909 EFTA00798521

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone802.6909

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.