Skip to main content
Skip to content
Case File
efta-efta00801803DOJ Data Set 9Other

Bluewater Construction, Inc

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00801803
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Bluewater Construction, Inc 6501 Red Hook Plaza #201 St Thomas, VI, 00802 Name /Address LSG/GSG Brice Gordan Estimate Date Estimate # 2122/2018 152 Project Guest house addition... Description Qty Rate Total GUEST HOUSE GSJ Remodel existing kitchen. "'Allowance until final design is decided/ approver"' Includes demolition, cabinet and hardware install, new closet area, fixture installation and hookup, electric and plumbing. 12,600.00 12,600.00 FRP concrete columns and pads for new deck 9,250.00 9,250.00 Build 16 x 16 structure off of existing rough floor. Including new 8 x 16 deck with handrail 22,400.00 22,400.00 Frame roof and tie into existing structure. 25,000.00 25,000.00 Materials for new structure, deck, and roof. (This is a seperate line item because it was mentioned that there may be materials on site that can be used) 36,500.00 36,500.00 Install new gutters and downspouts 2,256.00 2,256.00 Interior buildout including stud walls, drywall, flooring and paint. 27,600.00 27,600.00 Supply and Install new metal roof including tying into existing. 22,320.00 22,320.00 Sliding door at deck, and 3 windows 7,680.00 7,680.00 GR Overhead, Profit. 20% 33,121.20 33,121.20 Total 5198,727.20 EFTA00801803

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.