Case File
efta-efta00801806DOJ Data Set 9OtherGEORGE
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00801806
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
GEORGE
BRITTAIN
LAND
DESIGNS
ACCOUNT NAME:
4651 45th Street
W. Palm Beach, FL 33407
Neptune LW
358 El Brill° Way
Palm Beach, FL 33480
DATE
PROPOSAL #
7/18/2018
2572W
Bid is generated based on quantities specified on plant list, any discrepancies between quantity specified and actual quantity installed will be billed
on final invoice and will be the responsibility of the client. Pricing includes all labor. No warranty on annuals, sod, or transplants. \Varranty is void
if full payment is not received within five days of job completion. Liability for damage to utilities, wiring, etc. remains the responsibility of the
client Any damages as a result of braces being removed from trees/palms by anyone, other than a GBLD employee, will be the repsonsibility of the
client. Trees or palms which topple over where bracing has been removed by others will lose their warrranty and the client will be responsible for
the cost to upright and rebrace said items.
Initial
Please Sign and Date to indicate work authorization:
Work will be scheduled upon receipt of 50% of total cost.
SERVICE
Supply and install Liriope 1gal in base of Areca Palm by dock
along walkway
Supply and install Gardenia Bush by main House, 15 Gal
Supply and install Pink Hibiscus 3gal, on North side of Pool
Supply and install Ficus Benjamin, 25 gal
Supply and install Jasmine minima, 4"
Removal of Roebelliniee Palm in center of walkway to install
new Focal Accent Plant
Supply and Install Adinotia Palm Speciman
Supply and install Philodendron Congo for under planting 3 gal
Supply and install Cataractum Palm on East walkway, 10 gal
Supply and install Shell Ginger, 7 gal
QTY
RATE
Total Cost
125
9.79
1,223.75
1
185.00
185.00
20
18.50
370.00
8
225.00
1,800.00
150
4.29
64350
875.00
875.00
1
495.00
49500
25
21.50
537.50
2
95.00
19000
6
MOO
34800
Total Cost
$6,66725
EFTA00801806
Technical Artifacts (2)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
SWIFT/BIC
BRITTAINSWIFT/BIC
PROPOSALForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.