Skip to main content
Skip to content
Case File
efta-efta00804248DOJ Data Set 9Other

JPK DEVELOPMENT

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00804248
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JPK DEVELOPMENT RESIDENTIAL AND COMMERCIAL CONSTRUCTION ST THOMAS 00802 EMAIL TO: LSJ FOR: CONSTRUCTION COSTS TO EXPAND COTTAGE ON GSJ SCOPE: 1. Demo remaining flooring, windows, and kitchen 2. Site cistern and supervise excavation 3. Excavation to be performed by LSJ 4. Form and pour cistern 16' x 20' x8' deep with footings, 6"slab, 8" walls, 6" slab on top of cistern with I: rebar 8" oc each way. 5. Concrete to be provided by JPK apx 35 yards 6. JPK to provide forming materials and rebar 7. JPK to provide labor to construct and pour, seal and clean up site 8. LSJ to provide dumpster for trash 9. Waterproofing with hydrolic cement over snap-tie holes, coving at base of wall where cold joint exists and 2 coats of Throseal cementitious sealer 10. Install /2 " layer of cement board to existing sub floor 11. Install new tile purchased by JPK $3.00 allowance ----625 SF 12. Install new windows and sliders non impact rated 13. Dig and pour 11 footings for new expanded construction 14. Construct new open porch with flat roof between living and bedroom pod 15. Construct new bed room pod out of pressure treated framing 16' x 20' with porch 7' x16' with shed roof 16. Construct new hip roof on bedroom pod with 3x8 rafters, 1x6 T+G decking, ice and water shield, 2x4 purlins and galvanized roof to match 17. Finish interior of bedroom cottage with 5/8 green board 18. Create out door shower 19. Kitchen 12 LF with solid surface counter top 20. Create new bath and closet at rear of new pod 21. All materials to be sourced by JPK and purchased by JPK EFTA00804248 22. Painting by JPK painters 23. Electrical and plumbing by JPK 24. LSJ to provide dumpster and disposal 25. Maintain a clean work site 26. Adhere to all OSHA safety regulations and local building codes Total cost $170,004.77 EFTA00804249

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.