Skip to main content
Skip to content
Case File
efta-efta00804262DOJ Data Set 9Other

DS9 Document EFTA00804262

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00804262
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
10 13 21 22 23 2,1 LITTLE SAINT JAMES MR. JEFFREY EPSTEIN SCHEDULE: July 27, 2018 JPK DEVELOPMENT Virgin Islands RESIDENTIAL & COMMERCIAL CONSTRUCTION Wit 6501 REDS HOOK PLA2A S TE 201 a N.ELOPM . THOMAS, V.I. UI 00802 0FFICE_340.777-3100 I CELL 340.643.3245 Task Name S LI TWI F S S M IWT F S S M TWI F S SM TWI F S S M TWI F S S M TWI F S S M TWI F S S M I NN T F S Sep 2 Sep 9 Sep 16 Sep 23 Sep 30 Oct 7 Oct 1.7 Oct 21 CONCRETE TILE ROOFS - COORDINATION — — -Material Purchase (8-10 weeks lead time) - Undedayment Material -Lay Down on Slte MASTER BEDROOM - Prep Work and Installation 0. 4 Scaffold Staging Remove Galvanized Metal Roof Remove Screws Install 314" Plywood Install Vnderlayment _ __ _ _ __ _ _ Install DrIpadge _ Install Concrete Tile - LIBRARY - Prep Work and Installation S Scaffold Staging I Remove Galvanized Metal Roof — - Remove Screws Install 3/4" Plywood _I__ _ Install Underlayment 11 Install Drip-Edge Install Concrete Tile a EFTA00804262

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone340.643.3245
Phone340.777-3100

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.