Case File
efta-efta00804923DOJ Data Set 9OtherDS9 Document EFTA00804923
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00804923
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
WOO
HARDWOOD
FLOORING
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
tel 212.971-1306
fax 212-320-0381
Re: Little St. James
PROPOSAL
August 23, 2018
Install Description:
Bag off and protect adjacent areas as necessary. Remove and discard water damage flooring in the cabana 2
bathroom. Supply and deliver Hakwood's 3/4" x 7" engineered, unfinished, prime grade European Oak in random
lengths (6'-8'). Adhere a 90 mil membrane, which reduces moisture vapor transmission, water intrusion and sound
reduction, to the concrete subfloor. Mechanically fasten a''/." CDX plywood to the membrane covered concrete
subfloor. Adhere Oak plank to the plywood subfloor. Room to be covered is the pool cabana office and cabana 2
bathroom.
Bag off and protect adjacent areas as necessary. Sand Oak plank coarse, medium and fine as necessary, stain to
match approved sample and finish with commercial grade urethane.
Rooms to be covered include the cabana 2
bedroom and bathroom and the pool cabana office. At owner's discretion. damaged boards are to be replaced on a
time and materials basis. We assume the wear layer is sufficient to sand.
Job Estimate:
Notations:
/. * Includes labor and material
2.
We assume the subfloor provided for us to be smooth, flat to meet industry tolerances of 3/4" variance over a
10' span, clean and dry. Any flattening of subfloor to be done on a time and materials basis.
3. Finished floor height is proposed to be I 'A' from a flat/level substrate.
4. Customer understands and accepts that there may be a visible difference in color tone and sheen level between
newly refinished flooring and existing flooring
5. Furniture. furnishings. appliances. etc. to be removed by others prior to start date.
6. We assume the wear layer is sufficient to sand,
7. It is recommended that the baseboards, casings, and/or plinth blocks be installed after the flooring.
8. Although AHF will use reasonable and prudent measures to limit wood dust, it will be necessary for a final dust
clean-up after our scope of work.
9. Although AFIF will be careful not to damage any of the adjacent painted surfaces, it is likely that there will be some
required touch-up painting after our scope of work.
10. Due to the availability of the flooring material, estimate is valid for 30 days. After 30 days. estimate is subject to
change.
II. Proposal does not include any permit fees or security deposits.
12. Failure to pay complete contract total voids all warranties i.e. (all warranties expressed or implied).
13. No weekend/holiday work is included in contract price. If weekend/holiday work is required. there will be
schedule expedition charge to be added on an hourly basis,
Rooms
Estimate "
Pool Cabana Office
$26,690.00
Cabana 2 Bathroom
$6,050.00
Cabana 2 Bedroom
$5,330.00
Lure of Representative
1241-61 OLD OKEECHOBEE ROAD •
WEST PALM BEACH, FL 33401
• (361) 833-5720
• FAx (561) 833-5431
EFTA00804923
Technical Artifacts (7)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Fax
FAx (561) 833-5431Fax
fax 212-320-0381Phone
(361) 833-5720Phone
(561) 833-5431Phone
212-320-0381Phone
212.971-1306Wire Ref
refinishedForum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.