EFTA00804937Ilravangs and mfornial ion are for general layout purposes only. Applances, callous drawer/door appeounces, dmiensions and spacings may an from the final proms.
Case File
efta-efta00804938DOJ Data Set 9OtherLSI Dock
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00804938
Pages
1
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
LSI Dock
Scope of work:
Demo and remove the following
1. Existing Dock Bumpers
2. Existing S/S Fasteners
Straighten and or Install New Bumper fasteners where needed
Remove all existing Bumpers and Paint Dock siding with Epoxy Grey Paint
Replace bumpers.
LSJ to provide floating dock to perform work
Duration: 22 days, 2 Men
JSJ Cottage Bathroom
Scope of Work
Install New Dura Rock in Staff Cottage Bathroom
Duration: 3 Days, 2 Men
Labor Cost
Brian: $300.00 per day @ 25 days = $7500.00
Buck: $120.00 per day @ $25 days = $3000.00
Total Labor Cost: $10,500.00
All material and tools supplied by Owner.
EFTA00804938
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.