Skip to main content
Skip to content
Case File
efta-efta00804938DOJ Data Set 9Other

LSI Dock

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00804938
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
LSI Dock Scope of work: Demo and remove the following 1. Existing Dock Bumpers 2. Existing S/S Fasteners Straighten and or Install New Bumper fasteners where needed Remove all existing Bumpers and Paint Dock siding with Epoxy Grey Paint Replace bumpers. LSJ to provide floating dock to perform work Duration: 22 days, 2 Men JSJ Cottage Bathroom Scope of Work Install New Dura Rock in Staff Cottage Bathroom Duration: 3 Days, 2 Men Labor Cost Brian: $300.00 per day @ 25 days = $7500.00 Buck: $120.00 per day @ $25 days = $3000.00 Total Labor Cost: $10,500.00 All material and tools supplied by Owner. EFTA00804938

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.