LSJ and GSJ Hurricane Plan, 2018 Pre Season Check List Check Hurricane Bars and Shutters Secure Material on Top of Descal Move Containers to Top of Desal for Hurricane Storage Remove Coconuts from Palms Review Boats Trailers and move to Designated Locations Stat Phones and Radios check and confirm operation LSJ STT Vehicles Storage Top Off Fuel for Gensets, LSJ & GSJ Fill fuel Truck Organize Group Structure STT Confirm Reaction Group., Post Hurricane Order the Following Genset Oil, Filters and Batteries. RO Membranes and Filters Hydraulic, Engine Oil and Filters for Heavy Machinery Marine, oil, filters, props and lines. Hurricane Watch Empty/Bury Trash LSJ/GSJ Start closing down Storm Shutters Desal Install Blue Beach Panels, Leave opening Install Library Panels. Install Gym Panels, leave opening. Outdoor Furniture from all Locations to Tunnel Secure GSJ Main compound and Q Hut EFTA00804986 Hurricane Watch LSJ Genset, Full check of Generator fluids and operation Check Fuel Levels Manually set Transfer Switch to Generator Shut down for hurricane Closed Down Shutters RO Back wash, check chemicals, Fill Cisterns Shut down distribution pumps just prior to storm hitting Shut down RO system Close Down Shutters Shut Down Circuit breaker Panel Water Distribution Shut down the following: Pumps Prior to Storm Main Valves to Irrigation Irrigation Clocks Hot Water Circulation pumps IN Systems Circuit Breaker Panel Close Down Shutters Engineering All Equipment Operational and Fueled Skid Steer and Lull To Tunnel #2 Lull GSJ Swimming pools Close all Valves and Shut Down Pumps Half Empty Pools Propane Close all valves on manifold and main valves Shut Down Circuit Breaker Panel EFTA00804987 Library Shut Down Power at Circuit breaker Panel Secure all doors, install hurricane bars Shut Down Water Main Compound Install Hurricane Bars at all locations Pool Cabana Close Down Storm Shutter Flag Removed Power Shut Down Tiki House Propane and Power Shut Down Blue Beach Office Computers removed Shutters installed Power Shut Down Gym Power And Water Shut Down Shutters installed Staff Cottage and Sam's Place Close Down shutters Shut Down circuit Panel Shut Down Water Boats Nana GSJ Little C GSJ Sportis GSJ Nuatica GSJ PRD LSJ Mini Me TBA Big N Virgin Gorda Isolate Solar Grid EFTA00804988 TWA Hangar TBA Purchase List Landscaping Chain Saws, Still 14" x 3, 20" x 3 Blades, chains, oil, fuel mix Blowers x 2 Machetes x 20 Rakes x 10 Shovels x 10 Axes x 10 Gloves Safety Glasses Rubber Boots Household Water Roller towel Toilet Paper Trash Bags Flashlights Batteries Food TBA EFTA00804989 EFTA00804990

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefTransfer Switch

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.