November 30th 2018 Carpentry Sylvester Gaillard (lead) Boniface Laudat James Cesar Electrical Danny Etienne Keshaun Williams Notes Construction New Dock Drop Off - GSJ Construction New Shutters Cabanas - LSJ Construction New Window (opening out) Cabana 1- LS1 Construction New Window (opening out) Cabana 1 - LSJ Removal of Odd/Broken Hardware/Blind Brackets - MC - GSJ All assisted each other when required Fixed Broken Water Line Cabana 2 - LSJ Plumbing/Pump Work Under MB - LS1 Installed Landscape Lights Outside MB - IS1 Working on Installation of Electrical Plates & Devises all Cabanas - LSJ Plumbing/Pump Work Under MB - LSJ Installed Landscape Lights Outside MB - LSJ Working on Installation of Electrical Plates & Devises all Cabanas - LSJ Engineering Sheridan E. Mee (lead) Commission Carmix Equipment Removal/Disposal of all items beside Engineering Dale Mark Commission Carmix Equipment Removal/Disposal of all items beside Engineering Heavy Machinery Felito Joseph Peter St Omer Pierre Jules Assisted the Landscapers with tree placement/relocation of Irrigation Line Assisted the Landscapers with tree placement/relocation of Irrigation Line & Transporting New Soil Working on Road & Rocks Placement at Pool Cabana - LS1 (Rocks to be removed E Mail 11/30/18 JE) EFTA00805026 Housekeeping 13asillia M. Morales (lead) Irrigation Cristobal Herrera Landscaping Dupson Donissaint (lead) Liston Mercer Gael Leatham Kyle Steward Nicholas Victorin Sainsfrans Dejour Masons Onel Pierresaint Gusneme Dalce Housekeeping/Empty Twin Rm (preparation for painting) - GSJ Housekeeping/Empty Twin Rm (preparation for painting) - GS) Housekeeping/Laundry - LSJ Housekeeping/Laundry GSJ/LSJ Setting up Irrigation Lines to Grasses Pool Cabana Hillside - IS) Repaired 4 inch Broken Line Outside Cabana 2 - LSJ Prepared Large Order of Irrigation Parts Ran Entire System checking for leaks etc. - LSJ Constructed Stone Transition Pops Garden - LSJ Working Pebble Beach Construction - LS) Emptied Out/Replanted with new soil Planter Bed Top of Owners Installation Grasses Pool Cabana Hillside - LSJ Continued Planting at Top of Owners Drive Emptied Out/Replanted with new soil Planter Bed Top of Owners Continued Planting at Top of Owners Drive Emptied Out/Replanted with new soil Planter Bed Top of Owners 3:30pm - 6:0Opm - Completed Insecticide Spraying - LS) Removal of Old Grasses on Beach Line - LSJ Installation Grasses Pool Cabana Hillside - LSJ Removal of Old Grasses on Beach Line - LS) Installation Grasses Pool Cabana Hillside - LS1 All assisted with clean up all locations Constructed Stone Transition Pops Garden - LSJ Working Pebble Beach Construction - LSJ Barge Mate Drive to Relocate Drive to Relocate Drive to Relocate Irrigation Line Irrigation Line Irrigation Line EFTA00805027 Maintenance/RD Cuthbert Paul Titre Gerry Francis Titre Okeam Freeman Marine (CaptaIng Patrick Cena Randy Amparo Back Washing RO System - LS1 Cleaning/Servicing Pools LSJ/GSJ Cleaning/Servicing Pools LSJ/GSJ Cleaning Down Vehicles - end of week clean up Assisted Housekeeping with emptying Twin Rm (preparation for painting) - GS1 Completed Mold Remediation on Ceiling, Wall etc. Twin Rm - GSJ Crew Runs Between STT,LSJ,GSJ,SJ Completed Inventory of Small Parts for all Vessels Crew Runs Between STT,LSJ,GSJ,S1 Started Roping of Pillars at Tiki Both worked on getting maintance schedule set up with Offshore Marine which starts next week Office Stephanie Remington Administration - LSJ Worked on Setting Up Crew Log which will start on Monday 3rd December Painting Hilian J. Bedminister (lead) Completed Staining Dock - GSJ Continue Sanding Dock - LSJ Primed/Painted Exterior Railings - MC - LSJ Prepared & Painted Repaired Wall Blue Beach Office - ISJ Aiad Buncome Painted Back Wall Pool Cabana after Pictures Installation - LSI Painted Repaired Coping - MC - LSJ Dimitri St Omer Painted Back Wall Pool Cabana after Pictures Installation - LSJ Primed/Painted Repaired Coping - MC - LSJ Oriole Joseph Primed Painted New Door Under Master - LSJ Primed/Painted Exterior Railings - MC - L.S1 EFTA00805028

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.