Skip to main content
Skip to content
Case File
efta-efta00807181DOJ Data Set 9Other

B.V. I.

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00807181
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
B.V. I. 4aC, Nixtno Ruh gnus B.V.I. Painters Ltd P.O. Box 824, Road Town, Tortola British Virgin Islands. Tel: 284 494 4365 [email protected] Name/Address PRD Little St. James Description Labour and Material cost estimate to: Paint Topside from the waterline to the toerail . Sand entire topside . Fill and fair . Tape and mask . Spray two coats of primer . Sand Primer . Change masking tape . Spray four coats topcoat colours (Owner Choice) . Sand colours and spray 2 coats of high solid clear coat. Paint interior . Sand entire inside . Fill and Fair . Tape and Mask . Spray two coats of primer . Sand Primer . Apply four coats of Top coats in. Smooth areas . Tape off smooth areas and apply two coats in non-skid area Please note after inspection on the bottom ( Cooper Coat) we will get back to you Estimate Date 08/24/18 Estimate No. 3071 Total Quantity Cost 0.00 0.00 3,100.00 3,100.00 6,200.00 6,200.00 50% deposit before start balance due on completion. Total $9,300.00 EFTA00807181

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone284 494 4365

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.